8400 Pena BLVD

Todays Alerts

8400 Peña Blvd, Denver, CO 80249
Notify me if any times change for inspections listed under this address.

Notify me 30 minutes before the start time of this inspection.
2024-COMMCON-0002723
01:00 AM - 03:00 PM: 107 - Drywall


01:00 AM - 03:00 PM: 108 - Final - Commercial


01:00 AM - 03:00 PM: 112 - Frame


Property Streetview
Property Map

Directions

  • 8400 Peña Blvd, Denver, CO 80249, USA
  • Directions

Recently Scheduled Inspections

2026-10-27 - 2024-COMMCON-0002723

01:00 AM - 03:00 PM: 107 - Drywall

01:00 AM - 03:00 PM: 108 - Final - Commercial

01:00 AM - 03:00 PM: 112 - Frame

2026-10-26 - 2024-COMMCON-0002723

11:00 AM - 01:00 PM: 108 - Final - Commercial

2026-10-23 - 2025-FIRE-0007107

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-10-23 - 2025-FIRE-0007585

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-10-23 - 2025-ELEC-0001981

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-23 - 2026-COMMCON-0000101

11:00 AM - 01:00 PM: 112 - Frame

2026-10-22 - 2024-COMMCON-0002723

01:00 PM - 03:00 PM: 107 - Drywall

2026-10-21 - 2026-COMMCON-0000882

08:30 AM - 09:30 AM: 112 - Frame

2026-10-21 - 2025-COMMCON-0002626

01:00 AM - 03:00 PM: 103 - Waterproofing

2026-10-20 - 2023-COMMCON-0000280

TBD: Document Review Inspection

2026-10-20 - 2026-COMMCON-0002000

TBD: 113 - Pre Construction Meeting

2026-10-20 - 2026-FIRE-0003436

09:00 AM - 11:00 AM: 411 - Rough

2026-10-20 - 2026-COMMCON-0000882

08:30 AM - 09:30 AM: 112 - Frame

2026-10-20 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 702 - Partial Rough

2026-10-19 - 2024-COMMCON-0002723

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0000269

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0000551

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0000997

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0001286

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0001775

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0002338

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-COMMCON-0002610

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2026-COMMCON-0000592

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2026-COMMCON-0000796

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2026-COMMCON-0001784

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-19 - 2025-FIRE-0007107

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-10-19 - 2022-COMMCON-0002816

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-10-16 - 2025-COMMCON-0000551

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-16 - 2025-COMMCON-0001775

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-16 - 2025-COMMCON-0002610

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-16 - 2026-COMMCON-0000592

TBD: Document Review Inspection

2026-10-16 - 2026-COMMCON-0000796

10:00 AM - 12:15 PM: Document Review Inspection

2026-10-16 - 2026-COMMCON-0001784

10:00 AM - 12:15 PM: Document Review Inspection

2026-10-16 - 2025-FIRE-0007107

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-16 - 2025-FIRE-0007585

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-16 - 2024-COMMCON-0002723

08:00 AM - 10:00 AM: 112 - Frame

2026-10-16 - 2025-COMMCON-0000383

10:00 AM - 12:15 PM: 106 - Batt Insulation

2026-10-16 - 2025-ELEC-0001981

10:00 AM - 12:00 PM: 303 - Full Rough

12:30 PM - 02:30 PM: 304 - Partial Final

2026-10-16 - 2026-COMMCON-0000101

08:00 AM - 10:00 AM: 112 - Frame

2026-10-16 - 2026-COMMCON-0001917

10:00 AM - 12:15 PM: 107 - Drywall

2026-10-15 - 2023-FIRE-0008521

01:00 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-15 - 2025-FIRE-0001982

01:00 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-15 - 2023-COMMCON-0000280

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-15 - 2025-ELEC-0009074

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-15 - 2025-PLUMB-0001168

01:00 PM - 03:00 PM: 401 - Rough

2026-10-14 - 2025-COMMCON-0002626

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-10-14 - 2026-COMMCON-0000882

01:00 PM - 03:00 PM: 112 - Frame

2026-10-14 - 2026-COMMCON-0001931

TBD: 113 - Pre Construction Meeting

2026-10-14 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 703 - Rough

2026-10-14 - 2025-FIRE-0004969

01:00 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-14 - 2025-COMMCON-0000383

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-10-14 - 2025-ELEC-0009074

10:00 AM - 12:00 PM: 304 - Partial Final

2026-10-14 - 2025-MECH-0000827

09:00 AM - 11:00 AM: 903 - Rough

2026-10-14 - 2025-PLUMB-0001168

01:00 PM - 03:00 PM: 401 - Rough

2026-10-14 - 2026-COMMCON-0000101

01:00 PM - 03:00 PM: 112 - Frame

2026-10-13 - 2026-COMMCON-0001928

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-10-13 - 2026-COMMCON-0001935

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-10-13 - 2025-COMMCON-0002626

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-10-13 - 2026-COMMCON-0000882

01:00 PM - 03:00 PM: 112 - Frame

2026-10-13 - 2026-COMMCON-0001176

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-09 - 2026-COMMCON-0000083

01:00 PM - 03:00 PM: 112 - Frame

2026-10-09 - 2025-PLUMB-0001168

01:00 PM - 03:00 PM: 403 - Pressure Test

2026-10-08 - 2025-COMMCON-0000551

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2025-COMMCON-0001775

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2025-COMMCON-0002610

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2026-COMMCON-0000592

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2026-COMMCON-0000796

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2026-COMMCON-0001176

08:00 AM - 10:00 AM: Document Review Inspection

2026-10-08 - 2026-COMMCON-0001784

01:00 PM - 03:00 PM: Document Review Inspection

2026-10-08 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 701 - Pressure Test

2026-10-08 - 2024-COMMCON-0002723

01:00 PM - 03:00 PM: 112 - Frame

2026-10-08 - 2025-PLUMB-0001168

09:00 AM - 11:00 AM: 403 - Pressure Test

2026-10-08 - 2026-COMMCON-0000083

01:00 PM - 03:00 PM: 112 - Frame

2026-10-08 - 2026-COMMCON-0001209

01:00 PM - 03:00 PM: 112 - Frame

2026-10-07 - 2026-COMMCON-0001874

08:00 AM - 10:00 AM: 113 - Pre Construction Meeting

2026-10-07 - 2026-COMMCON-0001906

08:00 AM - 10:00 AM: 113 - Pre Construction Meeting

2026-10-07 - 2026-COMMCON-0001916

08:00 AM - 10:00 AM: 113 - Pre Construction Meeting

2026-10-07 - 2026-COMMCON-0001917

08:00 AM - 10:00 AM: 113 - Pre Construction Meeting

2026-10-07 - 2026-FIRE-0003040

10:00 AM - 12:00 PM: 303 - Full Rough

2026-10-07 - 2023-ELEC-0002620

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-10-07 - 2026-COMMCON-0001356

01:00 PM - 03:00 PM: 112 - Frame

2026-10-05 - 2026-COMMCON-0001209

01:00 PM - 03:00 PM: 112 - Frame

2026-10-02 - 2025-BOILERAC-0000249

09:00 AM - 11:00 AM: 704 - Final - Boiler AC

2026-10-02 - 2023-COMMCON-0000906

11:30 AM - 01:00 PM: 108 - Final - Commercial

2026-10-02 - 2023-COMMCON-0002230

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-02 - 2024-COMMCON-0000592

09:00 AM - 11:00 AM: 108 - Final - Commercial

2026-10-02 - 2024-COMMCON-0002260

09:00 AM - 11:00 AM: 108 - Final - Commercial

2026-10-02 - 2024-COMMCON-0002723

09:00 AM - 11:00 AM: 112 - Frame

2026-10-02 - 2025-COMMCON-0000254

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-02 - 2025-COMMCON-0000382

01:00 PM - 03:00 PM: 112 - Frame

2026-10-02 - 2025-MECH-0002268

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-10-02 - 2025-PLUMB-0001168

01:00 PM - 03:00 PM: 405 - Meter Release

2026-10-02 - 2026-COMMCON-0000507

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-10-02 - 2026-COMMCON-0000790

11:30 AM - 01:00 PM: 108 - Final - Commercial

2026-10-01 - 2025-COMMCON-0002626

11:00 AM - 01:00 PM: 107 - Drywall

2026-10-01 - 2025-MECH-0008350

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-09-30 - 2025-FIRE-0007107

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-30 - 2025-FIRE-0007585

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-30 - 2025-COMMCON-0000383

08:30 AM - 09:30 AM: 107 - Drywall

2026-09-30 - 2025-ELEC-0001981

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-30 - 2026-COMMCON-0000101

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-09-28 - 2023-COMMCON-0000135

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2023-COMMCON-0000712

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2023-COMMCON-0002247

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2024-COMMCON-0000673

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2024-COMMCON-0000831

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2025-COMMCON-0000149

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2025-COMMCON-0000999

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2026-COMMCON-0001725

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-28 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 702 - Partial Rough

2026-09-25 - 2023-COMMCON-0000135

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2023-COMMCON-0000712

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2023-COMMCON-0002247

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2024-COMMCON-0000673

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2024-COMMCON-0000831

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2025-COMMCON-0000149

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2025-COMMCON-0000999

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-25 - 2026-COMMCON-0001725

08:00 AM - 09:00 AM: Document Review Inspection

2026-09-24 - 2023-COMMCON-0000135

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2023-COMMCON-0000712

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2023-COMMCON-0002247

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2024-COMMCON-0000673

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2024-COMMCON-0000831

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2025-COMMCON-0000149

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2025-COMMCON-0000999

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2026-COMMCON-0001725

07:30 AM - 09:30 AM: Document Review Inspection

2026-09-24 - 2024-BOILERAC-0000886

09:00 AM - 11:00 AM: 704 - Final - Boiler AC

2026-09-24 - 2025-ELEC-0009241

12:30 PM - 02:30 PM: 303 - Full Rough

12:30 PM - 02:30 PM: 305 - Final - Electrical

2026-09-24 - 2026-COMMCON-0000101

08:30 AM - 09:30 AM: 107 - Drywall

2026-09-23 - 2025-PLUMB-0001168

01:00 PM - 03:00 PM: 401 - Rough

2026-09-23 - 2026-COMMCON-0000101

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-22 - 2023-COMMCON-0000135

TBD: Document Review Inspection

2026-09-22 - 2023-COMMCON-0000712

TBD: Document Review Inspection

2026-09-22 - 2023-COMMCON-0002247

TBD: Document Review Inspection

2026-09-22 - 2024-COMMCON-0000673

TBD: Document Review Inspection

2026-09-22 - 2024-COMMCON-0000831

TBD: Document Review Inspection

2026-09-22 - 2025-COMMCON-0000149

TBD: Document Review Inspection

2026-09-22 - 2025-COMMCON-0000999

TBD: Document Review Inspection

2026-09-22 - 2026-COMMCON-0001725

11:00 AM - 01:00 PM: Document Review Inspection

2026-09-22 - 2025-FIRE-0007107

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-22 - 2025-FIRE-0007585

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-22 - 2026-FIRE-0003436

01:00 PM - 03:00 PM: 411 - Rough

2026-09-22 - 2025-COMMCON-0000382

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-22 - 2025-ELEC-0001981

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-22 - 2026-COMMCON-0000101

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-22 - 2026-COMMCON-0000882

11:00 AM - 01:00 PM: 112 - Frame

2026-09-21 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 703 - Rough

2026-09-21 - 2025-ELEC-0001981

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-17 - 2024-COMMCON-0002723

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-17 - 2026-COMMCON-0000101

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-17 - 2026-COMMCON-0001285

01:00 PM - 03:00 PM: 112 - Frame

2026-09-17 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 701 - Pressure Test

2026-09-17 - 2025-FIRE-0007107

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-17 - 2025-FIRE-0007585

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-17 - 2025-ELEC-0001981

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-17 - 2025-ELEC-0009074

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-17 - 2025-PLUMB-0001168

09:00 AM - 11:00 AM: 401 - Rough

2026-09-16 - 2026-COMMCON-0000101

08:30 AM - 09:30 AM: 112 - Frame

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-16 - 2024-COMMCON-0002723

08:30 AM - 09:30 AM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-16 - 2026-COMMCON-0001285

01:00 PM - 03:00 PM: 112 - Frame

2026-09-15 - 2025-FIRE-0007107

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-15 - 2025-FIRE-0007585

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-15 - 2025-COMMCON-0000383

01:00 PM - 03:00 PM: 112 - Frame

2026-09-15 - 2025-ELEC-0001981

12:30 PM - 02:30 PM: 302 - Partial Rough

2026-09-15 - 2026-COMMCON-0000101

01:00 PM - 03:00 PM: 112 - Frame

2026-09-14 - 2025-FIRE-0007107

08:30 AM - 05:30 PM: 302 - Partial Rough

2026-09-14 - 2025-FIRE-0007585

08:30 AM - 05:30 PM: 303 - Full Rough

2026-09-14 - 2023-COMMCON-0000280

10:00 AM - 12:00 PM: 108 - Final - Commercial

2026-09-14 - 2025-ELEC-0001981

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-09-14 - 2025-PLUMB-0001168

10:00 AM - 12:00 PM: 401 - Rough

10:00 AM - 12:00 PM: 403 - Pressure Test

2026-09-11 - 2023-COMMCON-0001032

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-09-10 - 2025-COMMCON-0002338

10:00 AM - 12:30 PM: Document Review Inspection

2026-09-10 - 2024-FIRE-0002016

11:00 AM - 01:00 PM: 412 - Final - Fire Suppression

2026-09-10 - 2026-FIRE-0000872

11:00 AM - 01:00 PM: 412 - Final - Fire Suppression

2026-09-10 - 2026-FIRE-0003436

01:00 PM - 03:00 PM: 411 - Rough

2026-09-10 - 2023-COMMCON-0000280

01:00 PM - 03:00 PM: 108 - Final - Commercial

01:00 PM - 03:00 PM: 109 - Other

2026-09-10 - 2023-COMMCON-0001531

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-09-10 - 2024-COMMCON-0002723

10:00 AM - 12:30 PM: 107 - Drywall

10:00 AM - 12:30 PM: 112 - Frame

2026-09-10 - 2025-COMMCON-0000864

10:00 AM - 12:30 PM: 108 - Final - Commercial

2026-09-10 - 2025-COMMCON-0001397

10:00 AM - 12:30 PM: 108 - Final - Commercial

2026-09-10 - 2026-COMMCON-0000101

08:30 AM - 09:30 AM: 112 - Frame

2026-09-10 - 2026-COMMCON-0000598

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-09-10 - 2026-ELEC-0007538

TBD: 305 - Final - Electrical

2026-09-09 - 2025-COMMCON-0002626

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-09-08 - 2024-ELEC-0007471

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-09-08 - 2025-BOILERAC-0000085

09:00 AM - 11:00 AM: 703 - Rough

2026-09-04 - 2023-COMMCON-0000280

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2023-COMMCON-0000906

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2023-COMMCON-0002230

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2024-COMMCON-0000592

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2024-COMMCON-0002260

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2025-COMMCON-0000269

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-04 - 2025-COMMCON-0002338

01:00 PM - 03:00 PM: Document Review Inspection

2026-09-03 - 2023-MECH-0003506

09:00 AM - 11:00 AM: 904 - Final - Mechanical