459 N Decatur
Recent Inspections
2026-06-12 - 2025-RESCON-0001108
10:00 AM - 12:00 PM: 112 - Frame
2026-03-27 - 2025-RESCON-0001108
12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain
2026-03-23 - 2025-RESCON-0001108
01:00 PM - 03:00 PM: Document Review
2026-03-13 - 2025-RESCON-0001108
TBD: Document Review
457 N Decatur
Recent Inspections
2026-06-12 - 2025-RESCON-0001106
10:00 AM - 12:00 PM: 112 - Frame
2026-03-27 - 2025-RESCON-0001106
12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain
12:30 PM - 02:30 PM: 103 - Waterproofing
2026-03-23 - 2025-RESCON-0001106
01:00 PM - 03:00 PM: Document Review
2026-03-13 - 2025-RESCON-0001106
TBD: Document Review
455 N Decatur
Recent Inspections
2026-06-12 - 2025-RESCON-0000052
09:00 AM - 11:00 AM: 112 - Frame
2026-03-27 - 2025-RESCON-0000052
12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain
12:30 PM - 02:30 PM: 103 - Waterproofing
2026-03-24 - 2025-RESCON-0000052
08:30 AM - 05:30 PM: 113 - Pre Construction Meeting
2026-03-23 - 2025-RESCON-0000052
12:00 PM - 02:00 PM: Document Review
2026-03-18 - 2025-RESCON-0000052
10:00 AM - 12:00 PM: Document Review
2026-03-13 - 2025-RESCON-0000052
TBD: Document Review
660 S Dale CT
Recent Inspections
2026-06-12 - 2024-RESCON-0002004
11:00 AM - 01:00 PM: 101 - Foundation Wall
2026-04-15 - 2024-RESCON-0002004
09:00 AM - 11:01 AM: 100 - Footing
2026-04-15 - 2026-ELEC-0002682
11:00 AM - 01:00 PM: 312 - UFER
2026-03-13 - 2024-RESCON-0002004
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
4790 W Evans AVE
Recent Inspections
2026-06-12 - 2026-RESCON-0000528
10:30 AM - 12:30 PM: 106 - Batt Insulation
2026-06-03 - 2026-RESCON-0000528
01:00 PM - 03:00 PM: 112 - Frame
2026-05-14 - 2026-RESCON-0000528
01:00 PM - 03:00 PM: 112 - Frame
2026-04-27 - 2026-RESCON-0000528
10:30 AM - 12:30 PM: 113 - Pre Construction Meeting
2026-04-21 - 2025-ELEC-0012348
10:00 AM - 12:00 PM: 303 - Full Rough
2026-04-16 - 2025-ELEC-0012348
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 307 - Service Equipment
01:00 PM - 03:00 PM: 313 - Meter Release
2026-04-15 - 2025-ELEC-0012348
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 307 - Service Equipment
01:00 PM - 03:00 PM: 313 - Meter Release
2026-04-03 - 2026-PLUMB-0001860
11:00 AM - 03:00 PM: 401 - Rough
11:00 AM - 03:00 PM: 403 - Pressure Test
2026-03-20 - 2025-ELEC-0012348
10:00 AM - 12:00 PM: 301 - Underground
2026-03-19 - 2025-ELEC-0012348
12:30 PM - 02:30 PM: 301 - Underground
2026-03-18 - 2026-PLUMB-0001860
10:00 AM - 12:00 PM: 400 - Groundwork
2026-03-16 - 2026-PLUMB-0001860
11:00 AM - 03:00 PM: 400 - Groundwork
2026-03-12 - 2026-MECH-0001452
01:00 PM - 03:00 PM: 903 - Rough
2662 S Acoma
Recent Inspections
2026-06-12 - 2025-RESCON-0000470
01:00 PM - 03:00 PM: 108 - Final - Residential
01:00 PM - 03:00 PM: 121 - Certificate of Occupancy
2026-04-24 - 2025-RESCON-0000470
11:00 AM - 01:00 PM: Document Review
2026-04-23 - 2025-RESCON-0000470
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 108 - Final - Residential
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-27 - 2025-RESCON-0000470
01:00 PM - 03:00 PM: 108 - Final - Residential
01:00 PM - 03:00 PM: 121 - Certificate of Occupancy
2026-03-26 - 2025-RESCON-0000470
01:00 PM - 03:00 PM: Document Review
2026-03-17 - 2025-RESCON-0000470
08:30 AM - 10:30 AM: 109 - Other
2026-03-10 - 2025-MECH-0007376
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-03-10 - 2025-RESCON-0000470
01:00 PM - 03:00 PM: 109 - Other
8995 E Cornell AVE
Recent Inspections
2026-06-12 - 2026-MECH-0001505
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-06-11 - 2026-ELEC-0002001
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-06-11 - 2026-MECH-0001505
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-06-01 - 2026-ELEC-0002001
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-05-28 - 2026-ELEC-0002001
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-05-22 - 2026-PLUMB-0002729
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-01 - 2026-RESCON-0000632
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-22 - 2026-RESCON-0000632
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-20 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-04-16 - 2026-RESCON-0000632
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-15 - 2026-RESCON-0000632
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-13 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 112 - Frame
2026-04-10 - 2026-RESCON-0000632
09:00 AM - 11:00 AM: 112 - Frame
2026-04-09 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 112 - Frame
2026-04-08 - 2026-RESCON-0000632
09:00 AM - 11:00 AM: 112 - Frame
2026-04-07 - 2026-RESCON-0000632
09:00 AM - 11:00 AM: 112 - Frame
2026-04-06 - 2026-ELEC-0002001
10:00 AM - 12:00 PM: 303 - Full Rough
2026-04-03 - 2026-MECH-0001505
11:00 AM - 01:00 PM: 903 - Rough
2026-04-02 - 2026-ELEC-0002001
01:00 PM - 03:00 PM: 303 - Full Rough
2026-03-31 - 2026-PLUMB-0002729
08:30 AM - 11:30 AM: 401 - Rough
2026-03-20 - 2026-MECH-0001505
01:00 PM - 03:00 PM: 903 - Rough
2026-03-12 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-03-11 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-03-10 - 2026-RESCON-0000632
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
4821 W 10th AVE
Recent Inspections
2026-06-12 - 2024-RESCON-0000200
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-03-31 - 2024-RESCON-0000200
08:00 AM - 10:00 AM: 120 - Temporary Certificate of Occupancy
2026-03-27 - 2024-RESCON-0000200
08:00 AM - 10:00 AM: 120 - Temporary Certificate of Occupancy
2026-03-25 - 2024-RESCON-0000200
01:00 PM - 03:00 PM: 109 - Other
2026-03-24 - 2024-RESCON-0000200
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-03-11 - 2025-PLUMB-0003344
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-03-10 - 2025-PLUMB-0003344
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2150 E 49th Ave
Recent Inspections
2026-06-12 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-12 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-12 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-11 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-11 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 403 - Pressure Test
10:00 AM - 12:00 PM: 405 - Meter Release
2026-06-10 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-09 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-09 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-09 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-09 - 2025-PLUMB-0003580
12:00 PM - 03:00 PM: 401 - Rough
2026-06-08 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-06-05 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-04 - 2026-ROOFSIDE-0001812
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-06-04 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-02 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-02 - 2025-PLUMB-0003580
10:00 AM - 12:00 PM: 401 - Rough
2026-06-01 - 2025-FIRE-0006118
08:30 AM - 10:30 AM: 411 - Rough
2026-06-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-01 - 2025-MECH-0008603
08:30 AM - 11:00 AM: 902 - Partial Rough
2026-05-29 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-29 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-05-29 - 2025-MECH-0002222
01:00 PM - 03:00 PM: 903 - Rough
2026-05-28 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-05-28 - 2025-MECH-0008603
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-05-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-27 - 2025-PLUMB-0003580
08:00 AM - 12:00 PM: 401 - Rough
2026-05-26 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-05-22 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-21 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-05-21 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-05-20 - 2025-FIRE-0006529
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-20 - 2025-COMMCON-0000407
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-20 - 2025-ELEC-0003540
TBD: 302 - Partial Rough
2026-05-20 - 2025-MECH-0008603
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-05-19 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-18 - 2025-FIRE-0006118
09:00 AM - 11:00 AM: 411 - Rough
2026-05-18 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-16 - 2025-COMMCON-0000407
TBD: 107 - Drywall
TBD: 112 - Frame
2026-05-15 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
TBD: 107 - Drywall
TBD: 112 - Frame
2026-05-15 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 307 - Service Equipment
2026-05-14 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-05-12 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-05-12 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-05-12 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-05-11 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-11 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-11 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-08 - 2025-COMMCON-0000407
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 112 - Frame
2026-05-07 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-05-05 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-05-04 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-04 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-05-04 - 2025-PLUMB-0003580
12:00 PM - 03:00 PM: 401 - Rough
2026-05-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-29 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-04-29 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-28 - 2025-FIRE-0006529
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-04-28 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-28 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-04-27 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-27 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-24 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-24 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-24 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-23 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-23 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-23 - 2025-PLUMB-0003580
10:00 AM - 12:00 PM: 401 - Rough
2026-04-22 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-04-22 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
TBD: 107 - Drywall
2026-04-22 - 2025-PLUMB-0003580
10:00 AM - 12:00 PM: 401 - Rough
2026-04-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-21 - 2025-MECH-0002214
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-04-21 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-04-17 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-04-17 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-04-17 - 2025-PLUMB-0003580
10:00 AM - 12:00 PM: 401 - Rough
2026-04-16 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-16 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-04-16 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-15 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-15 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-15 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-14 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-14 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 111 - Exterior Lath
01:00 PM - 03:00 PM: 112 - Frame
2026-04-14 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-13 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 112 - Frame
2026-04-13 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-13 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-10 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-10 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-04-10 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-10 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-04-09 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-04-09 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-04-09 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-09 - 2025-MECH-0008603
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-04-09 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-04-08 - 2025-FIRE-0006118
10:00 AM - 12:00 PM: 411 - Rough
2026-04-08 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-08 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-08 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-07 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-07 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-04-07 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-04-06 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-04-06 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-03 - 2025-MECH-0002214
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-04-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-02 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-04-02 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-02 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-04-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-01 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-03-31 - 2025-FIRE-0006118
08:00 AM - 11:00 AM: 411 - Rough
2026-03-31 - 2025-PLUMB-0003580
08:00 AM - 11:00 AM: 401 - Rough
2026-03-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-03-26 - 2025-FIRE-0006118
08:15 AM - 10:15 AM: 411 - Rough
2026-03-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-03-26 - 2025-PLUMB-0003580
08:15 AM - 10:15 AM: 401 - Rough
2026-03-25 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-03-24 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-03-24 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-03-20 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-03-20 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 400 - Groundwork
2026-03-19 - 2025-FIRE-0006118
10:00 AM - 12:00 PM: 411 - Rough
2026-03-19 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-03-16 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-16 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-03-12 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-03-11 - 2025-MECH-0008603
01:00 PM - 03:00 PM: 903 - Rough
2026-03-11 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-03-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-03-09 - 2025-COMMCON-0002660
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
5601 N Chester WAY
Recent Inspections
2026-06-12 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-11 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-08 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-06-04 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-06-04 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-06-02 - 2026-FIRE-0001884
10:30 AM - 12:30 PM: 411 - Rough
2026-06-02 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-01 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-29 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-29 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-29 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-05-27 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-26 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 301 - Underground
2026-05-22 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 109 - Other
2026-05-22 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-05-20 - 2025-FIRE-0007400
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-20 - 2026-FIRE-0000411
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-20 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-20 - 2025-MECH-0004119
08:30 AM - 09:30 AM: 903 - Rough
2026-05-19 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-15 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-15 - 2025-MECH-0004119
08:30 AM - 11:00 AM: 903 - Rough
2026-05-14 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-14 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 313 - Meter Release
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 308 - Ceiling
2026-05-13 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-05-12 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-05-08 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-05-07 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-07 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-07 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-05-06 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 112 - Frame
2026-05-06 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-05 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-01 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-05-01 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-04-30 - 2026-FIRE-0000643
10:00 AM - 12:00 PM: 411 - Rough
2026-04-30 - 2025-MECH-0004119
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-29 - 2026-FIRE-0000643
09:00 AM - 11:00 AM: 411 - Rough
2026-04-29 - 2025-COMMCON-0001092
11:00 AM - 01:30 PM: 106 - Batt Insulation
11:00 AM - 01:30 PM: 112 - Frame
2026-04-28 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-28 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-04-27 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
2026-04-24 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-24 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-04-23 - 2026-FIRE-0000643
08:30 AM - 10:30 AM: 411 - Rough
2026-04-23 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-23 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-04-22 - 2026-FIRE-0000643
10:15 AM - 12:15 PM: 411 - Rough
2026-04-22 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-04-21 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-04-20 - 2025-COMMCON-0001092
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-04-17 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-16 - 2025-FIRE-0007400
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-16 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-16 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-15 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-04-14 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-13 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-10 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-09 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-08 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-08 - 2025-COMMCON-0002129
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-08 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-04-07 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-07 - 2025-COMMCON-0002129
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-04-06 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-06 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-03 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-04-03 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-04-02 - 2025-FIRE-0007400
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-02 - 2025-COMMCON-0001092
09:00 AM - 11:00 AM: 112 - Frame
2026-04-02 - 2025-COMMCON-0002129
09:00 AM - 11:00 AM: 112 - Frame
2026-04-02 - 2025-ELEC-0005360
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-02 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-04-01 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-01 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-04-01 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-03-31 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-31 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-27 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-03-27 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-03-27 - 2025-FIRE-0007400
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-03-26 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 112 - Frame
2026-03-25 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 112 - Frame
2026-03-24 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-24 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-03-23 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-23 - 2025-COMMCON-0001092
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-03-23 - 2025-COMMCON-0002129
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-23 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-03-20 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-20 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 112 - Frame
2026-03-20 - 2025-COMMCON-0002129
11:30 AM - 01:30 PM: 112 - Frame
2026-03-20 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-20 - 2025-FIRE-0007400
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-19 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-19 - 2025-MECH-0004119
08:30 AM - 11:00 AM: 902 - Partial Rough
2026-03-18 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-18 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-18 - 2025-PLUMB-0006031
12:15 PM - 03:00 PM: 401 - Rough
2026-03-17 - 2025-PLUMB-0006031
11:15 AM - 01:15 PM: 401 - Rough
2026-03-16 - 2025-FIRE-0006076
10:30 AM - 12:30 PM: 411 - Rough
2026-03-16 - 2025-PLUMB-0006031
10:30 AM - 12:30 PM: 401 - Rough
2026-03-16 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-16 - 2025-FIRE-0007400
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-13 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-13 - 2025-FIRE-0007400
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-13 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 401 - Rough
2026-03-12 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-12 - 2025-COMMCON-0001092
10:30 AM - 11:30 AM: 106 - Batt Insulation
10:30 AM - 11:30 AM: 112 - Frame
2026-03-12 - 2025-COMMCON-0002129
10:30 AM - 11:30 AM: 106 - Batt Insulation
10:30 AM - 11:30 AM: 112 - Frame
2026-03-12 - 2025-ELEC-0005360
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-12 - 2025-FIRE-0007400
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-11 - 2025-FIRE-0006076
10:30 AM - 12:30 PM: 411 - Rough
2026-03-11 - 2025-ELEC-0005360
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-11 - 2025-FIRE-0007400
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-11 - 2026-ROOFSIDE-0000943
01:00 PM - 03:00 PM: 206 - Other
2026-03-10 - 2025-FIRE-0006076
10:15 AM - 12:15 PM: 411 - Rough
2026-03-10 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-03-10 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-10 - 2025-COMMCON-0002129
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-10 - 2026-ROOFSIDE-0000943
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-03-09 - 2025-FIRE-0007400
12:00 PM - 02:00 PM: 302 - Partial Rough