4510 W 8th Ave
Recent Inspections
2026-10-27 - 2026-MECH-0006738
10:00 AM - 12:00 PM: 903 - Rough
2026-10-15 - 2026-RESCON-0000210
08:30 AM - 05:30 PM: 105 - Exterior Sheathing
2026-10-14 - 2026-RESCON-0000210
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-10-13 - 2026-RESCON-0000210
TBD: Document Review
2026-10-06 - 2026-RESCON-0000210
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-08-28 - 2026-PLUMB-0006959
01:00 PM - 03:00 PM: 402 - Final - Plumbing
01:00 PM - 03:00 PM: 404 - Water Service
2026-07-23 - 2026-RESCON-0000210
10:30 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-07-22 - 2026-RESCON-0000210
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2815 S Williams St
Recent Inspections
2026-10-27 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 112 - Frame
2026-10-20 - 2026-PLUMB-0007034
12:00 PM - 03:00 PM: 401 - Rough
2026-10-06 - 2026-MECH-0006360
11:00 AM - 01:00 PM: 903 - Rough
2026-09-30 - 2026-ELEC-0009213
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-04 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-03 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-08-17 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-12 - 2026-RESCON-0001731
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-08-11 - 2026-RESCON-0001731
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-07-29 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-22 - 2026-RESCON-0001731
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2090 N Bellaire ST
Recent Inspections
2026-10-26 - 2026-RESCON-0001670
10:00 AM - 12:00 PM: 104 - Frost Wall Insulation
2026-10-22 - 2026-PLUMB-0008384
12:30 PM - 03:00 PM: 400 - Groundwork
2026-10-22 - 2026-PLUMB-0008385
12:30 PM - 03:00 PM: 400 - Groundwork
2026-10-02 - 2026-RESCON-0001669
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-10-02 - 2026-RESCON-0001670
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-09-29 - 2026-RESCON-0001668
10:00 AM - 01:00 PM: 108 - Final - Residential
2026-09-28 - 2026-RESCON-0001668
09:00 AM - 11:00 AM: 109 - Other
2026-09-22 - 2026-RESCON-0001668
TBD: Document Review
10:00 AM - 12:00 PM: 109 - Other
2026-09-09 - 2026-RESCON-0001668
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-09-04 - 2026-DEMO-0000364
10:00 AM - 12:00 PM: Demolition Final Inspection
2026-08-20 - 2026-ELEC-0007652
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-21 - 2026-RESCON-0001668
10:00 AM - 01:00 PM: 113 - Pre Construction Meeting
4500 S Monaco ST
Recent Inspections
2026-10-26 - 2025-FIRE-0007687
08:30 AM - 10:30 AM: 411 - Rough
2026-10-21 - 2025-FIRE-0007685
08:30 AM - 11:30 AM: 411 - Rough
2026-10-16 - 2025-FIRE-0007685
08:30 AM - 11:30 AM: 411 - Rough
2026-10-13 - 2025-FIRE-0007681
08:30 AM - 11:30 AM: 411 - Rough
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-13 - 2025-FIRE-0007682
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-06 - 2025-FIRE-0007681
08:30 AM - 11:30 AM: 411 - Rough
2026-10-05 - 2025-FIRE-0007678
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-05 - 2025-FIRE-0007680
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-01 - 2025-FIRE-0007677
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-01 - 2025-FIRE-0007678
08:30 AM - 11:30 AM: 411 - Rough
2026-10-01 - 2025-FIRE-0007679
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-29 - 2025-FIRE-0007677
08:30 AM - 11:30 AM: 411 - Rough
2026-09-29 - 2025-FIRE-0007678
08:30 AM - 11:30 AM: 411 - Rough
2026-09-23 - 2025-FIRE-0007677
08:30 AM - 11:30 AM: 411 - Rough
2026-09-23 - 2025-FIRE-0007678
08:30 AM - 11:30 AM: 411 - Rough
2026-09-16 - 2025-FIRE-0007669
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-16 - 2025-FIRE-0007670
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-11 - 2025-FIRE-0007669
08:30 AM - 11:30 AM: 411 - Rough
2026-09-11 - 2025-FIRE-0007677
08:30 AM - 11:30 AM: 411 - Rough
2026-09-09 - 2025-FIRE-0007664
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-09 - 2025-FIRE-0007666
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-08 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-04 - 2025-FIRE-0007663
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-02 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 411 - Rough
2026-09-02 - 2025-FIRE-0007669
08:30 AM - 11:30 AM: 411 - Rough
2026-08-28 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 411 - Rough
2026-08-28 - 2025-FIRE-0007669
08:30 AM - 11:30 AM: 411 - Rough
2026-08-18 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 411 - Rough
2026-08-17 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 411 - Rough
2026-08-13 - 2025-FIRE-0007663
08:30 AM - 05:30 PM: 411 - Rough
2026-08-11 - 2025-FIRE-0007663
08:30 AM - 11:30 AM: 411 - Rough
2026-08-11 - 2025-FIRE-0007665
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-08-07 - 2025-FIRE-0007665
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-07-29 - 2025-FIRE-0007665
09:30 AM - 12:30 PM: 411 - Rough
2026-07-22 - 2025-FIRE-0007665
08:30 AM - 11:30 AM: 411 - Rough
2026-07-21 - 2025-FIRE-0007665
08:30 AM - 11:30 AM: 411 - Rough
2026-07-20 - 2025-FIRE-0007665
08:30 AM - 11:30 AM: 411 - Rough
2026-07-17 - 2025-FIRE-0007665
10:00 AM - 12:00 PM: 411 - Rough
4515 W 2nd AVE
Recent Inspections
2026-10-26 - 2026-RESCON-0002847
10:00 AM - 12:00 PM: 112 - Frame
2026-09-21 - 2026-RESCON-0002847
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-09-16 - 2026-RESCON-0002847
TBD: 113 - Pre Construction Meeting
2026-09-02 - 2026-PLUMB-0007046
11:00 AM - 01:00 PM: 401 - Rough
2026-08-18 - 2026-RESCON-0002470
TBD: 113 - Pre Construction Meeting
2026-07-15 - 2026-ELEC-0005883
09:00 AM - 11:00 AM: 305 - Final - Electrical
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
1347 W 9th AVE
Recent Inspections
2026-10-27 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-23 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-22 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-21 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-20 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-19 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-16 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-15 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-13 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-09 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-08 - 2024-COMMCON-0001716
09:29 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-07 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-06 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-05 - 2024-COMMCON-0001716
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-02 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-10-01 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-30 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-29 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-09-28 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-25 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-24 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-23 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-22 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-21 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-18 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-09-17 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
09:30 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-16 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
2026-09-15 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-10 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-09 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-09-04 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-09-02 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
09:00 AM - 11:00 AM: 112 - Frame
2026-09-01 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-08-28 - 2025-ELEC-0012467
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-27 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-08-26 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-08-21 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-08-20 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-08-19 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-08-18 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
2026-08-14 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-08-13 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
2026-08-12 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 108 - Final - Commercial
09:00 AM - 11:00 AM: 112 - Frame
2026-08-11 - 2024-COMMCON-0001716
10:30 AM - 12:00 PM: 112 - Frame
2026-08-10 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-08-06 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 108 - Final - Commercial
10:00 AM - 12:00 PM: 112 - Frame
2026-08-05 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-04 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 108 - Final - Commercial
10:00 AM - 12:00 PM: 112 - Frame
2026-07-15 - 2025-ELEC-0012467
12:00 PM - 02:00 PM: 313 - Meter Release
3022 S Josephine ST
Recent Inspections
2026-10-26 - 2026-RESCON-0001474
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-10-23 - 2026-RESCON-0001474
11:00 AM - 01:00 PM: 112 - Frame
2026-10-20 - 2026-RESCON-0001474
11:00 AM - 01:00 PM: 112 - Frame
2026-10-19 - 2026-PLUMB-0005571
08:30 AM - 11:30 AM: 401 - Rough
2026-10-15 - 2026-ELEC-0006313
12:00 PM - 02:00 PM: 303 - Full Rough
2026-10-15 - 2026-MECH-0004258
11:00 AM - 01:00 PM: 903 - Rough
2026-09-30 - 2026-RESCON-0001474
01:00 PM - 03:00 PM: 116 - Building Slab
2026-09-28 - 2026-RESCON-0001474
11:00 AM - 01:00 PM: 116 - Building Slab
2026-09-24 - 2026-RESCON-0001474
01:00 PM - 03:00 PM: 116 - Building Slab
2026-09-22 - 2026-RESCON-0001474
01:00 PM - 03:00 PM: 102 - Foundation Perimeter Drain
2026-09-21 - 2026-RESCON-0001474
01:00 PM - 03:00 PM: 102 - Foundation Perimeter Drain
2026-08-21 - 2026-MECH-0004258
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-21 - 2026-PLUMB-0005571
08:30 AM - 11:30 AM: 400 - Groundwork
2026-08-18 - 2026-PLUMB-0005571
08:30 AM - 11:30 AM: 400 - Groundwork
2026-07-14 - 2026-RESCON-0001474
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
1827 S Elm ST
Recent Inspections
2026-10-27 - 2026-PLUMB-0008647
08:30 AM - 11:30 AM: 401 - Rough
2026-10-16 - 2026-MECH-0006762
08:30 AM - 11:00 AM: 903 - Rough
2026-10-15 - 2026-RESCON-0001662
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-10-14 - 2026-RESCON-0001662
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-07-24 - 2026-ELEC-0006469
10:00 AM - 12:00 PM: 311 - Temporary Service
10:00 AM - 12:00 PM: 313 - Meter Release
2026-07-16 - 2026-ELEC-0006469
08:00 AM - 10:00 AM: 311 - Temporary Service
2026-07-10 - 2026-RESCON-0001662
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
1246 N Clermont ST
Recent Inspections
2026-10-27 - 2026-MECH-0004533
10:00 AM - 12:00 PM: 903 - Rough
2026-07-30 - 2026-ELEC-0006261
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-28 - 2026-ELEC-0006261
08:00 AM - 10:00 AM: 301 - Underground
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-10 - 2026-RESCON-0001789
10:00 AM - 01:00 PM: 113 - Pre Construction Meeting