2026-06-12 - 2022-COMMCON-0002961
10:30 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-06-12 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-06-11 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-06-11 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-10 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-06-10 - 2022-ELEC-0015153
12:00 PM - 02:00 PM: 304 - Partial Final
2026-06-10 - 2022-PLUMB-0011973
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-06-09 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-06-09 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-06-09 - 2024-ELEC-0014387
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-06-08 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-06-05 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-04 - 2024-FIRE-0003286
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-06-04 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-03 - 2024-ELEC-0014387
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-06-03 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-06-03 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-03 - 2022-PLUMB-0011973
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-06-02 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-06-02 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-01 - 2022-COMMCON-0002961
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
2026-06-01 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-05-29 - 2024-FIRE-0003286
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-05-29 - 2022-COMMCON-0002961
01:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-05-29 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-28 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-27 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-27 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-27 - 2024-ELEC-0014387
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-26 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-05-26 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-26 - 2024-ELEC-0014387
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-05-23 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-22 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-22 - 2022-ELEC-0015153
09:00 AM - 10:00 AM: 304 - Partial Final
2026-05-21 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-05-21 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-05-21 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-20 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-20 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-20 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-20 - 2024-ELEC-0014387
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-05-19 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-05-19 - 2022-ELEC-0015153
08:30 AM - 09:30 AM: 304 - Partial Final
2026-05-19 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-19 - 2022-PLUMB-0011973
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-05-18 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-18 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-15 - 2022-COMMCON-0002961
09:30 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-05-15 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-14 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-14 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-13 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-05-13 - 2022-PLUMB-0011973
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-05-12 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-12 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-11 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-11 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-05-08 - 2023-GBO-0000061
TBD: GBO - Pre Construction Meeting
2026-05-08 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-05-08 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-07 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-07 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-06 - 2022-COMMCON-0002161
10:00 AM - 12:00 PM: 108 - Final - Commercial
TBD: 103 - Waterproofing
2026-05-06 - 2022-COMMCON-0002961
10:30 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-06 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-05 - 2023-GBO-0000061
TBD: GBO - Pre Construction Meeting
2026-05-05 - 2022-COMMCON-0002161
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-05-05 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-05-05 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-04 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-05-04 - 2025-ELEC-0002496
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-04 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-05-04 - 2024-FIRE-0003461
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-05-01 - 2024-BOILERAC-0000988
08:30 AM - 11:00 AM: 704 - Final - Boiler AC
2026-05-01 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-05-01 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-05-01 - 2024-COMMCON-0002702
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-01 - 2024-PLUMB-0013069
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-05-01 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-30 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-30 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-29 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-29 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-28 - 2022-COMMCON-0002961
TBD: Document Review Inspection
2026-04-28 - 2025-COMMCON-0001068
TBD: Document Review Inspection
2026-04-28 - 2022-BOILERAC-0000889
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2026-04-28 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-28 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-04-28 - 2025-MECH-0003954
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-04-27 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-27 - 2022-ELEC-0015153
12:00 PM - 02:00 PM: 304 - Partial Final
2026-04-27 - 2025-COMMCON-0000584
TBD: 108 - Final - Commercial
2026-04-27 - 2022-MECH-0009413
TBD: 902 - Partial Rough
2026-04-24 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-24 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-24 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-04-23 - 2022-COMMCON-0002961
10:30 AM - 12:30 PM: 121 - Certificate of Occupancy
2026-04-23 - 2022-ELEC-0015153
TBD: 304 - Partial Final
2026-04-22 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-04-22 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-21 - 2025-ACCCON-0000291
09:00 AM - 10:00 AM: 304 - Partial Final
2026-04-21 - 2025-FIRE-0006998
09:30 AM - : 303 - Full Rough
2026-04-21 - 2022-ELEC-0015153
09:30 AM - 09:30 AM: 304 - Partial Final
2026-04-20 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-20 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 303 - Full Rough
2026-04-20 - 2024-FIRE-0004473
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-04-20 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-04-17 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-04-17 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-17 - 2022-ELEC-0015153
08:30 AM - 10:30 AM: 304 - Partial Final
2026-04-15 - 2022-COMMCON-0002961
09:00 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-04-15 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-15 - 2022-PLUMB-0011973
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-04-14 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-13 - 2025-ROOFSIDE-0005584
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-04-13 - 2022-ELEC-0015153
08:30 AM - 10:30 AM: 304 - Partial Final
2026-04-10 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-04-10 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-09 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 112 - Frame
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-09 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-08 - 2022-COMMCON-0002961
09:00 AM - 11:00 PM: 121 - Certificate of Occupancy
2026-04-08 - 2022-ELEC-0015153
11:30 AM - 01:30 PM: 304 - Partial Final
2026-04-07 - 2024-FIRE-0003286
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-04-07 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-04-07 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-06 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-03 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 112 - Frame
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-04-03 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-02 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-04-02 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-01 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-31 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-31 - 2022-COMMCON-0002961
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
2026-03-31 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 304 - Partial Final
2026-03-27 - 2023-FIRE-0006194
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-03-27 - 2024-FIRE-0003286
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-03-27 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-27 - 2022-COMMCON-0002961
TBD: 121 - Certificate of Occupancy
2026-03-26 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-26 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-26 - 2022-PLUMB-0011973
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-03-25 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 411 - Rough
2026-03-25 - 2022-COMMCON-0002961
09:30 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-03-25 - 2022-ELEC-0015153
08:30 AM - 09:30 AM: 304 - Partial Final
2026-03-25 - 2022-PLUMB-0011973
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-03-24 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 304 - Partial Final
07:30 AM - 09:30 AM: 303 - Full Rough
2026-03-24 - 2024-FIRE-0002454
07:30 AM - 09:30 AM: 303 - Full Rough
2026-03-24 - 2022-COMMCON-0002961
09:30 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-03-23 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-23 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-23 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-20 - 2024-FIRE-0003286
08:00 AM - 10:30 AM: 412 - Final - Fire Suppression
2026-03-20 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-20 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-19 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-19 - 2024-FIRE-0003286
08:00 AM - 10:30 AM: 412 - Final - Fire Suppression
2026-03-19 - 2022-COMMCON-0002961
09:30 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-03-19 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 303 - Full Rough
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-19 - 2022-PLUMB-0011973
08:00 AM - 10:30 AM: 401 - Rough
2026-03-18 - 2024-FIRE-0002454
07:30 AM - 09:30 AM: 303 - Full Rough
2026-03-18 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-18 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 302 - Partial Rough
07:30 AM - 09:30 AM: 303 - Full Rough
2026-03-17 - 2024-FIRE-0002454
09:30 AM - 11:30 AM: 303 - Full Rough
2026-03-17 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-17 - 2024-MECH-0003201
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-03-17 - 2022-ELEC-0015153
09:30 AM - 11:30 AM: 303 - Full Rough
09:30 AM - 11:30 AM: 304 - Partial Final
2026-03-16 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-16 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 303 - Full Rough
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-13 - 2022-ELEC-0015153
09:30 AM - 11:30 AM: 303 - Full Rough
09:30 AM - 11:30 AM: 304 - Partial Final
2026-03-13 - 2024-FIRE-0002454
09:30 AM - 11:30 AM: 303 - Full Rough
2026-03-13 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
- TBD: 107 - Drywall
2026-03-12 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 303 - Full Rough
07:30 AM - 09:30 AM: 304 - Partial Final
2026-03-12 - 2024-FIRE-0002454
07:30 AM - 09:30 AM: 303 - Full Rough
2026-03-12 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 903 - Rough
2026-03-10 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 304 - Partial Final
- TBD: 305 - Final - Electrical
2026-03-10 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-03-10 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 112 - Frame
2026-03-09 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-09 - 2024-FIRE-0003286
08:00 AM - 10:30 AM: 411 - Rough
2026-03-09 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-06 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-05 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-05 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 304 - Partial Final
2026-03-05 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 903 - Rough
2026-03-04 - 2022-COMMCON-0002961
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-03-04 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-03 - 2024-FIRE-0002454
09:30 AM - 11:30 AM: 302 - Partial Rough
2026-03-03 - 2022-ELEC-0015153
09:30 AM - 11:30 AM: 302 - Partial Rough
09:30 AM - 11:30 AM: 304 - Partial Final
2026-03-02 - 2024-FIRE-0003286
08:30 AM - 05:30 PM: 411 - Rough
2026-03-02 - 2022-COMMCON-0002961
01:00 PM - 03:00 PM: 112 - Frame
2026-02-27 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-27 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 112 - Frame
2026-02-27 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 304 - Partial Final
2026-02-26 - 2022-COMMCON-0002961
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
2026-02-26 - 2024-FIRE-0002454
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-02-26 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 304 - Partial Final
2026-02-25 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-02-25 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-02-24 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-02-24 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-02-23 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-02-23 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-02-20 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-20 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-02-20 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-19 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-02-19 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-02-18 - 2024-FIRE-0003286
10:00 AM - : DFD-Fire Pump Acceptance Test
12:00 PM - 03:00 PM: 411 - Rough
2026-02-18 - 2022-COMMCON-0002961
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-02-18 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 304 - Partial Final
2026-02-17 - 2024-FIRE-0003286
08:00 AM - 10:00 AM: 411 - Rough
10:00 AM - : DFD-Fire Pump Acceptance Test
2026-02-17 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-02-17 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 304 - Partial Final
2026-02-13 - 2024-FIRE-0003286
12:00 PM - 02:00 PM: 411 - Rough
2026-02-13 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 304 - Partial Final
2026-02-12 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-02-12 - 2022-ELEC-0015153
09:30 AM - 11:30 AM: 305 - Final - Electrical
2026-02-12 - 2024-FIRE-0003286
- TBD: 411 - Rough
2026-02-11 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 112 - Frame
2026-02-11 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-02-11 - 2025-ACCCON-0000291
09:00 AM - 11:00 AM: 304 - Partial Final
2026-02-10 - 2024-FIRE-0003286
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-02-10 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-10 - 2022-MECH-0009413
09:00 AM - 11:00 AM: 903 - Rough
2026-02-09 - 2024-FIRE-0003286
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-02-09 - 2022-PLUMB-0011973
11:00 AM - 01:00 PM: 401 - Rough
2026-02-06 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-06 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-06 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 108 - Final - Commercial
12:00 PM - 02:00 PM: 112 - Frame
2026-02-05 - 2024-FIRE-0002454
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-02-05 - 2024-FIRE-0003286
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-05 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-05 - 2022-ELEC-0015153
11:00 AM - 01:00 PM: 308 - Ceiling
2026-02-05 - 2024-FIRE-0003461
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-02-04 - 2024-FIRE-0003286
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-04 - 2022-COMMCON-0002961
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-02-04 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-02 - 2024-FIRE-0002454
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-02 - 2024-FIRE-0004473
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-02 - 2022-ELEC-0015153
08:00 AM - 10:00 AM: 308 - Ceiling
2026-01-30 - 2024-FIRE-0002454
09:30 AM - 11:30 AM: 302 - Partial Rough
2026-01-30 - 2022-COMMCON-0002961
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 112 - Frame
2026-01-30 - 2022-ELEC-0015153
09:30 AM - 11:30 AM: 302 - Partial Rough
2026-01-29 - 2024-FIRE-0003286
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-01-29 - 2024-FIRE-0002454
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-01-29 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
10:00 AM - 12:00 PM: 112 - Frame
2026-01-29 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 308 - Ceiling
2026-01-28 - 2024-FIRE-0002454
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-01-28 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-01-28 - 2022-ELEC-0015153
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-01-27 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 107 - Drywall
2026-01-26 - 2024-FIRE-0002454
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-01-26 - 2022-COMMCON-0002961
10:30 AM - 12:00 PM: 107 - Drywall
10:30 AM - 12:00 PM: 112 - Frame
2026-01-26 - 2022-ELEC-0015153
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-01-23 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-01-21 - 2024-FIRE-0004473
08:00 AM - 11:00 AM: 411 - Rough
2026-01-21 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 112 - Frame
2026-01-21 - 2022-ELEC-0015153
10:00 AM - 12:00 PM: 308 - Ceiling
2026-01-21 - 2024-FIRE-0002454
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-01-20 - 2022-ELEC-0015153
07:30 AM - 09:30 AM: 302 - Partial Rough
2026-01-20 - 2022-COMMCON-0002961
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-01-15 - 2022-COMMCON-0002961
10:00 AM - 12:00 PM: 106 - Batt Insulation