2026-10-26 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 109 - Other
2026-10-23 - 2026-FIRE-0004356
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-10-23 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 109 - Other
2026-10-23 - 2026-ELEC-0004271
08:30 AM - 10:30 AM: 308 - Ceiling
2026-10-23 - 2026-ELEC-0008956
08:30 AM - 10:30 AM: 303 - Full Rough
2026-10-23 - 2026-MECH-0005165
10:30 AM - 01:00 PM: 903 - Rough
2026-10-22 - 2026-MECH-0003387
01:00 PM - 03:00 PM: 903 - Rough
2026-10-21 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-10-20 - 2026-FIRE-0004017
12:30 PM - 03:00 PM: 411 - Rough
2026-10-20 - 2026-COMMCON-0000501
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-10-20 - 2026-COMMCON-0001110
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-10-19 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-19 - 2026-COMMCON-0001110
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-16 - 2026-FIRE-0002826
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-10-16 - 2026-ELEC-0003418
08:30 AM - 10:30 AM: 305 - Final - Electrical
08:30 AM - 10:30 AM: 307 - Service Equipment
2026-10-15 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-10-15 - 2026-ELEC-0005132
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-10-14 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-10-14 - 2026-ELEC-0005132
TBD: 305 - Final - Electrical
2026-10-09 - 2026-ACCCON-0000262
TBD: 305 - Final - Access Control
2026-10-09 - 2026-FIRE-0002474
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-09 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-09 - 2026-COMMCON-0001280
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-08 - 2026-ACCCON-0000199
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-10-08 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 107 - Drywall
2026-10-08 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-08 - 2026-ELEC-0006071
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-08 - 2026-PLUMB-0004698
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-10-07 - 2026-MECH-0001298
TBD: Document Review
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-10-07 - 2026-ELEC-0006071
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-07 - 2026-PLUMB-0005365
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-07 - 2026-BOILERAC-0000167
08:30 AM - 05:30 PM: 704 - Final - Boiler AC
2026-10-07 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-07 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-05 - 2026-MECH-0003327
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-05 - 2026-FIRE-0004356
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-05 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 112 - Frame
2026-10-05 - 2026-ELEC-0004271
08:00 AM - 10:00 AM: 308 - Ceiling
2026-10-05 - 2026-MECH-0003387
08:30 AM - 11:00 AM: 902 - Partial Rough
2026-10-01 - 2026-COMMCON-0000820
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-01 - 2026-COMMCON-0000953
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-09-30 - 2026-MECH-0002634
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-30 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-30 - 2026-COMMCON-0000820
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-09-30 - 2026-ELEC-0004505
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-29 - 2026-ELEC-0004113
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-29 - 2026-MECH-0002634
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-29 - 2026-FIRE-0003713
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-09-28 - 2026-ACCCON-0000261
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-09-28 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-28 - 2026-FIRE-0003932
08:30 AM - 10:30 AM: 303 - Full Rough
2026-09-28 - 2026-FIRE-0004077
08:30 AM - 10:30 AM: 303 - Full Rough
2026-09-28 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-09-28 - 2026-ELEC-0004014
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-09-25 - 2026-ACCCON-0000261
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-09-25 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-24 - 2026-MECH-0001663
09:00 AM - 11:00 AM: Document Review
TBD: 904 - Final - Mechanical
2026-09-24 - 2026-MECH-0002682
09:00 AM - 11:00 AM: Document Review
TBD: 904 - Final - Mechanical
2026-09-24 - 2026-MECH-0004028
09:00 AM - 11:00 AM: Document Review
TBD: 904 - Final - Mechanical
2026-09-24 - 2026-ACCCON-0000250
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-09-24 - 2026-ACCCON-0000261
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-09-23 - 2026-FIRE-0002826
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-09-23 - 2026-FIRE-0002828
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-09-22 - 2026-FIRE-0004077
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-22 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-22 - 2026-PLUMB-0002352
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-22 - 2026-PLUMB-0003831
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-21 - 2026-ELEC-0004014
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-21 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-21 - 2026-MECH-0002682
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-18 - 2026-DEMO-0000145
09:00 AM - 11:00 AM: Demolition Final Inspection
2026-09-18 - 2026-FIRE-0004017
08:00 AM - 10:00 AM: 411 - Rough
2026-09-18 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 112 - Frame
2026-09-18 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-18 - 2026-ELEC-0004113
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-18 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-18 - 2026-MECH-0002682
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-18 - 2026-MECH-0003387
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-18 - 2026-MECH-0004028
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-15 - 2026-FIRE-0002826
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-15 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 109 - Other
2026-09-14 - 2026-DEMO-0000152
09:00 AM - 11:00 AM: Demolition Final Inspection
2026-09-14 - 2026-DEMO-0000153
09:00 AM - 11:00 AM: Demolition Final Inspection
2026-09-14 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 109 - Other
2026-09-14 - 2026-ELEC-0003418
09:00 AM - 11:00 AM: 304 - Partial Final
2026-09-10 - 2026-FIRE-0002474
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-10 - 2026-FIRE-0002737
01:00 PM - 03:00 PM: 303 - Full Rough
2026-09-10 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 109 - Other
2026-09-10 - 2026-COMMCON-0000953
09:00 AM - 11:00 AM: 107 - Drywall
2026-09-09 - 2026-FIRE-0002737
08:30 AM - 05:30 PM: 303 - Full Rough
2026-09-08 - 2026-FIRE-0002979
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-08 - 2026-ELEC-0006071
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-09-03 - 2026-FIRE-0002737
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0002979
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-03 - 2026-FIRE-0004077
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-03 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 109 - Other
2026-09-03 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-03 - 2026-ELEC-0004113
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-03 - 2026-PLUMB-0004759
08:00 AM - 10:00 AM: 401 - Rough
2026-09-02 - 2026-FIRE-0002474
10:00 AM - 12:00 PM: 411 - Rough
2026-09-02 - 2026-FIRE-0002826
08:00 AM - 10:00 AM: 411 - Rough
2026-09-02 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 411 - Rough
2026-09-02 - 2026-FIRE-0003713
08:00 AM - 10:00 AM: 411 - Rough
2026-09-02 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 109 - Other
2026-09-02 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 109 - Other
2026-09-02 - 2026-COMMCON-0000953
09:00 AM - 11:00 AM: 109 - Other
2026-09-02 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-02 - 2026-MECH-0003387
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-01 - 2026-FIRE-0002737
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-01 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-01 - 2026-FIRE-0004077
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-01 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 112 - Frame
2026-09-01 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-01 - 2026-ELEC-0004113
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-01 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 903 - Rough
2026-08-31 - 2026-FIRE-0002737
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-31 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-31 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 109 - Other
2026-08-31 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-31 - 2026-MECH-0002634
09:00 AM - 11:00 AM: 903 - Rough
2026-08-31 - 2026-MECH-0002682
09:00 AM - 11:00 AM: 903 - Rough
2026-08-28 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-27 - 2026-FIRE-0002739
08:00 AM - 10:00 AM: 303 - Full Rough
2026-08-27 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-27 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 109 - Other
2026-08-26 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-26 - 2026-FIRE-0002739
08:00 AM - 10:00 AM: 303 - Full Rough
2026-08-26 - 2026-FIRE-0002979
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-26 - 2026-FIRE-0003932
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-26 - 2026-COMMCON-0001280
09:00 AM - 11:00 AM: 109 - Other
2026-08-21 - 2026-FIRE-0002739
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0003932
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0004077
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-21 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 109 - Other
2026-08-21 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-21 - 2026-ELEC-0004113
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-21 - 2026-MECH-0001298
09:00 AM - 11:00 AM: 903 - Rough
2026-08-20 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 112 - Frame
2026-08-18 - 2026-FIRE-0003932
08:00 AM - 10:00 AM: 303 - Full Rough
2026-08-18 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-17 - 2026-FIRE-0003932
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-17 - 2026-MECH-0002634
09:00 AM - 11:00 AM: 903 - Rough
2026-08-17 - 2026-PLUMB-0004759
08:00 AM - 10:00 AM: 401 - Rough
2026-08-14 - 2026-FIRE-0002474
08:00 AM - 10:00 AM: 411 - Rough
2026-08-14 - 2026-FIRE-0002979
08:30 AM - 10:30 AM: 303 - Full Rough
2026-08-14 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 109 - Other
2026-08-14 - 2026-COMMCON-0001280
09:00 AM - 11:00 AM: 109 - Other
2026-08-14 - 2026-ELEC-0004271
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-08-14 - 2026-MECH-0002634
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-14 - 2026-ELEC-0002907
TBD: 302 - Partial Rough
2026-08-13 - 2026-FIRE-0002739
08:30 AM - 05:30 PM: 303 - Full Rough
2026-08-13 - 2026-COMMCON-0000635
08:30 AM - 09:30 AM: 109 - Other
2026-08-13 - 2026-ELEC-0004014
08:30 AM - 09:30 AM: 308 - Ceiling
2026-08-12 - 2026-FIRE-0003713
08:00 AM - 10:00 AM: 411 - Rough
2026-08-12 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 109 - Other
2026-08-11 - 2026-FIRE-0002828
08:00 AM - 10:00 AM: 411 - Rough
2026-08-11 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 303 - Full Rough
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-11 - 2026-FIRE-0003932
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-10 - 2026-MECH-0002682
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-07 - 2026-FIRE-0002979
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2026-COMMCON-0000635
11:00 AM - 01:00 PM: 109 - Other
2026-08-07 - 2026-ELEC-0004271
09:00 AM - 12:00 PM: 309 - Walls
2026-08-07 - 2026-MECH-0001298
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-06 - 2026-FIRE-0002474
08:00 AM - 10:00 AM: 411 - Rough
2026-08-06 - 2026-FIRE-0002826
08:00 AM - 10:00 AM: 411 - Rough
2026-08-06 - 2026-FIRE-0003932
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-08-06 - 2026-ELEC-0005132
08:30 AM - 10:30 AM: 308 - Ceiling
2026-08-06 - 2026-ELEC-0004014
TBD: 308 - Ceiling
2026-08-05 - 2026-COMMCON-0000737
09:00 AM - 11:00 AM: 112 - Frame
2026-08-05 - 2026-ELEC-0004271
09:00 AM - 11:00 AM: 309 - Walls
2026-07-31 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-31 - 2026-MECH-0001298
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-29 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-28 - 2026-ACCCON-0000199
09:00 AM - 11:00 AM: 303 - Full Rough
2026-07-28 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 112 - Frame
2026-07-28 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-28 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-27 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 112 - Frame
2026-07-24 - 2026-FIRE-0002979
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 901 - Pressure Test
2026-07-23 - 2026-FIRE-0002474
08:00 AM - 10:30 AM: 411 - Rough
2026-07-23 - 2026-FIRE-0002979
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-23 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 112 - Frame
2026-07-23 - 2026-COMMCON-0000635
09:00 AM - 11:00 AM: 112 - Frame
2026-07-23 - 2026-ELEC-0002907
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-22 - 2026-MECH-0002634
09:00 AM - 11:00 AM: Document Review
2026-07-22 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-22 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-22 - 2026-MECH-0002682
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-21 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 112 - Frame
2026-07-21 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-20 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 112 - Frame
2026-07-17 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 112 - Frame
2026-07-16 - 2026-FIRE-0002826
11:00 AM - 01:00 PM: 411 - Rough
2026-07-16 - 2026-COMMCON-0000820
09:00 AM - 11:00 AM: 112 - Frame
2026-07-15 - 2026-FIRE-0002737
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-15 - 2026-COMMCON-0000370
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-15 - 2026-MECH-0001663
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-14 - 2026-FIRE-0002739
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-14 - 2026-ELEC-0003418
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-14 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-09 - 2026-ELEC-0004505
08:30 AM - 09:30 AM: 309 - Walls
2026-07-01 - 2026-COMMCON-0001110
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-06-25 - 2026-ELEC-0004014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-23 - 2026-COMMCON-0000501
09:00 AM - 11:00 AM: 112 - Frame
2026-06-23 - 2026-PLUMB-0002352
08:00 AM - 10:00 AM: 400 - Groundwork
08:00 AM - 10:00 AM: 401 - Rough
2026-06-22 - 2026-ELEC-0003418
09:00 AM - 12:00 PM: 309 - Walls