2026-06-12 - 2024-FIRE-0004204
08:30 AM - 05:30 PM: 303 - Full Rough
2026-06-12 - 2025-FIRE-0000074
09:00 AM - 11:00 AM: 411 - Rough
2026-06-12 - 2025-FIRE-0006941
08:30 AM - 05:30 PM: 303 - Full Rough
2026-06-12 - 2025-FIRE-0007107
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-06-12 - 2025-FIRE-0007585
08:30 AM - 05:30 PM: 303 - Full Rough
2026-06-12 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-06-12 - 2024-ELEC-0003607
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-06-12 - 2025-COMMCON-0001986
08:30 AM - 09:30 AM: 112 - Frame
2026-06-12 - 2025-ELEC-0001981
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-06-11 - 2023-ELEC-0002620
10:00 AM - 12:00 PM: 308 - Ceiling
2026-06-11 - 2025-MECH-0000827
09:00 AM - 11:00 AM: 903 - Rough
2026-06-10 - 2024-COMMCON-0002723
09:00 AM - 11:00 AM: 112 - Frame
2026-06-10 - 2024-ELEC-0010607
08:00 AM - 10:00 AM: 304 - Partial Final
2026-06-10 - 2025-COMMCON-0000054
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-10 - 2025-COMMCON-0002408
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-10 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-06-09 - 2023-COMMCON-0001531
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-09 - 2024-COMMCON-0002723
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-06-09 - 2025-ELEC-0001180
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-06-09 - 2025-ELEC-0001981
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-09 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-06-05 - 2022-COMMCON-0002496
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-05 - 2023-COMMCON-0000574
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-05 - 2024-COMMCON-0000836
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-05 - 2025-COMMCON-0000054
11:00 AM - 01:00 PM: Document Review Inspection
2026-06-05 - 2025-COMMCON-0000984
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-05 - 2025-COMMCON-0002408
11:00 AM - 01:00 PM: Document Review Inspection
2026-06-05 - 2025-COMMCON-0002522
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-05 - 2024-COMMCON-0002723
12:00 PM - 01:00 PM: 107 - Drywall
12:00 PM - 01:00 PM: 112 - Frame
2026-06-04 - 2025-COMMCON-0000054
11:00 AM - 01:00 PM: Document Review Inspection
2026-06-04 - 2025-COMMCON-0002408
11:00 AM - 01:00 PM: Document Review Inspection
2026-06-04 - 2022-COMMCON-0002496
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-04 - 2023-COMMCON-0000574
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-04 - 2024-COMMCON-0000836
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-04 - 2025-COMMCON-0000984
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-04 - 2025-COMMCON-0002522
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-04 - 2025-COMMCON-0002626
11:00 AM - 01:00 PM: 112 - Frame
2026-06-03 - 2022-COMMCON-0002496
10:00 AM - 12:30 PM: Document Review Inspection
2026-06-03 - 2023-COMMCON-0000574
10:00 AM - 12:30 PM: Document Review Inspection
2026-06-03 - 2024-COMMCON-0000836
01:00 PM - 03:00 PM: Document Review Inspection
2026-06-03 - 2025-COMMCON-0000984
10:00 AM - 12:30 PM: Document Review Inspection
2026-06-03 - 2023-COMMCON-0001531
10:00 AM - 12:30 PM: 112 - Frame
2026-06-03 - 2024-COMMCON-0002723
10:00 AM - 12:30 PM: 106 - Batt Insulation
10:00 AM - 12:30 PM: 112 - Frame
2026-06-03 - 2025-ELEC-0009074
10:00 AM - 12:00 PM: 308 - Ceiling
2026-06-02 - 2022-COMMCON-0002496
09:00 AM - 11:00 AM: 109 - Other
2026-06-02 - 2023-COMMCON-0000574
09:00 AM - 11:00 AM: 109 - Other
2026-06-02 - 2024-COMMCON-0000836
09:00 AM - 11:00 AM: 109 - Other
2026-06-02 - 2024-COMMCON-0002723
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-02 - 2025-COMMCON-0000984
09:00 AM - 11:00 AM: 109 - Other
2026-06-02 - 2025-COMMCON-0002080
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-02 - 2025-COMMCON-0002522
09:00 AM - 11:00 AM: 109 - Other
2026-06-02 - 2026-ELEC-0002708
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-06-01 - 2025-FIRE-0007107
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-06-01 - 2025-FIRE-0007585
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-06-01 - 2025-ELEC-0001981
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-29 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-05-29 - 2023-MECH-0003506
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-29 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-28 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 107 - Drywall
11:00 AM - 02:00 PM: 112 - Frame
2026-05-28 - 2025-COMMCON-0002626
11:00 AM - 02:00 PM: 105 - Exterior Sheathing
2026-05-28 - 2025-FIRE-0004969
01:00 PM - 03:00 PM: 411 - Rough
2026-05-28 - 2025-FIRE-0007486
01:00 PM - 03:00 PM: 411 - Rough
2026-05-28 - 2025-COMMCON-0002522
11:00 AM - 02:00 PM: 109 - Other
2026-05-27 - 2024-COMMCON-0002723
11:00 AM - 02:00 PM: 107 - Drywall
11:00 AM - 02:00 PM: 112 - Frame
2026-05-27 - 2025-COMMCON-0002626
11:00 AM - 02:00 PM: 105 - Exterior Sheathing
2026-05-27 - 2025-PLUMB-0001168
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-05-26 - 2023-MECH-0003506
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-22 - 2024-COMMCON-0002723
11:00 AM - 02:00 PM: 106 - Batt Insulation
11:00 AM - 02:00 PM: 107 - Drywall
11:00 AM - 02:00 PM: 112 - Frame
2026-05-21 - 2025-ELEC-0001981
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-20 - 2026-FIRE-0002658
12:30 PM - 02:30 PM: 303 - Full Rough
2026-05-20 - 2023-ELEC-0005589
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-20 - 2025-ELEC-0009074
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-20 - 2025-PLUMB-0001168
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-05-19 - 2025-FIRE-0007107
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-19 - 2025-FIRE-0007585
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-19 - 2025-COMMCON-0002626
08:30 AM - 09:30 AM: 112 - Frame
2026-05-19 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-15 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 411 - Rough
2026-05-15 - 2025-FIRE-0007107
TBD: 302 - Partial Rough
2026-05-15 - 2025-FIRE-0007585
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-15 - 2023-COMMCON-0001531
10:00 AM - 12:30 PM: 108 - Final - Commercial
2026-05-15 - 2024-COMMCON-0002723
10:00 AM - 12:30 PM: 106 - Batt Insulation
10:00 AM - 12:30 PM: 107 - Drywall
10:00 AM - 12:30 PM: 109 - Other
10:00 AM - 12:30 PM: 112 - Frame
2026-05-15 - 2025-ELEC-0001981
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-14 - 2022-ELEC-0013544
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-05-13 - 2022-ELEC-0013544
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-13 - 2023-ELEC-0000916
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-13 - 2024-COMMCON-0002723
01:15 PM - 03:00 PM: 106 - Batt Insulation
01:15 PM - 03:00 PM: 107 - Drywall
2026-05-13 - 2025-ELEC-0004884
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-12 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 411 - Rough
2026-05-12 - 2025-COMMCON-0001986
10:30 AM - 12:00 PM: 106 - Batt Insulation
10:30 AM - 12:00 PM: 112 - Frame
2026-05-11 - 2023-COMMCON-0001531
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-11 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-05-11 - 2025-COMMCON-0002080
01:00 PM - 03:00 PM: 112 - Frame
2026-05-11 - 2025-ELEC-0001981
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-05-11 - 2024-COMMCON-0000877
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-08 - 2025-FIRE-0007596
11:00 AM - 02:00 PM: 411 - Rough
2026-05-08 - 2026-FIRE-0000871
08:30 AM - 05:30 PM: 411 - Rough
2026-05-08 - 2024-COMMCON-0000877
12:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-08 - 2025-PLUMB-0001168
08:00 AM - 11:00 PM: 403 - Pressure Test
2026-05-08 - 2024-COMMCON-0002723
12:00 PM - 03:00 PM: 109 - Other
2026-05-07 - 2025-BOILERAC-0000085
08:30 AM - 11:00 AM: 701 - Pressure Test
2026-05-07 - 2025-FIRE-0007596
11:00 AM - 02:00 PM: 411 - Rough
2026-05-07 - 2026-FIRE-0001189
08:30 AM - 10:30 AM: 306 - Final - Conduit Only
2026-05-07 - 2023-ELEC-0004861
08:30 AM - 10:30 AM: 308 - Ceiling
2026-05-07 - 2024-COMMCON-0002723
10:00 AM - 12:30 PM: 112 - Frame
2026-05-06 - 2025-FIRE-0006642
09:00 AM - 11:00 AM: 411 - Rough
2026-05-06 - 2025-FIRE-0007596
09:00 AM - 11:00 AM: 411 - Rough
2026-05-06 - 2023-ELEC-0004861
10:00 AM - 12:00 PM: 309 - Walls
2026-05-06 - 2024-ELEC-0009223
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-06 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-05-05 - 2025-BOILERAC-0000085
08:30 AM - 11:00 AM: 701 - Pressure Test
2026-05-05 - 2025-FIRE-0000074
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-05-05 - 2023-ELEC-0013794
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-05 - 2024-COMMCON-0002723
12:00 PM - 01:30 PM: 112 - Frame
2026-05-04 - 2023-COMMCON-0001531
08:30 AM - 09:30 AM: 112 - Frame
2026-05-04 - 2025-ELEC-0001552
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-01 - 2023-MECH-0003506
08:30 AM - 09:00 AM: 902 - Partial Rough
2026-05-01 - 2025-PLUMB-0010242
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-04-30 - 2025-FIRE-0004969
08:30 AM - 05:30 PM: 411 - Rough
2026-04-30 - 2025-FIRE-0007486
08:30 AM - 05:30 PM: 411 - Rough
2026-04-30 - 2023-ELEC-0005589
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-30 - 2023-ELEC-0007881
10:00 AM - 12:00 PM: 304 - Partial Final
TBD: 305 - Final - Electrical
2026-04-30 - 2024-COMMCON-0002723
09:00 AM - 11:00 AM: 112 - Frame
2026-04-29 - 2025-ELEC-0009074
08:30 AM - 10:30 AM: 309 - Walls
2026-04-29 - 2026-ELEC-0001498
08:30 AM - 10:30 AM: 303 - Full Rough
2026-04-28 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-04-28 - 2025-ELEC-0009074
10:00 AM - 12:00 PM: 309 - Walls
2026-04-27 - 2024-ELEC-0013733
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-04-27 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 702 - Partial Rough
2026-04-27 - 2023-ELEC-0006575
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-04-24 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-24 - 2026-FIRE-0001189
08:30 AM - 05:30 PM: 306 - Final - Conduit Only
2026-04-23 - 2024-COMMCON-0002723
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-23 - 2025-FIRE-0007107
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-23 - 2025-FIRE-0007585
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-23 - 2023-ELEC-0004861
10:00 AM - 12:00 PM: 308 - Ceiling
2026-04-23 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-23 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-04-22 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-22 - 2024-COMMCON-0002723
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-04-21 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-04-20 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-04-20 - 2025-ELEC-0001766
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-17 - 2025-FIRE-0007486
08:00 AM - 11:00 AM: 411 - Rough
2026-04-17 - 2025-FIRE-0007596
08:00 AM - 11:00 AM: 411 - Rough
2026-04-16 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-16 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-04-15 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 112 - Frame
2026-04-15 - 2025-PLUMB-0001168
08:00 AM - 01:00 PM: 403 - Pressure Test
2026-04-15 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-14 - 2025-FIRE-0000074
11:00 AM - 01:00 PM: 411 - Rough
2026-04-14 - 2025-FIRE-0004969
11:00 AM - 01:00 PM: 411 - Rough
2026-04-14 - 2025-FIRE-0007486
11:00 AM - 01:00 PM: 411 - Rough
2026-04-14 - 2023-COMMCON-0001531
12:00 PM - 03:00 PM: 108 - Final - Commercial
2026-04-14 - 2023-ELEC-0007741
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-04-14 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-13 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-04-10 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-09 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 411 - Rough
2026-04-09 - 2025-FIRE-0007107
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-09 - 2025-FIRE-0007585
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-09 - 2023-COMMCON-0001531
01:00 PM - 03:00 PM: 112 - Frame
2026-04-09 - 2023-ELEC-0005589
10:00 AM - 12:00 PM: 304 - Partial Final
2026-04-09 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-09 - 2025-ELEC-0001981
TBD: 302 - Partial Rough
2026-04-08 - 2024-FIRE-0006885
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-08 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-04-08 - 2025-FIRE-0000952
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-04-08 - 2025-FIRE-0002474
11:00 AM - 02:00 PM: 411 - Rough
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-04-08 - 2024-COMMCON-0001806
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-04-08 - 2024-COMMCON-0002723
11:00 AM - 12:30 PM: 107 - Drywall
2026-04-08 - 2025-COMMCON-0001017
11:00 AM - 12:30 PM: 108 - Final - Commercial
2026-04-08 - 2025-COMMCON-0002080
11:00 AM - 12:30 PM: 112 - Frame
2026-04-07 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-04-07 - 2024-COMMCON-0002723
01:00 AM - 03:00 PM: 112 - Frame
2026-04-07 - 2024-ELEC-0007118
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-04-06 - 2024-COMMCON-0002723
08:30 AM - 10:00 AM: 108 - Final - Commercial
2026-04-06 - 2025-ELEC-0009074
10:00 AM - 12:00 PM: 308 - Ceiling
2026-04-03 - 2023-COMMCON-0001531
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-03 - 2024-COMMCON-0002723
01:30 PM - 03:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-04-03 - 2025-FIRE-0000074
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-04-03 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-04-02 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 411 - Rough
2026-04-02 - 2023-COMMCON-0001531
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-02 - 2024-COMMCON-0002723
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-04-02 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-04-02 - 2023-COMMCON-0000135
01:00 PM - 03:00 PM: 109 - Other
2026-04-01 - 2024-FIRE-0002705
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-04-01 - 2024-FIRE-0003418
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-04-01 - 2023-ELEC-0005589
12:30 PM - 02:30 PM: 308 - Ceiling
2026-04-01 - 2023-ELEC-0007881
12:30 PM - 02:30 PM: 308 - Ceiling
2026-04-01 - 2025-PLUMB-0001168
11:00 AM - 01:00 PM: 403 - Pressure Test
2026-03-31 - 2023-FIRE-0004749
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-31 - 2023-FIRE-0006013
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-31 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-03-31 - 2025-FIRE-0006817
08:00 AM - 10:00 AM: 303 - Full Rough
2026-03-31 - 2022-ELEC-0013544
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-03-31 - 2023-ELEC-0004779
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-03-31 - 2024-COMMCON-0002723
09:00 AM - 12:00 PM: 107 - Drywall
09:00 AM - 12:00 PM: 112 - Frame
2026-03-31 - 2025-ELEC-0000778
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-03-31 - 2025-ELEC-0001981
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-03-31 - 2026-COMMCON-0000558
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-03-27 - 2025-FIRE-0006642
09:00 AM - 11:00 AM: 411 - Rough
2026-03-27 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-26 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-03-26 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 112 - Frame
2026-03-25 - 2024-FIRE-0004204
10:00 AM - 12:00 PM: 303 - Full Rough
2026-03-25 - 2024-COMMCON-0002723
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 112 - Frame
2026-03-25 - 2024-ELEC-0003607
10:00 AM - 12:00 PM: 304 - Partial Final
2026-03-24 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-03-23 - 2025-FIRE-0000074
09:00 AM - 11:00 AM: 411 - Rough
2026-03-23 - 2024-COMMCON-0001263
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-03-23 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-23 - 2025-ELEC-0001981
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-03-20 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-03-19 - 2025-FIRE-0000074
09:00 AM - 11:00 AM: 411 - Rough
2026-03-19 - 2026-FIRE-0000030
09:00 AM - 11:00 AM: 411 - Rough
2026-03-19 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-19 - 2025-COMMCON-0001246
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-19 - 2025-COMMCON-0002080
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-19 - 2026-COMMCON-0000033
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-18 - 2025-FIRE-0007586
10:00 AM - 12:00 PM: 306 - Final - Conduit Only
2026-03-18 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 105 - Exterior Sheathing
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-03-18 - 2025-COMMCON-0001246
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-03-18 - 2025-COMMCON-0002080
08:30 AM - 09:30 AM: 107 - Drywall
2026-03-18 - 2025-PLUMB-0001168
11:00 AM - 01:00 PM: 403 - Pressure Test
2026-03-18 - 2026-COMMCON-0000033
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-03-18 - 2026-ELEC-0000849
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-03-18 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-03-17 - 2024-COMMCON-0002723
11:00 AM - 02:00 PM: 107 - Drywall
11:00 AM - 02:00 PM: 112 - Frame
2026-03-16 - 2025-BOILERAC-0000085
08:30 AM - 11:00 AM: 701 - Pressure Test
2026-03-16 - 2024-COMMCON-0002723
11:00 AM - 02:00 PM: 112 - Frame
2026-03-13 - 2025-ELEC-0009074
10:00 AM - 12:00 PM: 308 - Ceiling
2026-03-13 - 2024-COMMCON-0000215
02:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-13 - 2024-COMMCON-0002723
02:00 PM - 03:00 PM: 112 - Frame
2026-03-12 - 2024-COMMCON-0000215
01:00 PM - 03:00 PM: 109 - Other
2026-03-12 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-12 - 2025-ACCCON-0000195
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-03-12 - 2025-COMMCON-0002080
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-11 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-03-11 - 2025-FIRE-0007486
09:00 AM - 11:00 AM: 411 - Rough
2026-03-10 - 2024-FIRE-0002016
08:30 AM - 10:30 AM: 411 - Rough
2026-03-10 - 2025-FIRE-0002791
08:30 AM - 10:30 AM: 411 - Rough
2026-03-10 - 2023-ELEC-0002620
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-10 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-10 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-03-10 - 2025-COMMCON-0001986
01:00 PM - 03:00 PM: 112 - Frame
2026-03-09 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-09 - 2025-ELEC-0004307
10:00 AM - 12:00 PM: 304 - Partial Final
2026-03-09 - 2025-FIRE-0007107
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-05 - 2025-ELEC-0004307
08:30 AM - 09:30 AM: 304 - Partial Final
2026-03-05 - 2025-PLUMB-0001168
08:00 AM - 12:00 PM: 403 - Pressure Test
2026-03-05 - 2025-BOILERAC-0000085
08:30 AM - 11:00 AM: 701 - Pressure Test
2026-03-05 - 2023-COMMCON-0001531
08:30 AM - 09:30 AM: 112 - Frame
2026-03-05 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-03-05 - 2025-COMMCON-0001986
08:30 AM - 09:30 AM: 112 - Frame
2026-03-04 - 2023-COMMCON-0001531
08:30 AM - 09:30 AM: 112 - Frame
2026-03-04 - 2023-MECH-0003506
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-03-04 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-03-03 - 2024-FIRE-0002705
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-03 - 2024-FIRE-0003418
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-03 - 2025-FIRE-0004969
08:00 AM - 01:00 PM: 411 - Rough
2026-03-03 - 2023-COMMCON-0001531
08:30 AM - 09:30 AM: 112 - Frame
2026-03-03 - 2023-ELEC-0005589
10:00 AM - 12:00 PM: 308 - Ceiling
2026-03-03 - 2023-ELEC-0007881
10:00 AM - 12:00 PM: 308 - Ceiling
2026-03-03 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-03-03 - 2025-ELEC-0001981
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-02 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-03-02 - 2024-COMMCON-0002723
01:30 PM - 03:00 PM: 107 - Drywall
01:30 PM - 03:00 PM: 109 - Other
01:30 PM - 03:00 PM: 112 - Frame
2026-03-02 - 2025-COMMCON-0001986
01:30 PM - 03:00 PM: 112 - Frame
2026-03-02 - 2025-COMMCON-0002080
01:30 PM - 03:00 PM: 107 - Drywall
2026-03-02 - 2025-ACCCON-0000429
01:30 PM - 03:00 PM: 305 - Final - Access Control
2026-02-27 - 2025-ACCCON-0000429
08:30 AM - 05:30 PM: 305 - Final - Access Control
2026-02-26 - 2026-FIRE-0000093
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-26 - 2026-FIRE-0000437
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-26 - 2024-COMMCON-0002723
12:00 PM - 03:00 PM: 106 - Batt Insulation
11:00 AM - 02:00 PM: 112 - Frame
2026-02-25 - 2023-FIRE-0006263
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-02-25 - 2025-ACCCON-0000212
01:00 PM - 03:00 PM: 304 - Partial Final
2026-02-25 - 2025-FIRE-0000074
11:00 AM - 01:00 PM: 411 - Rough
2026-02-25 - 2023-ELEC-0002620
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-02-25 - 2024-COMMCON-0002723
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-02-25 - 2025-COMMCON-0002080
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-02-25 - 2025-ELEC-0001981
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-02-25 - 2025-MECH-0000827
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-02-24 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-02-24 - 2025-FIRE-0004969
09:00 AM - 11:00 AM: 411 - Rough
2026-02-24 - 2023-COMMCON-0001531
08:30 AM - 09:30 AM: 112 - Frame
2026-02-24 - 2023-COMMCON-0001655
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-02-24 - 2024-COMMCON-0000068
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-02-24 - 2024-COMMCON-0000215
08:30 AM - 09:30 AM: 109 - Other
2026-02-24 - 2024-COMMCON-0001334
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-02-24 - 2025-COMMCON-0000334
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-02-24 - 2025-COMMCON-0000630
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-02-23 - 2023-COMMCON-0001531
09:00 AM - 12:00 PM: 112 - Frame
2026-02-23 - 2024-COMMCON-0002723
11:00 AM - 02:00 PM: 107 - Drywall
11:00 AM - 02:00 PM: 112 - Frame
2026-02-20 - 2025-PLUMB-0001168
08:30 AM - 10:30 AM: 403 - Pressure Test
2026-02-19 - 2025-BOILERAC-0000085
09:00 AM - 11:00 AM: 702 - Partial Rough
2026-02-19 - 2024-COMMCON-0002723
09:00 AM - 12:00 PM: 107 - Drywall
2026-02-19 - 2025-PLUMB-0001168
09:00 AM - 11:00 AM: 403 - Pressure Test
2026-02-18 - 2024-COMMCON-0002723
08:30 AM - 09:30 AM: 112 - Frame
2026-02-17 - 2026-COMMCON-0000291
09:30 AM - 11:00 AM: 113 - Pre Construction Meeting