






2026-10-27 - 2025-ELEC-0003033
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-27 - 2025-RESCON-0002467
12:00 PM - 02:00 PM: 108 - Final - Residential
12:00 PM - 02:00 PM: 109 - Other
12:00 PM - 02:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-27 - 2025-RESCON-0002468
01:00 PM - 03:00 PM: 108 - Final - Residential
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-22 - 2026-MECH-0003310
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-22 - 2026-ROOFSIDE-0001782
12:00 PM - 02:00 PM: 201 - Final - Roof
2026-10-22 - 2026-ROOFSIDE-0001783
12:00 PM - 02:00 PM: 201 - Final - Roof
2026-10-22 - 2026-ROOFSIDE-0001784
12:00 PM - 02:00 PM: 201 - Final - Roof
2026-10-21 - 2025-PLUMB-0011180
08:30 AM - 10:30 AM: 401 - Rough
2026-10-21 - 2025-PLUMB-0011182
08:30 AM - 10:30 AM: 401 - Rough
2026-10-21 - 2026-PLUMB-0000842
08:30 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-21 - 2026-PLUMB-0000850
08:30 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-20 - 2026-MECH-0003270
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-20 - 2026-MECH-0003272
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-20 - 2025-RESCON-0002456
11:30 AM - 01:29 PM: 109 - Other
2026-10-20 - 2025-RESCON-0002459
11:30 AM - 01:29 PM: 111 - Exterior Lath
2026-10-20 - 2025-RESCON-0002469
11:30 AM - 01:29 PM: 111 - Exterior Lath
2026-10-20 - 2025-RESCON-0002470
11:30 AM - 01:29 PM: 111 - Exterior Lath
2026-10-20 - 2025-RESCON-0002480
11:30 AM - 01:29 PM: 109 - Other
2026-10-20 - 2026-MECH-0003312
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-09 - 2026-MECH-0005771
09:00 AM - 11:00 AM: 903 - Rough
2026-10-09 - 2026-MECH-0005772
09:00 AM - 11:00 AM: 903 - Rough
2026-10-09 - 2026-MECH-0005880
09:00 AM - 11:00 AM: 903 - Rough
2026-10-09 - 2026-MECH-0005882
09:00 AM - 11:00 AM: 903 - Rough
2026-10-01 - 2025-RESCON-0002470
09:00 AM - 11:00 AM: 107 - Drywall
2026-10-01 - 2025-ELEC-0003034
10:00 AM - 12:00 PM: 313 - Meter Release
TBD: 303 - Full Rough
2026-09-30 - 2025-ELEC-0003034
08:00 AM - 10:00 AM: 313 - Meter Release
2026-09-29 - 2025-RESCON-0002459
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-29 - 2025-RESCON-0002469
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-29 - 2025-ELEC-0003034
10:00 AM - 12:00 PM: 313 - Meter Release
2026-09-24 - 2025-RESCON-0002455
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-09-24 - 2025-RESCON-0002478
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-09-24 - 2025-RESCON-0002479
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-09-23 - 2025-RESCON-0002460
11:30 AM - 01:30 PM: 113 - Pre Construction Meeting
2026-09-23 - 2025-RESCON-0002455
11:30 AM - 01:30 PM: 109 - Other
2026-09-23 - 2025-RESCON-0002478
11:30 AM - 01:30 PM: 109 - Other
2026-09-23 - 2025-RESCON-0002479
11:30 AM - 01:30 PM: 109 - Other
2026-09-22 - 2026-MECH-0003309
09:00 AM - 11:00 AM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-22 - 2025-RESCON-0002459
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-09-22 - 2025-RESCON-0002469
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-09-22 - 2025-RESCON-0002470
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-09-22 - 2025-RESCON-0002478
09:30 AM - 11:30 AM: 108 - Final - Residential
09:30 AM - 11:30 AM: 109 - Other
2026-09-22 - 2025-RESCON-0002479
09:30 AM - 11:30 AM: 108 - Final - Residential
08:30 AM - 05:30 PM: 109 - Other
2026-09-22 - 2026-MECH-0003313
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-22 - 2026-PLUMB-0000846
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-22 - 2026-PLUMB-0000848
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-21 - 2025-RESCON-0002460
11:30 AM - 01:30 PM: 108 - Final - Residential
11:30 AM - 01:30 PM: 109 - Other
2026-09-18 - 2026-ROOFSIDE-0002560
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002561
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002562
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002563
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002564
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002565
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-ROOFSIDE-0002566
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-18 - 2026-MECH-0004931
11:00 AM - 01:00 PM: 903 - Rough
2026-09-18 - 2026-MECH-0004934
11:00 AM - 01:00 PM: 903 - Rough
2026-09-18 - 2026-MECH-0004935
01:00 PM - 03:00 PM: 903 - Rough
2026-09-18 - 2026-PLUMB-0000842
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-18 - 2026-PLUMB-0000846
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-18 - 2026-PLUMB-0000848
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-18 - 2026-PLUMB-0000850
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-17 - 2026-MECH-0003274
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-16 - 2026-MECH-0003274
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-16 - 2025-RESCON-0002469
11:30 AM - 01:30 PM: 112 - Frame
2026-09-16 - 2025-RESCON-0002470
11:30 AM - 01:30 PM: 112 - Frame
2026-09-15 - 2026-PLUMB-0000829
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-15 - 2026-PLUMB-0000835
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-15 - 2026-PLUMB-0000838
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-15 - 2025-RESCON-0002488
11:30 AM - 01:30 PM: 113 - Pre Construction Meeting
2026-09-15 - 2025-RESCON-0002454
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-09-15 - 2025-RESCON-0002492
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-09-15 - 2025-RESCON-0002493
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-09-15 - 2025-RESCON-0002494
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-09-14 - 2025-RESCON-0002459
11:30 AM - 01:30 PM: 112 - Frame
2026-09-14 - 2025-RESCON-0002460
11:30 AM - 01:30 PM: 108 - Final - Residential
2026-09-14 - 2025-RESCON-0002469
11:30 AM - 01:30 PM: 112 - Frame
2026-09-14 - 2025-RESCON-0002470
11:30 AM - 01:30 PM: 112 - Frame
2026-09-14 - 2026-ROOFSIDE-0002560
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002561
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002562
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002563
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002564
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002565
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0002566
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-14 - 2026-PLUMB-0000829
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-14 - 2026-PLUMB-0000835
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-14 - 2026-PLUMB-0000838
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-11 - 2025-RESCON-0002454
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-11 - 2025-RESCON-0002492
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-11 - 2025-RESCON-0002493
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-11 - 2025-RESCON-0002494
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-11 - 2025-ELEC-0003034
12:00 PM - 02:30 PM: 303 - Full Rough
2026-09-09 - 2025-RESCON-0002486
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-09-02 - 2026-MECH-0002387
TBD: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-02 - 2026-MECH-0002390
TBD: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-02 - 2026-MECH-0002391
TBD: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-02 - 2026-MECH-0002392
TBD: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-08-28 - 2025-RESCON-0002487
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-08-27 - 2026-ROOFSIDE-0002560
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002561
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002562
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002563
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002564
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002565
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0002566
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-08-26 - 2025-PLUMB-0011189
08:30 AM - 10:30 AM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011190
08:30 AM - 10:30 AM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011192
08:30 AM - 10:30 AM: 401 - Rough
2026-08-20 - 2026-ROOFSIDE-0002560
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002561
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002562
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002563
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002564
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002565
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-ROOFSIDE-0002566
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-20 - 2026-MECH-0002387
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-08-20 - 2026-MECH-0002390
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-08-20 - 2026-MECH-0002391
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-08-20 - 2026-MECH-0002392
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-08-12 - 2025-RESCON-0002456
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-12 - 2025-RESCON-0002478
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-12 - 2025-RESCON-0002479
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-12 - 2025-RESCON-0002480
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-06 - 2025-PLUMB-0010489
08:15 AM - 10:15 AM: 402 - Final - Plumbing
2026-08-06 - 2025-PLUMB-0010490
08:15 AM - 10:15 AM: 402 - Final - Plumbing
2026-08-06 - 2025-PLUMB-0010491
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-08-06 - 2025-PLUMB-0010493
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-08-05 - 2025-RESCON-0002460
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-05 - 2025-RESCON-0002467
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-05 - 2025-RESCON-0002468
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-04 - 2025-RESCON-0002456
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-08-04 - 2025-RESCON-0002460
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-04 - 2025-RESCON-0002468
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-04 - 2025-RESCON-0002478
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-08-04 - 2025-RESCON-0002479
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-08-04 - 2025-RESCON-0002480
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-07-30 - 2025-RESCON-0002500
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-07-29 - 2025-RESCON-0002456
12:00 PM - 02:00 PM: 111 - Exterior Lath
2026-07-29 - 2025-RESCON-0002478
12:00 PM - 02:00 PM: 111 - Exterior Lath
2026-07-29 - 2025-RESCON-0002479
12:00 PM - 02:00 PM: 111 - Exterior Lath
2026-07-29 - 2025-RESCON-0002480
12:00 PM - 02:00 PM: 111 - Exterior Lath
2026-07-28 - 2025-RESCON-0002500
10:00 AM - 12:00 PM: 109 - Other
08:30 AM - 05:30 PM: 120 - Temporary Certificate of Occupancy
2026-07-28 - 2026-MECH-0003309
11:00 AM - 01:00 PM: 903 - Rough
2026-07-28 - 2026-MECH-0003313
11:00 AM - 01:00 PM: 903 - Rough
2026-07-27 - 2025-RESCON-0002456
11:30 AM - 01:30 PM: 112 - Frame
2026-07-27 - 2025-RESCON-0002460
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-07-27 - 2025-RESCON-0002467
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-07-27 - 2025-RESCON-0002468
09:30 AM - 11:30 AM: 106 - Batt Insulation
2026-07-27 - 2025-RESCON-0002478
11:30 AM - 01:30 PM: 112 - Frame
2026-07-27 - 2025-RESCON-0002479
11:30 AM - 01:30 PM: 112 - Frame
2026-07-27 - 2025-RESCON-0002480
11:30 AM - 01:30 PM: 112 - Frame
2026-07-23 - 2025-RESCON-0002500
10:00 AM - 12:00 PM: 108 - Final - Residential
2026-07-23 - 2026-MECH-0003268
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-22 - 2025-RESCON-0002459
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-07-22 - 2025-RESCON-0002469
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-07-22 - 2025-RESCON-0002470
09:30 AM - 11:30 AM: 105 - Exterior Sheathing
2026-07-22 - 2025-RESCON-0002500
11:30 AM - 01:30 PM: 108 - Final - Residential
2026-07-22 - 2025-PLUMB-0010494
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-07-22 - 2026-MECH-0003268
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-22 - 2026-MECH-0003309
01:00 PM - 03:00 PM: 903 - Rough
2026-07-22 - 2026-MECH-0003310
01:00 PM - 03:00 PM: 903 - Rough
2026-07-22 - 2026-MECH-0003312
01:00 PM - 03:00 PM: 903 - Rough
2026-07-22 - 2026-MECH-0003313
01:00 PM - 03:00 PM: 903 - Rough
2026-07-20 - 2025-RESCON-0002460
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-07-20 - 2025-RESCON-0002467
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-07-20 - 2025-RESCON-0002468
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-07-20 - 2026-MECH-0003268
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-07-17 - 2026-ROOFSIDE-0001785
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-07-15 - 2025-RESCON-0002460
11:30 AM - 01:30 PM: 112 - Frame
2026-07-15 - 2025-RESCON-0002467
11:30 AM - 01:30 PM: 112 - Frame
2026-07-15 - 2025-RESCON-0002468
11:30 AM - 01:30 PM: 112 - Frame
2026-07-15 - 2026-ELEC-0002564
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-07-14 - 2026-ELEC-0002564
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-13 - 2026-ELEC-0002564
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-07-09 - 2025-RESCON-0000896
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-07-09 - 2025-RESCON-0002497
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-07-09 - 2025-RESCON-0002498
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-07-09 - 2026-PLUMB-0000842
10:15 AM - 12:15 PM: 401 - Rough
2026-07-09 - 2026-PLUMB-0000846
10:15 AM - 12:15 PM: 401 - Rough
2026-07-09 - 2026-PLUMB-0000848
12:15 PM - 03:00 PM: 401 - Rough
2026-07-09 - 2026-PLUMB-0000850
12:15 PM - 03:00 PM: 401 - Rough
2026-07-06 - 2025-RESCON-0002460
11:00 AM - 01:00 PM: 112 - Frame
2026-07-06 - 2025-RESCON-0002467
11:00 AM - 01:00 PM: 112 - Frame
2026-07-06 - 2025-RESCON-0002468
11:00 AM - 01:00 PM: 112 - Frame
2026-06-30 - 2025-RESCON-0002460
10:00 AM - 12:00 PM: 112 - Frame
2026-06-30 - 2025-RESCON-0002467
10:00 AM - 12:00 PM: 112 - Frame
2026-06-30 - 2025-RESCON-0002468
10:00 AM - 12:00 PM: 112 - Frame
2026-06-30 - 2026-ELEC-0002564
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-30 - 2026-ELEC-0002566
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-30 - 2026-ELEC-0002568
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-30 - 2026-ELEC-0002569
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-30 - 2026-ELEC-0002575
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-29 - 2026-MECH-0003270
11:00 AM - 01:00 PM: 903 - Rough
2026-06-29 - 2026-MECH-0003272
11:00 AM - 01:00 PM: 903 - Rough
2026-06-29 - 2026-MECH-0003274
11:00 AM - 01:00 PM: 903 - Rough
2026-06-26 - 2025-RESCON-0000896
09:30 AM - 11:30 AM: 107 - Drywall
2026-06-26 - 2025-RESCON-0002497
09:30 AM - 11:30 AM: 107 - Drywall
2026-06-24 - 2025-RESCON-0000896
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-24 - 2025-RESCON-0002497
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-24 - 2025-RESCON-0002498
11:30 AM - 01:30 PM: 107 - Drywall
11:30 AM - 01:30 PM: 111 - Exterior Lath
2026-06-23 - 2025-RESCON-0002497
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-23 - 2025-RESCON-0002499
11:30 AM - 01:30 PM: 107 - Drywall
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-06-23 - 2025-RESCON-0002500
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 111 - Exterior Lath