5601 N Chester WAY

Todays Alerts

Property Streetview
Property Map

Directions

  • 5601 Chester Wy, Denver, CO 80239, USA
  • Directions

Recently Scheduled Inspections

2026-10-26 - 2025-COMMCON-0001092

08:30 AM - 09:30 AM: 108 - Final - Commercial

2026-10-23 - 2025-FIRE-0006076

11:00 AM - 01:00 PM: 412 - Final - Fire Suppression

2026-10-23 - 2026-FIRE-0000643

11:00 AM - 01:00 PM: 412 - Final - Fire Suppression

2026-10-22 - 2026-COMMCON-0000256

11:30 AM - 01:30 PM: Document Review Inspection

11:30 AM - 01:30 PM: 108 - Final - Commercial

2026-10-22 - 2026-FIRE-0001884

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-10-22 - 2026-COMMCON-0000006

11:30 AM - 01:30 PM: 108 - Final - Commercial

2026-10-21 - 2026-FIRE-0001884

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-10-21 - 2025-COMMCON-0001092

08:30 AM - 09:30 AM: 109 - Other

2026-10-20 - 2026-ACCCON-0000008

01:00 PM - 03:00 PM: 305 - Final - Access Control

2026-10-20 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-16 - 2025-FIRE-0007400

08:00 AM - 10:00 AM: 303 - Full Rough

2026-10-16 - 2026-ACCCON-0000008

11:30 AM - 01:30 PM: 305 - Final - Access Control

2026-10-16 - 2026-FIRE-0001884

01:00 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-16 - 2026-FIRE-0002300

TBD: 303 - Full Rough

2026-10-15 - 2026-FIRE-0001884

12:30 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-15 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 109 - Other

2026-10-15 - 2025-PLUMB-0011316

12:30 PM - 03:00 PM: 402 - Final - Plumbing

2026-10-14 - 2026-FIRE-0000411

08:00 AM - 10:00 AM: 303 - Full Rough

2026-10-14 - 2025-PLUMB-0006031

09:00 AM - 11:00 AM: 402 - Final - Plumbing

2026-10-14 - 2025-PLUMB-0008932

11:00 AM - 01:00 PM: 402 - Final - Plumbing

2026-10-13 - 2026-FIRE-0001884

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-10-13 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 108 - Final - Commercial

2026-10-13 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-10-13 - 2025-PLUMB-0006031

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-10-13 - 2025-PLUMB-0008932

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-10-09 - 2026-COMMCON-0001942

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-10-09 - 2026-FIRE-0001884

12:30 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-09 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-10-09 - 2025-ELEC-0005360

11:00 AM - 01:00 PM: 305 - Final - Electrical

2026-10-09 - 2025-ELEC-0009778

TBD: 305 - Final - Electrical

2026-10-09 - 2025-ELEC-0010762

TBD: 305 - Final - Electrical

2026-10-09 - 2026-ELEC-0000436

TBD: 305 - Final - Electrical

2026-10-08 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: Document Review Inspection

11:30 AM - 01:30 PM: 108 - Final - Commercial

2026-10-08 - 2026-ROOFSIDE-0000943

11:30 AM - 01:30 PM: 201 - Final - Roof

2026-10-08 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-10-06 - 2025-COMMCON-0001092

08:00 AM - 10:00 AM: Document Review Inspection

08:00 AM - 10:00 AM: 109 - Other

2026-10-05 - 2025-PLUMB-0006031

08:30 AM - 10:30 AM: 402 - Final - Plumbing

2026-10-02 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 304 - Partial Final

2026-10-01 - 2025-PLUMB-0006031

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-09-30 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-09-30 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-09-30 - 2026-ELEC-0000568

08:00 AM - 10:00 AM: 305 - Final - Electrical

2026-09-30 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 302 - Partial Rough

TBD: 304 - Partial Final

2026-09-30 - 2026-FIRE-0001884

12:15 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-09-29 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 108 - Final - Commercial

12:00 PM - 02:00 PM: 112 - Frame

2026-09-28 - 2026-FIRE-0001884

10:15 AM - 12:15 PM: 412 - Final - Fire Suppression

2026-09-28 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 109 - Other

2026-09-28 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-25 - 2026-FIRE-0001884

10:15 AM - 12:15 PM: 412 - Final - Fire Suppression

2026-09-25 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 109 - Other

2026-09-25 - 2025-PLUMB-0006031

10:15 AM - 12:15 PM: 402 - Final - Plumbing

2026-09-25 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-24 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-24 - 2025-PLUMB-0006031

08:00 AM - 10:00 AM: 402 - Final - Plumbing

2026-09-23 - 2025-FIRE-0006076

08:30 AM - 10:30 AM: 412 - Final - Fire Suppression

2026-09-23 - 2026-FIRE-0001884

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-09-23 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-22 - 2026-ELEC-0000568

12:00 PM - 02:00 PM: 305 - Final - Electrical

2026-09-21 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

11:30 AM - 01:30 PM: 109 - Other

2026-09-18 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-18 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-09-17 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-16 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-16 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 903 - Rough

2026-09-15 - 2025-PLUMB-0006031

08:00 AM - 10:30 AM: 402 - Final - Plumbing

2026-09-15 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 112 - Frame

2026-09-14 - 2025-COMMCON-0001092

09:30 AM - 11:30 AM: Document Review Inspection

09:30 AM - 11:30 AM: 107 - Drywall

09:30 AM - 11:30 AM: 112 - Frame

2026-09-14 - 2025-PLUMB-0006031

08:00 AM - 10:30 AM: 402 - Final - Plumbing

2026-09-14 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-09-11 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-10 - 2025-PLUMB-0006031

10:15 AM - 12:15 PM: 402 - Final - Plumbing

2026-09-08 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-09-04 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-03 - 2026-FIRE-0001884

12:00 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-09-03 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-09-03 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-03 - 2025-MECH-0004130

11:00 AM - 01:00 PM: 903 - Rough

2026-09-03 - 2025-PLUMB-0006031

10:00 AM - 12:00 PM: 402 - Final - Plumbing

2026-09-02 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-09-02 - 2025-PLUMB-0006031

10:15 AM - 12:15 PM: 402 - Final - Plumbing

2026-09-01 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-08-31 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-08-28 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-27 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-27 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-08-26 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 107 - Drywall

2026-08-21 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-21 - 2025-PLUMB-0006031

08:30 AM - 10:30 AM: 402 - Final - Plumbing

2026-08-21 - 2025-MECH-0004119

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-08-20 - 2025-COMMCON-0001092

09:30 AM - 11:30 AM: 107 - Drywall

2026-08-20 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 902 - Partial Rough

2026-08-19 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

2026-08-19 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 304 - Partial Final

2026-08-18 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 304 - Partial Final

2026-08-18 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-08-17 - 2025-COMMCON-0001092

09:30 AM - 11:30 AM: 112 - Frame

2026-08-17 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 304 - Partial Final

2026-08-14 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 112 - Frame

2026-08-13 - 2025-COMMCON-0001092

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 112 - Frame

2026-08-13 - 2025-ELEC-0005360

08:30 AM - 09:30 AM: 304 - Partial Final

2026-08-12 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-08-11 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-11 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 304 - Partial Final

2026-08-10 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

2026-08-10 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 304 - Partial Final

2026-08-07 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-08-06 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-08-05 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 112 - Frame

2026-08-05 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-08-04 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-04 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-08-03 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-31 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 106 - Batt Insulation

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-30 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

12:00 PM - 02:00 PM: 200 - Blown Insulation

2026-07-30 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-07-29 - 2025-FIRE-0007400

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-29 - 2026-FIRE-0002300

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-29 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 200 - Blown Insulation

2026-07-29 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-28 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

12:00 PM - 02:00 PM: 200 - Blown Insulation

2026-07-28 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-27 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-24 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-23 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-07-22 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-21 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-07-21 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 903 - Rough

2026-07-20 - 2025-COMMCON-0001092

09:00 AM - 11:00 AM: 107 - Drywall

2026-07-17 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-07-17 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 304 - Partial Final

2026-07-17 - 2026-ELEC-0000568

10:00 AM - 12:00 PM: 304 - Partial Final

2026-07-16 - 2025-COMMCON-0001092

02:00 PM - 03:00 PM: 106 - Batt Insulation

02:00 PM - 03:00 PM: 107 - Drywall

2026-07-13 - 2026-FIRE-0002300

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-07-13 - 2026-ELEC-0000568

08:30 AM - 10:30 AM: 303 - Full Rough

TBD: 300 - Slab

TBD: 309 - Walls

2026-07-08 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-07-07 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-07-06 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-07-02 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-07-01 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-06-29 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

2026-06-27 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 106 - Batt Insulation

11:30 AM - 01:30 PM: 107 - Drywall

2026-06-26 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 106 - Batt Insulation

11:30 AM - 01:30 PM: 107 - Drywall

2026-06-25 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-25 - 2025-COMMCON-0002658

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-06-24 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-06-23 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-06-23 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 301 - Underground

2026-06-23 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 903 - Rough

2026-06-22 - 2025-FIRE-0007400

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-06-22 - 2026-FIRE-0000411

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-06-22 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 302 - Partial Rough