Recently Scheduled Inspections

2026-06-12 - 2025-ELEC-0004750

01:00 PM - 03:00 PM: 304 - Partial Final

2026-06-10 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-06-09 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-06-09 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-06-04 - 2025-FIRE-0005705

TBD: 302 - Partial Rough

2026-06-03 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 112 - Frame

2026-06-03 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 307 - Service Equipment

2026-06-03 - 2025-FIRE-0005705

TBD: 302 - Partial Rough

2026-06-02 - 2025-FIRE-0005705

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-02 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-06-02 - 2025-ELEC-0004750

01:00 PM - 03:00 PM: 308 - Ceiling

2026-06-01 - 2025-FIRE-0005705

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-01 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-06-01 - 2025-ELEC-0004750

12:00 PM - 02:00 PM: 308 - Ceiling

2026-05-29 - 2025-FIRE-0005705

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-29 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 112 - Frame

2026-05-29 - 2025-ELEC-0004750

01:00 PM - 03:00 PM: 308 - Ceiling

2026-05-26 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 112 - Frame

2026-05-22 - 2025-FIRE-0005705

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-22 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-22 - 2025-ELEC-0004750

12:00 PM - 02:00 PM: 308 - Ceiling

2026-05-21 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

2026-05-20 - 2025-FIRE-0005705

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-05-20 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 107 - Drywall

2026-05-20 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 308 - Ceiling

2026-05-19 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

2026-05-19 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

2026-05-19 - 2025-COMMCON-0002451

09:00 AM - 11:00 AM: 113 - Pre Construction Meeting

2026-05-18 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-18 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

2026-05-15 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 307 - Service Equipment

2026-05-15 - 2025-COMMCON-0000577

10:00 AM - 12:00 PM: 107 - Drywall

2026-05-14 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-14 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 307 - Service Equipment

2026-05-13 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-12 - 2025-FIRE-0004623

09:30 AM - 11:30 AM: 411 - Rough

2026-05-12 - 2025-COMMCON-0000577

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-05-11 - 2025-FIRE-0004623

01:00 PM - 03:00 PM: 411 - Rough

2026-05-11 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-08 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-07 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-05-05 - 2026-MECH-0000606

11:00 AM - 01:00 PM: 903 - Rough

2026-05-04 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-01 - 2025-COMMCON-0000577

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-29 - 2026-BOILERAC-0000076

11:00 AM - 01:00 PM: 702 - Partial Rough

2026-04-29 - 2025-COMMCON-0000577

12:00 PM - 02:00 PM: 107 - Drywall

2026-04-29 - 2026-MECH-0000606

11:00 AM - 01:00 PM: 903 - Rough

2026-04-28 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-27 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-27 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-04-24 - 2025-FIRE-0005705

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-24 - 2025-ELEC-0004750

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-23 - 2025-FIRE-0005705

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-23 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-04-23 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-22 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-04-21 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-04-20 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-17 - 2025-FIRE-0005705

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-17 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-17 - 2025-ELEC-0004750

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-16 - 2025-FIRE-0005705

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-16 - 2025-COMMCON-0000577

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-04-16 - 2025-ELEC-0004750

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-15 - 2025-FIRE-0005705

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-15 - 2025-ELEC-0004750

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-14 - 2025-FIRE-0004623

01:00 PM - 03:00 PM: 411 - Rough

2026-04-14 - 2025-FIRE-0005705

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-14 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-14 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-14 - 2026-MECH-0000606

11:00 AM - 01:00 PM: 903 - Rough

2026-04-13 - 2025-FIRE-0005705

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-13 - 2025-COMMCON-0000577

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-04-13 - 2025-ELEC-0004750

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-04-13 - 2026-MECH-0000606

08:30 AM - 09:30 AM: 903 - Rough

2026-04-10 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-10 - 2026-MECH-0000606

11:00 AM - 01:00 PM: 903 - Rough

2026-04-09 - 2025-FIRE-0005705

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-09 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-09 - 2025-ELEC-0004750

10:00 AM - 12:00 PM: 308 - Ceiling

2026-04-08 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-04-07 - 2025-FIRE-0005705

10:30 AM - 12:30 PM: 302 - Partial Rough

2026-04-07 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-07 - 2025-ELEC-0004750

10:30 AM - 12:30 PM: 302 - Partial Rough

2026-04-07 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-04-03 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-04-02 - 2025-FIRE-0004623

10:00 AM - 12:00 PM: 411 - Rough

2026-04-02 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-04-01 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-31 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-27 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-03-26 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-26 - 2025-ELEC-0004750

12:30 PM - 03:00 PM: 301 - Underground

2026-03-25 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-03-24 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-03-23 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-20 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-03-19 - 2025-FIRE-0004623

01:00 PM - 03:00 PM: 411 - Rough

2026-03-19 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-18 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-17 - 2025-FIRE-0005705

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-03-17 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-17 - 2025-ELEC-0004750

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-03-16 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-16 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-03-16 - 2025-BOILERAC-0000504

08:30 AM - 05:30 PM: 703 - Rough

2026-03-16 - 2025-MECH-0003850

08:30 AM - 09:30 AM: 903 - Rough

2026-03-13 - 2025-PLUMB-0005795

08:30 AM - 11:30 AM: 405 - Meter Release

2026-03-13 - 2025-ELEC-0004750

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-13 - 2025-FIRE-0005705

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-13 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

2026-03-12 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-12 - 2025-MECH-0003850

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-03-11 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-03-10 - 2025-ELEC-0004750

10:30 AM - 12:30 PM: 302 - Partial Rough

- TBD: 309 - Walls

2026-03-10 - 2025-FIRE-0005705

10:30 AM - 12:30 PM: 302 - Partial Rough

2026-03-10 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-09 - 2026-BOILERAC-0000076

11:00 AM - 01:00 PM: 703 - Rough

2026-03-06 - 2025-FIRE-0005705

12:30 PM - 03:00 PM: 302 - Partial Rough

2026-03-06 - 2026-BOILERAC-0000076

08:30 AM - 05:30 PM: 703 - Rough

2026-03-06 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-06 - 2025-ELEC-0004750

12:30 PM - 03:00 PM: 302 - Partial Rough

2026-03-05 - 2025-BOILERAC-0000504

01:00 PM - 03:00 PM: 702 - Partial Rough

2026-03-05 - 2025-FIRE-0005705

12:30 PM - 03:30 PM: 302 - Partial Rough

2026-03-05 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-03-05 - 2025-ELEC-0004750

12:30 PM - 03:30 PM: 302 - Partial Rough

2026-03-05 - 2025-PLUMB-0005795

08:30 AM - 12:00 PM: 401 - Rough

2026-03-04 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 901 - Pressure Test

2026-03-03 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-03-02 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-02-27 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-02-27 - 2025-PLUMB-0005795

08:30 AM - 11:30 AM: 401 - Rough

2026-02-26 - 2025-FIRE-0004623

01:00 PM - 03:00 PM: 411 - Rough

2026-02-26 - 2025-COMMCON-0000577

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-02-26 - 2026-MECH-0000606

11:00 AM - 01:00 PM: 903 - Rough

2026-02-25 - 2025-FIRE-0005705

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-25 - 2025-COMMCON-0000577

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-02-25 - 2025-ELEC-0004750

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-24 - 2025-FIRE-0005705

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-24 - 2025-COMMCON-0000577

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-02-24 - 2025-ELEC-0004750

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-23 - 2025-FIRE-0005705

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-23 - 2025-COMMCON-0000577

09:00 AM - 11:00 PM: 107 - Drywall

09:00 AM - 11:00 PM: 112 - Frame

2026-02-23 - 2025-ELEC-0004750

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-20 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 107 - Drywall

2026-02-19 - 2025-ELEC-0004750

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-02-19 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-18 - 2025-COMMCON-0000577

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-02-18 - 2025-PLUMB-0005795

12:30 PM - 03:00 PM: 403 - Pressure Test

2026-02-17 - 2025-FIRE-0004623

10:00 AM - 12:00 PM: 411 - Rough

2026-02-17 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-02-13 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-02-13 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-02-11 - 2025-COMMCON-0000577

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

08:30 AM - 09:30 AM: 106 - Batt Insulation

2026-02-11 - 2026-MECH-0000606

01:00 PM - 03:00 PM: 903 - Rough

2026-02-10 - 2026-ROOFSIDE-0000249

11:00 AM - 01:00 PM: 206 - Other

2026-02-10 - 2025-COMMCON-0000577

12:00 PM - 02:00 PM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-02-10 - 2025-PLUMB-0005795

08:30 AM - 11:30 AM: 400 - Groundwork

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-02-09 - 2025-FIRE-0004623

12:30 PM - 02:30 PM: 411 - Rough

2026-02-09 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-02-06 - 2025-COMMCON-0000577

09:00 AM - 11:00 AM: 107 - Drywall

2026-02-05 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 112 - Frame

2026-01-30 - 2026-ROOFSIDE-0000249

11:00 AM - 01:00 PM: 205 - Pre Inspection Commercial Flat Roof

2026-01-28 - 2025-COMMCON-0000577

11:00 AM - 01:00 PM: 112 - Frame