2026-09-11 - 2025-COMMCON-0000796
08:30 AM - 09:30 AM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-09 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-09 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-09 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-09-09 - 2026-PLUMB-0003780
08:30 AM - 11:30 AM: 401 - Rough
2026-09-09 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-08 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-09-08 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-08 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-05 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-04 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-03 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-03 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-09-02 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-02 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-02 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-01 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-01 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-01 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-31 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-31 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-28 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-27 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-27 - 2026-ELEC-0003951
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-27 - 2026-PLUMB-0003780
08:30 AM - 11:30 AM: 401 - Rough
2026-08-26 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-08-26 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-26 - 2025-MECH-0007065
12:00 PM - 02:00 PM: 903 - Rough
2026-08-26 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-21 - 2025-COMMCON-0000796
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 112 - Frame
2026-08-21 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-21 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-08-21 - 2026-PLUMB-0003781
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-21 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-20 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-20 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-19 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-19 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-18 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-08-18 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-18 - 2026-PLUMB-0003781
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-18 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-17 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-17 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-14 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-08-14 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-08-14 - 2026-ELEC-0003951
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-14 - 2026-PLUMB-0003780
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-13 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 112 - Frame
2026-08-13 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-13 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-08-12 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-12 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-12 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-12 - 2026-PLUMB-0003780
08:30 AM - 11:30 AM: 401 - Rough
2026-08-11 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-11 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-11 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-11 - 2026-PLUMB-0003780
08:30 AM - 11:30 AM: 401 - Rough
2026-08-10 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-10 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-08-10 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-08-10 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-07 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-07 - 2026-COMMCON-0000829
TBD: 113 - Pre Construction Meeting
2026-08-07 - 2025-COMMCON-0000796
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 112 - Frame
2026-08-07 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-06 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-06 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-08-06 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-05 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-05 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-08-04 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-04 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-08-04 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-04 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 903 - Rough
2026-08-03 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-08-03 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-31 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-31 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-30 - 2025-BOILERAC-0000818
11:00 AM - 01:00 PM: 701 - Pressure Test
2026-07-29 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-28 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-07-24 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-07-24 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-23 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-23 - 2025-COMMCON-0000796
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-23 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-07-22 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-22 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-07-21 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-07-21 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-20 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-07-20 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-07-17 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-07-17 - 2025-PLUMB-0009505
08:00 AM - 10:00 AM: 401 - Rough
2026-07-15 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-14 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-14 - 2025-PLUMB-0009505
10:00 AM - 01:00 PM: 401 - Rough
2026-07-13 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-11 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-07-10 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-10 - 2026-ROOFSIDE-0002018
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-07-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-07-10 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-07-09 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-09 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-09 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-08 - 2025-FIRE-0006554
08:30 AM - 11:30 AM: 411 - Rough
2026-07-08 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-08 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-08 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-07 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 903 - Rough
2026-07-07 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-07 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-07 - 2026-FIRE-0000859
TBD: 302 - Partial Rough
2026-07-06 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-06 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-02 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-07-02 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-07-01 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-01 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-30 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-29 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-26 - 2026-FIRE-0000859
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-26 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-24 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-23 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-23 - 2026-FIRE-0000859
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-23 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-23 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-22 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-22 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-22 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough