2024-COMMCON-0000667
09:00 AM - 11:00 AM: 106 - Batt Insulation


09:00 AM - 11:00 AM: 107 - Drywall


Property Streetview
Property Map

Directions

  • 2355 E Ohio Ave, Denver, CO 80209, USA
  • Directions

Recently Scheduled Inspections

2026-10-27 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-26 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-23 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-22 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-21 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-20 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-19 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-19 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-19 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-17 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-16 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-10-16 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-16 - 2025-MECH-0008202

09:00 AM - 11:00 AM: 903 - Rough

2026-10-15 - 2025-MECH-0008202

11:00 AM - 01:00 PM: 903 - Rough

2026-10-15 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-14 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-13 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-13 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-13 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-09 - 2025-MECH-0008202

09:00 AM - 11:00 AM: 903 - Rough

2026-10-09 - 2024-COMMCON-0000667

11:30 AM - 01:30 PM: 107 - Drywall

11:30 AM - 01:30 PM: 112 - Frame

2026-10-08 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-10-08 - 2025-MECH-0008202

11:00 AM - 01:00 PM: 903 - Rough

2026-10-07 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-06 - 2024-COMMCON-0000667

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-10-05 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-02 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-10-02 - 2025-MECH-0008202

09:00 AM - 11:00 AM: 903 - Rough

2026-10-01 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-10-01 - 2025-MECH-0008202

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-09-30 - 2025-FIRE-0004634

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-09-30 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 112 - Frame

10:00 AM - 12:00 PM: 109 - Other

2026-09-30 - 2024-ELEC-0003417

09:00 AM - 11:00 AM: 302 - Partial Rough

TBD: 308 - Ceiling

2026-09-30 - 2025-MECH-0008202

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-09-30 - 2026-PLUMB-0004168

08:00 AM - 10:00 AM: 405 - Meter Release

2026-09-29 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 112 - Frame

2026-09-28 - 2024-COMMCON-0000667

10:00 AM - 12:00 PM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-09-25 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 112 - Frame

2026-09-25 - 2024-ELEC-0003417

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-25 - 2025-FIRE-0004634

08:30 AM - 05:30 PM: 302 - Partial Rough

2026-09-24 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 112 - Frame

2026-09-24 - 2024-ELEC-0003417

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-23 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-22 - 2024-COMMCON-0000667

08:30 AM - 10:30 AM: 106 - Batt Insulation

08:30 AM - 10:30 AM: 112 - Frame

2026-09-22 - 2025-MECH-0008202

09:00 AM - 11:00 AM: 903 - Rough

2026-09-21 - 2024-COMMCON-0000667

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 112 - Frame

2026-09-21 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-09-18 - 2025-FIRE-0004634

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-09-18 - 2024-ELEC-0003417

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-09-17 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-09-16 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-15 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-14 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-11 - 2026-PLUMB-0004168

11:00 AM - 01:00 PM: 401 - Rough

2026-09-10 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-10 - 2026-PLUMB-0004168

08:30 AM - 11:30 AM: 401 - Rough

2026-09-09 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-08 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-04 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

10:00 AM - 12:00 PM: 109 - Other

2026-09-03 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 105 - Exterior Sheathing

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-01 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

09:00 AM - 11:00 AM: 109 - Other

2026-08-31 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 109 - Other

2026-08-27 - 2024-COMMCON-0000667

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 111 - Exterior Lath

2026-08-26 - 2024-COMMCON-0000667

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-21 - 2025-FIRE-0004634

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-21 - 2024-ELEC-0003417

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-20 - 2024-COMMCON-0000667

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-08-20 - 2025-MECH-0000582

11:00 AM - 01:00 PM: 903 - Rough

2026-08-19 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-19 - 2024-COMMCON-0000667

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-08-19 - 2024-ELEC-0003417

TBD: 302 - Partial Rough

2026-08-18 - 2025-FIRE-0004634

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-18 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-18 - 2024-ELEC-0003417

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-18 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-08-17 - 2024-COMMCON-0000667

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

10:00 AM - 12:00 PM: 112 - Frame

2026-08-17 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-17 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-08-17 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-17 - 2026-FIRE-0002050

01:00 PM - 03:00 PM: 411 - Rough

2026-08-14 - 2025-FIRE-0007376

08:00 AM - 10:00 AM: 411 - Rough

2026-08-14 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 108 - Final - Commercial

11:00 AM - 01:00 PM: 112 - Frame

2026-08-14 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 304 - Partial Final

2026-08-14 - 2025-MECH-0008202

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-08-13 - 2024-COMMCON-0000667

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 112 - Frame

2026-08-12 - 2024-COMMCON-0000667

01:00 PM - 03:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-12 - 2025-FIRE-0007376

08:00 AM - 10:30 AM: 411 - Rough

2026-08-11 - 2026-FIRE-0004420

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-11 - 2024-COMMCON-0000667

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-10 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-07 - 2025-FIRE-0007376

10:00 AM - 12:00 PM: 411 - Rough

2026-08-07 - 2024-COMMCON-0000667

11:30 AM - 01:30 PM: 109 - Other

11:30 AM - 01:30 PM: 112 - Frame

2026-08-06 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-05 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-05 - 2025-MECH-0008202

09:00 AM - 11:00 AM: 903 - Rough

2026-08-04 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-03 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-07-31 - 2025-FIRE-0007376

01:00 PM - 03:00 PM: 411 - Rough

2026-07-31 - 2024-COMMCON-0000667

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-07-30 - 2025-FIRE-0007376

11:00 AM - 01:00 PM: 411 - Rough

2026-07-30 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 112 - Frame

2026-07-30 - 2024-ELEC-0003417

01:00 PM - 03:00 PM: 313 - Meter Release

2026-07-29 - 2025-FIRE-0007376

08:30 AM - 05:30 PM: 411 - Rough

2026-07-29 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

2026-07-29 - 2025-ELEC-0012368

12:00 PM - 02:00 PM: 313 - Meter Release

2026-07-28 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-28 - 2024-COMMCON-0000667

11:30 AM - 01:30 PM: 106 - Batt Insulation

11:30 AM - 01:30 PM: 107 - Drywall

2026-07-28 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-28 - 2025-MECH-0008202

11:00 AM - 01:00 PM: 903 - Rough

2026-07-27 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-24 - 2024-ELEC-0003417

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-24 - 2026-COMMCON-0000878

09:00 AM - 11:00 AM: 112 - Frame

2026-07-23 - 2025-FIRE-0004634

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-23 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 109 - Other

2026-07-23 - 2024-ELEC-0003417

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-22 - 2024-COMMCON-0000667

10:00 AM - 12:00 PM: 106 - Batt Insulation

2026-07-22 - 2024-ELEC-0003417

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-07-22 - 2025-FIRE-0004634

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-07-21 - 2025-FIRE-0007376

11:00 AM - 01:00 PM: 411 - Rough

2026-07-21 - 2024-COMMCON-0000667

11:00 AM - 01:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 109 - Other

2026-07-14 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 107 - Drywall

2026-07-13 - 2025-FIRE-0004634

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-07-13 - 2024-ELEC-0003417

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-07-13 - 2026-PLUMB-0004168

11:00 AM - 01:00 PM: 401 - Rough

2026-07-10 - 2024-COMMCON-0000667

09:00 AM - 11:00 AM: 112 - Frame

2026-07-08 - 2025-MECH-0008202

11:00 AM - 01:00 PM: 903 - Rough

2026-07-06 - 2024-COMMCON-0000667

01:00 PM - 03:00 PM: 109 - Other

2026-07-02 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-07-01 - 2026-PLUMB-0004168

08:00 AM - 10:00 AM: 401 - Rough

2026-06-30 - 2024-COMMCON-0000667

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-06-30 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-06-29 - 2026-PLUMB-0004168

11:00 AM - 01:00 PM: 401 - Rough

2026-06-26 - 2026-PLUMB-0004168

01:00 PM - 03:00 PM: 401 - Rough

2026-06-22 - 2025-MECH-0008202

08:30 AM - 09:30 AM: 902 - Partial Rough