2026-10-27 - 2024-PLUMB-0011686
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-26 - 2024-BOILERAC-0000925
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-10-26 - 2025-ACCCON-0000459
09:30 AM - 11:00 AM: 304 - Partial Final
2026-10-26 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-26 - 2024-MECH-0008125
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-23 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-22 - 2024-ELEC-0010905
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-21 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-10-21 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-10-20 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-20 - 2025-FIRE-0002211
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-20 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-20 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-19 - 2024-BOILERAC-0000842
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-10-19 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-19 - 2025-FIRE-0002211
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-19 - 2024-MECH-0007566
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-19 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-16 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-15 - 2025-FIRE-0002005
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-15 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-13 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-10-09 - 2025-FIRE-0002005
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-08 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
09:00 AM - 11:00 AM: 411 - Rough
2026-10-08 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-08 - 2024-COMMCON-0002203
09:29 AM - 11:00 AM: 112 - Frame
2026-10-08 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-10-07 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-07 - 2025-FIRE-0002211
11:00 AM - 01:00 PM: 411 - Rough
2026-10-07 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-06 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-05 - 2025-FIRE-0002211
08:00 AM - 10:00 AM: 411 - Rough
2026-10-05 - 2024-COMMCON-0002203
08:30 AM - 09:30 AM: 112 - Frame
TBD: 109 - Other
2026-10-02 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-01 - 2026-FIRE-0002638
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-10-01 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-01 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-30 - 2026-COMMCON-0001061
09:30 AM - 11:00 AM: Document Review Inspection
09:30 AM - 11:00 AM: 108 - Final - Commercial
2026-09-30 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-09-29 - 2026-COMMCON-0001055
TBD: Document Review Inspection
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-09-29 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2026-FIRE-0002638
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-29 - 2024-ELEC-0011445
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-28 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-25 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-24 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2026-FIRE-0002638
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-24 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-24 - 2024-ELEC-0011445
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-23 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 411 - Rough
2026-09-23 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-23 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-23 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-23 - 2024-PLUMB-0012380
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-09-22 - 2025-FIRE-0003659
02:00 PM - 04:00 PM: 302 - Partial Rough
2026-09-22 - 2024-ELEC-0010905
02:00 PM - 04:00 PM: 304 - Partial Final
2026-09-21 - 2024-BOILERAC-0000925
10:00 AM - 12:00 PM: 703 - Rough
2026-09-17 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-17 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-17 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 302 - Partial Rough
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-09-14 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-03 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 303 - Full Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-02 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-02 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-02 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-02 - 2026-MECH-0002839
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-01 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-01 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-01 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-01 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-08-31 - 2024-BOILERAC-0000842
12:00 PM - 02:00 PM: 703 - Rough
2026-08-31 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-31 - 2026-FIRE-0002097
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-31 - 2024-COMMCON-0002203
12:00 PM - 02:00 PM: 112 - Frame
2026-08-31 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-28 - 2025-ELEC-0006256
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-28 - 2026-ELEC-0000207
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-28 - 2026-ELEC-0005440
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-27 - 2026-ELEC-0000207
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-08-27 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-26 - 2025-FIRE-0002005
08:00 AM - 10:30 AM: 411 - Rough
2026-08-26 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-26 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-26 - 2025-COMMCON-0002567
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-08-26 - 2026-COMMCON-0000642
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-08-26 - 2026-ELEC-0000207
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-21 - 2025-COMMCON-0002638
09:30 AM - 11:00 AM: Document Review Inspection
09:30 AM - 11:00 AM: 108 - Final - Commercial
2026-08-21 - 2026-MECH-0002839
10:00 AM - 12:00 PM: 903 - Rough
2026-08-19 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-18 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-15 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-14 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-14 - 2024-PLUMB-0012380
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-08-14 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-11 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 304 - Partial Final
2026-08-10 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-08-07 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2026-FIRE-0002097
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-08-06 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-08-06 - 2025-COMMCON-0001532
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0001810
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0001843
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0002570
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2026-COMMCON-0000981
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-05 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001532
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001810
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001843
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0002570
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2026-COMMCON-0000981
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-05 - 2026-FIRE-0002097
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-05 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-04 - 2025-COMMCON-0001532
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0001810
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0001843
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0002570
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-04 - 2026-FIRE-0002097
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-04 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-03 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-08-03 - 2024-PLUMB-0012380
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-07-31 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-31 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
2026-07-31 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 304 - Partial Final
2026-07-31 - 2024-PLUMB-0012380
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-07-30 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-30 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-30 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 903 - Rough
2026-07-29 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-29 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-29 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-29 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-29 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-28 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-28 - 2024-PLUMB-0012380
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-27 - 2025-FIRE-0003659
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-27 - 2026-FIRE-0002097
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-27 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
2026-07-27 - 2024-ELEC-0010905
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-24 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-24 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-07-23 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-23 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
2026-07-23 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-22 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-21 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 411 - Rough
2026-07-21 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-21 - 2025-ELEC-0013395
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-20 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-20 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-20 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-20 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-17 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-17 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-07-17 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-16 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-16 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
2026-07-16 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-15 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-15 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-14 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-14 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-07-14 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-07-13 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-13 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-13 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-10 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-10 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-10 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-09 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-09 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-09 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-08 - 2026-FIRE-0002638
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-08 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-08 - 2025-ELEC-0006256
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-08 - 2025-ELEC-0012467
09:00 AM - 11:00 AM: 307 - Service Equipment
2026-07-07 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-07 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2024-MECH-0008123
08:30 AM - 11:00 AM: 903 - Rough
2026-07-06 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-06 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-06 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-07-06 - 2024-MECH-0008123
12:00 PM - 02:00 PM: 903 - Rough
2026-07-02 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-02 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
2026-07-02 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-01 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-01 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-01 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-01 - 2024-MECH-0008123
09:00 AM - 11:00 AM: 903 - Rough
2026-07-01 - 2025-ELEC-0006256
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-30 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-30 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-06-29 - 2025-FIRE-0003659
TBD: 302 - Partial Rough
2026-06-29 - 2026-FIRE-0002097
TBD: 302 - Partial Rough
2026-06-29 - 2024-ELEC-0010905
TBD: 302 - Partial Rough
2026-06-29 - 2025-ELEC-0013395
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-29 - 2025-ELEC-0012467
TBD: 307 - Service Equipment
2026-06-26 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-26 - 2024-MECH-0008123
12:00 PM - 02:00 PM: 903 - Rough
2026-06-26 - 2025-ELEC-0006256
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-06-26 - 2025-ELEC-0012467
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-06-25 - 2025-ELEC-0012467
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-06-24 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-06-24 - 2025-ELEC-0012467
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-06-23 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-23 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-22 - 2025-FIRE-0002211
08:00 AM - 11:00 AM: 411 - Rough
2026-06-22 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-06-22 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough