300 Union AVE
Recent Inspections
2026-09-11 - 2024-COMMCON-0000205
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-09 - 2026-FIRE-0003169
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-09 - 2026-ROOFSIDE-0004903
01:00 PM - 02:30 PM: 206 - Other
2026-09-09 - 2024-COMMCON-0000205
01:00 PM - 02:30 PM: 112 - Frame
01:00 PM - 02:30 PM: 113 - Pre Construction Meeting
2026-09-09 - 2024-ELEC-0002586
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-08 - 2024-COMMCON-0000205
01:00 PM - 03:00 PM: 112 - Frame
2026-09-02 - 2024-COMMCON-0000205
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-01 - 2024-COMMCON-0000205
08:30 AM - 09:30 AM: 107 - Drywall
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-08-31 - 2024-COMMCON-0000205
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-28 - 2024-ELEC-0002586
08:30 AM - 09:30 AM: 301 - Underground
2026-08-26 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 105 - Exterior Sheathing
2026-08-20 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-08-20 - 2024-PLUMB-0003751
12:00 PM - 03:00 PM: 401 - Rough
2026-08-17 - 2024-COMMCON-0000205
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 112 - Frame
2026-08-17 - 2024-PLUMB-0003751
10:00 AM - 12:00 PM: 400 - Groundwork
12:00 PM - 03:00 PM: 401 - Rough
2026-08-15 - 2024-COMMCON-0000205
08:30 AM - 09:30 AM: 112 - Frame
2026-08-14 - 2024-COMMCON-0000205
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2024-ELEC-0002586
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-13 - 2026-FIRE-0003169
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-13 - 2024-PLUMB-0003752
TBD: 400 - Groundwork
TBD: 401 - Rough
2026-08-13 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-08-12 - 2026-FIRE-0003169
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-12 - 2024-ELEC-0002586
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-07 - 2026-FIRE-0002696
12:00 PM - 03:00 PM: 411 - Rough
2026-08-01 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-07-31 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-07-30 - 2024-COMMCON-0000205
TBD: 112 - Frame
2026-07-17 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-07-16 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-07-07 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 112 - Frame
2026-07-07 - 2024-MECH-0002184
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-07-07 - 2024-MECH-0002185
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-06-24 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 103 - Waterproofing
2026-06-23 - 2024-COMMCON-0000205
12:00 PM - 02:00 PM: 103 - Waterproofing
822 N Dahlia ST
Recent Inspections
2026-09-11 - 2023-RESCON-0004120
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-03 - 2023-RESCON-0004120
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-07-31 - 2025-ROOFSIDE-0009822
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-07-20 - 2025-ROOFSIDE-0009822
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-07-17 - 2026-MECH-0000222
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-16 - 2026-MECH-0000222
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-11 - 2023-ELEC-0005658
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-07-10 - 2023-ELEC-0005658
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-06-23 - 2023-RESCON-0004120
09:00 AM - 11:00 AM: 112 - Frame
18415 E 58th Ave
Recent Inspections
2026-09-11 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-09-10 - 2025-ELEC-0005396
07:00 AM - 01:00 PM: 301 - Underground
2026-09-09 - 2025-COMMCON-0001108
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-09-09 - 2025-ELEC-0005396
12:30 PM - 02:30 PM: 301 - Underground
2026-09-03 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-09-03 - 2025-MECH-0008484
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-03 - 2025-MECH-0008486
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-09-03 - 2025-PLUMB-0011306
08:00 AM - 10:30 AM: 401 - Rough
2026-09-02 - 2025-COMMCON-0001108
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-09-02 - 2025-PLUMB-0011306
08:00 AM - 10:30 AM: 401 - Rough
2026-09-01 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-08-31 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-08-27 - 2025-ELEC-0005396
12:30 PM - 02:30 PM: 301 - Underground
2026-08-26 - 2025-ELEC-0005396
07:00 AM - 01:00 PM: 301 - Underground
2026-08-21 - 2025-COMMCON-0001108
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-08-20 - 2025-COMMCON-0001108
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-08-20 - 2025-ELEC-0005396
12:30 PM - 02:30 PM: 301 - Underground
12:30 PM - 02:30 PM: 309 - Walls
2026-08-19 - 2025-COMMCON-0001108
01:01 PM - 03:00 PM: 106 - Batt Insulation
TBD: Document Review Inspection
2026-08-18 - 2025-ELEC-0005396
12:30 PM - 02:30 PM: 301 - Underground
2026-08-17 - 2026-ROOFSIDE-0004691
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-08-17 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-08-13 - 2025-ELEC-0005396
08:30 AM - 09:30 AM: 301 - Underground
08:30 AM - 09:30 AM: 309 - Walls
2026-08-12 - 2025-ELEC-0005396
10:00 AM - 12:00 PM: 309 - Walls
2026-08-12 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-COMMCON-0001108
01:00 PM - 03:00 PM: 112 - Frame
2026-08-04 - 2026-PLUMB-0005896
12:15 PM - 03:00 PM: 402 - Final - Plumbing
2026-07-31 - 2026-PLUMB-0005896
08:00 AM - 10:30 AM: 401 - Rough
2026-07-27 - 2025-COMMCON-0001108
10:00 AM - 12:15 PM: 113 - Pre Construction Meeting
2026-07-24 - 2025-COMMCON-0001108
08:30 AM - 09:30 AM: 109 - Other
2026-07-22 - 2025-COMMCON-0001108
08:00 AM - 12:00 PM: 105 - Exterior Sheathing
2026-07-21 - 2025-ELEC-0005396
10:00 AM - 12:00 PM: 301 - Underground
2026-07-14 - 2025-ELEC-0005396
08:30 AM - 09:30 AM: 301 - Underground
2026-07-02 - 2025-ELEC-0005396
12:30 PM - 02:30 PM: 301 - Underground
2026-07-01 - 2025-ELEC-0005396
08:00 AM - 10:00 AM: 300 - Slab
2026-06-25 - 2025-ELEC-0005396
12:00 PM - 02:30 PM: 300 - Slab
3160 E 2nd AVE
Recent Inspections
2026-09-11 - 2025-ELEC-0011689
08:00 AM - 10:00 AM: 300 - Slab
2026-09-01 - 2025-ELEC-0011689
08:30 AM - 09:30 AM: 300 - Slab
2026-08-31 - 2025-PLUMB-0009666
09:00 AM - 11:00 AM: 401 - Rough
2026-08-17 - 2025-ELEC-0011689
09:00 AM - 11:00 PM: 300 - Slab
2026-08-07 - 2025-ELEC-0011689
12:00 PM - 02:00 PM: 300 - Slab
2026-07-29 - 2025-ELEC-0011689
09:00 AM - 11:00 AM: 300 - Slab
2026-07-28 - 2025-ELEC-0011689
08:00 AM - 10:00 AM: 300 - Slab
2026-07-21 - 2025-ELEC-0011689
08:00 AM - 10:00 AM: 300 - Slab
2026-07-17 - 2025-PLUMB-0009666
11:00 AM - 01:00 PM: 400 - Groundwork
2026-07-14 - 2025-PLUMB-0009666
09:00 AM - 11:00 AM: 400 - Groundwork
2026-07-10 - 2025-PLUMB-0009666
09:00 AM - 11:00 AM: 400 - Groundwork
2026-07-08 - 2025-ELEC-0011689
08:00 AM - 10:00 AM: 300 - Slab
2026-07-08 - 2026-ELEC-0002078
TBD: 305 - Final - Electrical
2026-06-26 - 2025-ELEC-0011689
08:00 AM - 10:00 AM: 301 - Underground
2026-06-26 - 2025-PLUMB-0009666
08:00 AM - 10:00 AM: 400 - Groundwork
2026-06-23 - 2025-ELEC-0011689
09:00 AM - 11:00 AM: 301 - Underground
817 W 8th
Recent Inspections
2026-09-11 - 2025-ELEC-0013894
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-09-10 - 2026-MECH-0001019
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-10 - 2025-ELEC-0013894
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-09-08 - 2025-COMMCON-0002332
01:00 PM - 03:00 PM: 500 - Rough
TBD: 109 - Other
2026-09-04 - 2026-MECH-0001019
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-03 - 2025-COMMCON-0002332
09:30 AM - 11:00 AM: 107 - Drywall
2026-09-03 - 2025-ELEC-0013894
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-02 - 2026-MECH-0001019
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-20 - 2025-COMMCON-0002332
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 112 - Frame
2026-08-18 - 2025-ELEC-0013894
12:00 PM - 02:00 PM: 313 - Meter Release
2026-08-06 - 2025-COMMCON-0002332
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-03 - 2025-COMMCON-0002332
09:30 AM - 11:00 AM: 107 - Drywall
2026-07-30 - 2025-COMMCON-0002332
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-07-29 - 2026-PLUMB-0001322
09:00 AM - 11:00 AM: 401 - Rough
2026-07-28 - 2025-COMMCON-0002332
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-25 - 2025-ELEC-0013894
09:00 AM - 11:00 AM: 309 - Walls
2026-07-24 - 2025-COMMCON-0002332
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-24 - 2025-ELEC-0013894
09:00 AM - 11:00 AM: 309 - Walls
2026-07-17 - 2025-COMMCON-0002332
09:30 AM - 11:00 AM: 109 - Other
2026-07-16 - 2026-PLUMB-0001322
TBD: 401 - Rough
2026-07-15 - 2026-PLUMB-0001322
TBD: 401 - Rough
2026-07-10 - 2025-ELEC-0013894
10:00 AM - 12:00 PM: 309 - Walls
2026-07-09 - 2025-ELEC-0013894
08:30 AM - 09:30 AM: 309 - Walls
2026-07-07 - 2025-COMMCON-0002332
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-06 - 2025-ELEC-0013894
09:00 AM - 11:00 AM: 309 - Walls
2026-06-30 - 2025-COMMCON-0002332
09:30 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-06-30 - 2025-ELEC-0013894
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
3320 W 25th AVE
Recent Inspections
2026-09-11 - 2024-RESCON-0002978
12:00 PM - 02:00 PM: 116 - Building Slab
2026-09-09 - 2024-RESCON-0002978
08:30 AM - 05:30 PM: 116 - Building Slab
2026-09-04 - 2026-PLUMB-0007250
11:00 AM - 01:00 PM: 400 - Groundwork
2026-09-03 - 2026-PLUMB-0007221
10:00 AM - 12:30 PM: 402 - Final - Plumbing
2026-08-31 - 2024-RESCON-0002978
TBD: Document Review
2026-08-18 - 2024-RESCON-0002978
TBD: Document Review
2026-07-22 - 2024-RESCON-0002978
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
10:00 AM - 12:00 PM: Document Review
2026-07-20 - 2024-RESCON-0002975
11:01 AM - 01:00 PM: 108 - Final - Residential
2026-07-17 - 2024-RESCON-0002975
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 109 - Other
2026-06-22 - 2024-RESCON-0002975
TBD: 113 - Pre Construction Meeting
2150 E 49th Ave
Recent Inspections
2026-09-11 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-11 - 2025-PLUMB-0003580
12:00 PM - 03:00 PM: 401 - Rough
2026-09-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-09 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 903 - Rough
2026-09-09 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-09-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-09-03 - 2025-FIRE-0006529
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-09-03 - 2025-ELEC-0003540
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-09-02 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 112 - Frame
2026-09-02 - 2026-FIRE-0002250
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-02 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-02 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2026-FIRE-0002250
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-28 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-28 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-28 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-08-27 - 2025-MECH-0002214
09:00 AM - 11:00 AM: 903 - Rough
2026-08-26 - 2025-FIRE-0006529
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-26 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-26 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 903 - Rough
2026-08-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-20 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-20 - 2025-ELEC-0003540
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-20 - 2025-FIRE-0006529
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-08-13 - 2025-FIRE-0006529
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-13 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-08-13 - 2025-ELEC-0003540
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-13 - 2025-MECH-0002214
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-FIRE-0006529
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-05 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-28 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-07-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-20 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-17 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-07-16 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-14 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-13 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-07-13 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-08 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-08 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 313 - Meter Release
2026-07-07 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-02 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 307 - Service Equipment
10:00 AM - 12:30 PM: 313 - Meter Release
2026-07-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-29 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-26 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 303 - Full Rough
2026-06-25 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-24 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-23 - 2025-MECH-0002214
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-06-22 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-22 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
5601 N Chester WAY
Recent Inspections
2026-09-11 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-10 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-09-08 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-09-04 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-03 - 2026-FIRE-0001884
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-03 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-03 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-03 - 2025-MECH-0004130
11:00 AM - 01:00 PM: 903 - Rough
2026-09-03 - 2025-PLUMB-0006031
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-09-02 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-02 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-09-01 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-31 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-28 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-27 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-27 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-08-26 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-21 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-21 - 2025-PLUMB-0006031
08:30 AM - 10:30 AM: 402 - Final - Plumbing
2026-08-21 - 2025-MECH-0004119
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-08-20 - 2025-COMMCON-0001092
09:30 AM - 11:30 AM: 107 - Drywall
2026-08-20 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-19 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-19 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-18 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-18 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-08-17 - 2025-COMMCON-0001092
09:30 AM - 11:30 AM: 112 - Frame
2026-08-17 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 304 - Partial Final
2026-08-14 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
2026-08-13 - 2025-COMMCON-0001092
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0005360
08:30 AM - 09:30 AM: 304 - Partial Final
2026-08-12 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-11 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-11 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 304 - Partial Final
2026-08-10 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-10 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 304 - Partial Final
2026-08-07 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-08-04 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-04 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-08-03 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-31 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-30 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-07-30 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-07-29 - 2025-FIRE-0007400
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-29 - 2026-FIRE-0002300
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-29 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-07-29 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-28 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-07-28 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-27 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-24 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-23 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-22 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-21 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-21 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-07-20 - 2025-COMMCON-0001092
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-17 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-17 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-17 - 2026-ELEC-0000568
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-16 - 2025-COMMCON-0001092
02:00 PM - 03:00 PM: 106 - Batt Insulation
02:00 PM - 03:00 PM: 107 - Drywall
2026-07-13 - 2026-FIRE-0002300
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-13 - 2026-ELEC-0000568
08:30 AM - 10:30 AM: 303 - Full Rough
TBD: 300 - Slab
TBD: 309 - Walls
2026-07-08 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-07 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-06 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-02 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-01 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-06-29 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
2026-06-27 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-26 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-25 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-25 - 2025-COMMCON-0002658
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-06-24 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-23 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-23 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 301 - Underground
2026-06-23 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-06-22 - 2025-FIRE-0007400
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0000411
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-22 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 302 - Partial Rough
4801 W 10th AVE
Recent Inspections
2026-09-11 - 2026-PLUMB-0007061
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-09-10 - 2026-PLUMB-0007061
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-08 - 2023-PLUMB-0004475
11:00 AM - 01:00 PM: 400 - Groundwork
2026-09-04 - 2023-PLUMB-0004475
01:00 PM - 03:00 PM: 400 - Groundwork
2026-08-12 - 2023-ELEC-0006189
08:30 AM - 09:30 AM: 301 - Underground
2026-08-11 - 2023-ELEC-0006189
08:30 AM - 09:30 AM: 301 - Underground
1483 N Detroit ST
Recent Inspections
2026-09-11 - 2026-COMMCON-0000077
08:45 AM - 11:00 AM: 108 - Final - Commercial
2026-09-10 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 109 - Other
2026-09-02 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 109 - Other
10:00 AM - 12:00 PM: Document Review Inspection
2026-09-01 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 109 - Other
2026-08-31 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 109 - Other
2026-08-27 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-08-26 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 108 - Final - Commercial
11:00 AM - 01:00 PM: 109 - Other
2026-08-20 - 2026-COMMCON-0000077
01:00 PM - 03:00 PM: 121 - Certificate of Occupancy
2026-08-14 - 2026-COMMCON-0000077
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-08-13 - 2026-COMMCON-0000077
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
2026-08-13 - 2026-MECH-0000330
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-08-12 - 2026-PLUMB-0000560
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-11 - 2026-MECH-0000330
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-08-10 - 2026-ELEC-0004785
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-08-07 - 2026-ELEC-0004785
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-08-04 - 2026-PLUMB-0000560
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-03 - 2026-ELEC-0004785
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-07-31 - 2026-ELEC-0004785
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-07-30 - 2026-ELEC-0004785
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-07-23 - 2026-ELEC-0004785
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-23 - 2026-ELEC-0000692
TBD: 305 - Final - Electrical
2026-07-21 - 2026-MECH-0000330
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-17 - 2026-ELEC-0000692
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-17 - 2026-MECH-0000330
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-07-16 - 2026-ELEC-0004785
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-16 - 2026-ELEC-0000692
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-15 - 2026-COMMCON-0000077
12:30 PM - 02:30 PM: 109 - Other
2026-07-09 - 2026-COMMCON-0000077
10:30 AM - 12:30 PM: 112 - Frame
2026-06-24 - 2026-ELEC-0004785
TBD: 307 - Service Equipment
TBD: 313 - Meter Release
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-23 - 2026-ELEC-0004785
10:00 AM - 12:00 PM: 305 - Final - Electrical
TBD: 307 - Service Equipment
TBD: 313 - Meter Release
2026-06-22 - 2026-ELEC-0004785
08:30 AM - 09:30 AM: 307 - Service Equipment