2026-06-13 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 112 - Frame
2026-06-12 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-12 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-12 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-11 - 2026-FIRE-0000859
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-11 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-11 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-11 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-10 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-10 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-10 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-09 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-09 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-09 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-08 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-08 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-06-08 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-08 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-06-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-03 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-03 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-02 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-02 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-06-02 - 2025-ELEC-0009877
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-06-01 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-01 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 303 - Full Rough
2026-06-01 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-05-28 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-05-28 - 2025-PLUMB-0001152
08:30 AM - 11:30 AM: 401 - Rough
2026-05-28 - 2025-MECH-0007069
08:30 AM - 09:30 AM: 903 - Rough
2026-05-27 - 2025-ELEC-0009877
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-05-27 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-05-27 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-26 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-21 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-21 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-20 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-19 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-19 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-18 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-18 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-05-18 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-15 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-15 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-14 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-05-14 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-14 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-13 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-13 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-12 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-12 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-12 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-11 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-11 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-05-11 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-08 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-08 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-07 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-07 - 2025-FIRE-0006782
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-06 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-06 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-05 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-05-05 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-02 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-01 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-01 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-05-01 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-30 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-30 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-30 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-29 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 112 - Frame
2026-04-29 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-29 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-04-29 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-28 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-28 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-27 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-24 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-24 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-22 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-04-22 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-21 - 2025-COMMCON-0000796
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-04-14 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-13 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-13 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-04-13 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-13 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-13 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-10 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-10 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-04-09 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-07 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-07 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-07 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-04-06 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-02 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-31 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-31 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-31 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 903 - Rough
2026-03-31 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-03-27 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-27 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-27 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-26 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-25 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-25 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-23 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-23 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-03-20 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-03-20 - 2025-ELEC-0005596
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-20 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-19 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-03-19 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-19 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-03-18 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-03-17 - 2025-COMMCON-0000796
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-03-13 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-03-11 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-03-10 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-03-09 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-03-09 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-03-06 - 2025-COMMCON-0000796
08:00 AM - 11:00 AM: 106 - Batt Insulation
08:00 AM - 11:00 AM: 107 - Drywall
08:00 AM - 11:00 AM: 112 - Frame
2026-03-05 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-02-27 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-02-27 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-27 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-26 - 2025-PLUMB-0001152
08:00 AM - 10:00 AM: 404 - Water Service
2026-02-26 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-25 - 2025-MECH-0007065
08:30 AM - 09:30 AM: 903 - Rough
2026-02-24 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-20 - 2025-MECH-0007069
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-02-19 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-18 - 2025-FIRE-0004657
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-18 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-17 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-02-13 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-12 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-12 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 300 - Slab
2026-02-10 - 2025-FIRE-0004657
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-02-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-10 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-09 - 2025-COMMCON-0000200
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-02-09 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-02-09 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-02-05 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-02-05 - 2025-ELEC-0009960
TBD: 305 - Final - Electrical
2026-02-04 - 2025-COMMCON-0000796
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-04 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-02-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-02-02 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-02 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-02 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-01-29 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-01-29 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-01-28 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-01-26 - 2025-ELEC-0009160
10:00 AM - 12:00 PM: 300 - Slab
2026-01-21 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-01-20 - 2025-ELEC-0009877
09:00 AM - 11:00 AM: 300 - Slab