Property Status: Active

459 N Decatur

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0001108

10:00 AM - 12:00 PM: 112 - Frame

2026-03-27 - 2025-RESCON-0001108

12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain

2026-03-23 - 2025-RESCON-0001108

01:00 PM - 03:00 PM: Document Review

2026-03-13 - 2025-RESCON-0001108

TBD: Document Review

457 N Decatur

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0001106

10:00 AM - 12:00 PM: 112 - Frame

2026-03-27 - 2025-RESCON-0001106

12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain

12:30 PM - 02:30 PM: 103 - Waterproofing

2026-03-23 - 2025-RESCON-0001106

01:00 PM - 03:00 PM: Document Review

2026-03-13 - 2025-RESCON-0001106

TBD: Document Review

455 N Decatur

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0000052

09:00 AM - 11:00 AM: 112 - Frame

2026-03-27 - 2025-RESCON-0000052

12:30 PM - 02:30 PM: 102 - Foundation Perimeter Drain

12:30 PM - 02:30 PM: 103 - Waterproofing

2026-03-24 - 2025-RESCON-0000052

08:30 AM - 05:30 PM: 113 - Pre Construction Meeting

2026-03-23 - 2025-RESCON-0000052

12:00 PM - 02:00 PM: Document Review

2026-03-18 - 2025-RESCON-0000052

10:00 AM - 12:00 PM: Document Review

2026-03-13 - 2025-RESCON-0000052

TBD: Document Review

660 S Dale CT

Directions

Recent Inspections

2026-06-12 - 2024-RESCON-0002004

11:00 AM - 01:00 PM: 101 - Foundation Wall

2026-04-15 - 2024-RESCON-0002004

09:00 AM - 11:01 AM: 100 - Footing

2026-04-15 - 2026-ELEC-0002682

11:00 AM - 01:00 PM: 312 - UFER

2026-03-13 - 2024-RESCON-0002004

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

4790 W Evans AVE

Directions

Recent Inspections

2026-06-12 - 2026-RESCON-0000528

10:30 AM - 12:30 PM: 106 - Batt Insulation

2026-06-03 - 2026-RESCON-0000528

01:00 PM - 03:00 PM: 112 - Frame

2026-05-14 - 2026-RESCON-0000528

01:00 PM - 03:00 PM: 112 - Frame

2026-04-27 - 2026-RESCON-0000528

10:30 AM - 12:30 PM: 113 - Pre Construction Meeting

2026-04-21 - 2025-ELEC-0012348

10:00 AM - 12:00 PM: 303 - Full Rough

2026-04-16 - 2025-ELEC-0012348

01:00 PM - 03:00 PM: 303 - Full Rough

01:00 PM - 03:00 PM: 307 - Service Equipment

01:00 PM - 03:00 PM: 313 - Meter Release

2026-04-15 - 2025-ELEC-0012348

01:00 PM - 03:00 PM: 303 - Full Rough

01:00 PM - 03:00 PM: 307 - Service Equipment

01:00 PM - 03:00 PM: 313 - Meter Release

2026-04-03 - 2026-PLUMB-0001860

11:00 AM - 03:00 PM: 401 - Rough

11:00 AM - 03:00 PM: 403 - Pressure Test

2026-03-20 - 2025-ELEC-0012348

10:00 AM - 12:00 PM: 301 - Underground

2026-03-19 - 2025-ELEC-0012348

12:30 PM - 02:30 PM: 301 - Underground

2026-03-18 - 2026-PLUMB-0001860

10:00 AM - 12:00 PM: 400 - Groundwork

2026-03-16 - 2026-PLUMB-0001860

11:00 AM - 03:00 PM: 400 - Groundwork

2026-03-12 - 2026-MECH-0001452

01:00 PM - 03:00 PM: 903 - Rough

2662 S Acoma

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0000470

01:00 PM - 03:00 PM: 108 - Final - Residential

01:00 PM - 03:00 PM: 121 - Certificate of Occupancy

2026-04-24 - 2025-RESCON-0000470

11:00 AM - 01:00 PM: Document Review

2026-04-23 - 2025-RESCON-0000470

11:00 AM - 01:00 PM: Document Review

11:00 AM - 01:00 PM: 108 - Final - Residential

11:00 AM - 01:00 PM: 121 - Certificate of Occupancy

2026-03-27 - 2025-RESCON-0000470

01:00 PM - 03:00 PM: 108 - Final - Residential

01:00 PM - 03:00 PM: 121 - Certificate of Occupancy

2026-03-26 - 2025-RESCON-0000470

01:00 PM - 03:00 PM: Document Review

2026-03-17 - 2025-RESCON-0000470

08:30 AM - 10:30 AM: 109 - Other

2026-03-10 - 2025-MECH-0007376

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-03-10 - 2025-RESCON-0000470

01:00 PM - 03:00 PM: 109 - Other

8995 E Cornell AVE

Directions

Recent Inspections

2026-06-12 - 2026-MECH-0001505

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-06-11 - 2026-ELEC-0002001

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-06-11 - 2026-MECH-0001505

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-06-01 - 2026-ELEC-0002001

11:00 AM - 01:00 PM: 305 - Final - Electrical

2026-05-28 - 2026-ELEC-0002001

12:00 PM - 02:00 PM: 305 - Final - Electrical

2026-05-22 - 2026-PLUMB-0002729

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-01 - 2026-RESCON-0000632

11:00 AM - 01:00 PM: 107 - Drywall

2026-04-22 - 2026-RESCON-0000632

11:00 AM - 01:00 PM: 107 - Drywall

2026-04-20 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 106 - Batt Insulation

2026-04-16 - 2026-RESCON-0000632

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-04-15 - 2026-RESCON-0000632

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-04-13 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 112 - Frame

2026-04-10 - 2026-RESCON-0000632

09:00 AM - 11:00 AM: 112 - Frame

2026-04-09 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 112 - Frame

2026-04-08 - 2026-RESCON-0000632

09:00 AM - 11:00 AM: 112 - Frame

2026-04-07 - 2026-RESCON-0000632

09:00 AM - 11:00 AM: 112 - Frame

2026-04-06 - 2026-ELEC-0002001

10:00 AM - 12:00 PM: 303 - Full Rough

2026-04-03 - 2026-MECH-0001505

11:00 AM - 01:00 PM: 903 - Rough

2026-04-02 - 2026-ELEC-0002001

01:00 PM - 03:00 PM: 303 - Full Rough

2026-03-31 - 2026-PLUMB-0002729

08:30 AM - 11:30 AM: 401 - Rough

2026-03-20 - 2026-MECH-0001505

01:00 PM - 03:00 PM: 903 - Rough

2026-03-12 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

2026-03-11 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

2026-03-10 - 2026-RESCON-0000632

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

4821 W 10th AVE

Directions

Recent Inspections

2026-06-12 - 2024-RESCON-0000200

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

2026-03-31 - 2024-RESCON-0000200

08:00 AM - 10:00 AM: 120 - Temporary Certificate of Occupancy

2026-03-27 - 2024-RESCON-0000200

08:00 AM - 10:00 AM: 120 - Temporary Certificate of Occupancy

2026-03-25 - 2024-RESCON-0000200

01:00 PM - 03:00 PM: 109 - Other

2026-03-24 - 2024-RESCON-0000200

11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy

2026-03-11 - 2025-PLUMB-0003344

10:00 AM - 12:00 PM: 402 - Final - Plumbing

2026-03-10 - 2025-PLUMB-0003344

08:00 AM - 10:00 AM: 402 - Final - Plumbing

2150 E 49th Ave

Directions

Recent Inspections

2026-06-12 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-06-12 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-06-12 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-06-11 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-11 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 403 - Pressure Test

10:00 AM - 12:00 PM: 405 - Meter Release

2026-06-10 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-06-09 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-06-09 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-09 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-06-09 - 2025-PLUMB-0003580

12:00 PM - 03:00 PM: 401 - Rough

2026-06-08 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-06-05 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-06-04 - 2026-ROOFSIDE-0001812

01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof

2026-06-04 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-03 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-02 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-02 - 2025-PLUMB-0003580

10:00 AM - 12:00 PM: 401 - Rough

2026-06-01 - 2025-FIRE-0006118

08:30 AM - 10:30 AM: 411 - Rough

2026-06-01 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-01 - 2025-MECH-0008603

08:30 AM - 11:00 AM: 902 - Partial Rough

2026-05-29 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-29 - 2025-MECH-0002214

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-05-29 - 2025-MECH-0002222

01:00 PM - 03:00 PM: 903 - Rough

2026-05-28 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-05-28 - 2025-MECH-0008603

08:30 AM - 09:30 AM: 902 - Partial Rough

2026-05-27 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-27 - 2025-PLUMB-0003580

08:00 AM - 12:00 PM: 401 - Rough

2026-05-26 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-05-22 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-21 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

2026-05-21 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-05-20 - 2025-FIRE-0006529

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-05-20 - 2025-COMMCON-0000407

10:00 AM - 01:00 PM: 106 - Batt Insulation

2026-05-20 - 2025-ELEC-0003540

TBD: 302 - Partial Rough

2026-05-20 - 2025-MECH-0008603

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-05-19 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-18 - 2025-FIRE-0006118

09:00 AM - 11:00 AM: 411 - Rough

2026-05-18 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-16 - 2025-COMMCON-0000407

TBD: 107 - Drywall

TBD: 112 - Frame

2026-05-15 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 106 - Batt Insulation

TBD: 107 - Drywall

TBD: 112 - Frame

2026-05-15 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 307 - Service Equipment

2026-05-14 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-05-13 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-05-12 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-05-12 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-05-12 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-05-11 - 2025-FIRE-0006529

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-11 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-11 - 2025-ELEC-0003540

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-08 - 2025-COMMCON-0000407

09:30 AM - 11:30 AM: 106 - Batt Insulation

09:30 AM - 11:30 AM: 107 - Drywall

09:30 AM - 11:30 AM: 112 - Frame

2026-05-07 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-06 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-05-05 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-05-04 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-04 - 2025-MECH-0002214

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-05-04 - 2025-PLUMB-0003580

12:00 PM - 03:00 PM: 401 - Rough

2026-05-01 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-30 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-29 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-04-29 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-28 - 2025-FIRE-0006529

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-04-28 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-28 - 2025-ELEC-0003540

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-04-27 - 2025-FIRE-0006529

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-27 - 2025-ELEC-0003540

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-24 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-24 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-24 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-23 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-23 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-23 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-23 - 2025-PLUMB-0003580

10:00 AM - 12:00 PM: 401 - Rough

2026-04-22 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-04-22 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

TBD: 107 - Drywall

2026-04-22 - 2025-PLUMB-0003580

10:00 AM - 12:00 PM: 401 - Rough

2026-04-21 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-21 - 2025-MECH-0002214

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-04-21 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-04-17 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-04-17 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-04-17 - 2025-PLUMB-0003580

10:00 AM - 12:00 PM: 401 - Rough

2026-04-16 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-16 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 112 - Frame

2026-04-16 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-15 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-15 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-15 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-14 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-14 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 111 - Exterior Lath

01:00 PM - 03:00 PM: 112 - Frame

2026-04-14 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-13 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 112 - Frame

2026-04-13 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-13 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-10 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-10 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-04-10 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-10 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-04-09 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-04-09 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-09 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-04-09 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-09 - 2025-MECH-0008603

08:30 AM - 09:30 AM: 902 - Partial Rough

2026-04-09 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-04-08 - 2025-FIRE-0006118

10:00 AM - 12:00 PM: 411 - Rough

2026-04-08 - 2025-FIRE-0006529

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-08 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-08 - 2025-ELEC-0003540

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-07 - 2025-FIRE-0006529

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-07 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-04-07 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-04-06 - 2025-FIRE-0006529

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-06 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-04-06 - 2025-ELEC-0003540

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-03 - 2025-MECH-0002214

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-04-03 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-02 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-04-02 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-02 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-04-01 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-01 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 401 - Rough

2026-03-31 - 2025-FIRE-0006118

08:00 AM - 11:00 AM: 411 - Rough

2026-03-31 - 2025-PLUMB-0003580

08:00 AM - 11:00 AM: 401 - Rough

2026-03-27 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-03-26 - 2025-FIRE-0006118

08:15 AM - 10:15 AM: 411 - Rough

2026-03-26 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-03-26 - 2025-PLUMB-0003580

08:15 AM - 10:15 AM: 401 - Rough

2026-03-25 - 2025-COMMCON-0000407

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-03-24 - 2025-FIRE-0006118

08:00 AM - 10:00 AM: 411 - Rough

2026-03-24 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-03-20 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-03-20 - 2025-PLUMB-0003580

08:00 AM - 10:00 AM: 400 - Groundwork

2026-03-19 - 2025-FIRE-0006118

10:00 AM - 12:00 PM: 411 - Rough

2026-03-19 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-03-16 - 2025-COMMCON-0000407

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-03-16 - 2025-ELEC-0003540

10:00 AM - 12:30 PM: 302 - Partial Rough

2026-03-12 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-03-11 - 2025-MECH-0008603

01:00 PM - 03:00 PM: 903 - Rough

2026-03-11 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-03-09 - 2025-COMMCON-0000407

01:00 PM - 03:00 PM: 112 - Frame

2026-03-09 - 2025-COMMCON-0002660

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

5601 N Chester WAY

Directions

Recent Inspections

2026-06-12 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-06-11 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-08 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

12:00 PM - 02:00 PM: 200 - Blown Insulation

2026-06-04 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 200 - Blown Insulation

2026-06-04 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 903 - Rough

2026-06-02 - 2026-FIRE-0001884

10:30 AM - 12:30 PM: 411 - Rough

2026-06-02 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

2026-06-01 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-29 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-29 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-05-29 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-05-27 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-26 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 301 - Underground

2026-05-22 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 109 - Other

2026-05-22 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-05-20 - 2025-FIRE-0007400

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-20 - 2026-FIRE-0000411

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-20 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-20 - 2025-MECH-0004119

08:30 AM - 09:30 AM: 903 - Rough

2026-05-19 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-05-15 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-05-15 - 2025-MECH-0004119

08:30 AM - 11:00 AM: 903 - Rough

2026-05-14 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-14 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 302 - Partial Rough

08:00 AM - 10:00 AM: 313 - Meter Release

08:00 AM - 10:00 AM: 307 - Service Equipment

08:00 AM - 10:00 AM: 308 - Ceiling

2026-05-13 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

2026-05-12 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-05-08 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-05-07 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-05-07 - 2025-ELEC-0005360

12:00 PM - 02:30 PM: 302 - Partial Rough

2026-05-07 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-05-06 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 112 - Frame

2026-05-06 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-05-05 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-01 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-05-01 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-04-30 - 2026-FIRE-0000643

10:00 AM - 12:00 PM: 411 - Rough

2026-04-30 - 2025-MECH-0004119

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-04-29 - 2026-FIRE-0000643

09:00 AM - 11:00 AM: 411 - Rough

2026-04-29 - 2025-COMMCON-0001092

11:00 AM - 01:30 PM: 106 - Batt Insulation

11:00 AM - 01:30 PM: 112 - Frame

2026-04-28 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-28 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-04-27 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

2026-04-24 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-24 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-04-23 - 2026-FIRE-0000643

08:30 AM - 10:30 AM: 411 - Rough

2026-04-23 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-23 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-04-22 - 2026-FIRE-0000643

10:15 AM - 12:15 PM: 411 - Rough

2026-04-22 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 106 - Batt Insulation

2026-04-21 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 106 - Batt Insulation

2026-04-20 - 2025-COMMCON-0001092

08:30 AM - 09:30 AM: 106 - Batt Insulation

2026-04-17 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 112 - Frame

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-16 - 2025-FIRE-0007400

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-16 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-16 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-04-15 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 106 - Batt Insulation

2026-04-14 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-13 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-10 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-09 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-08 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-08 - 2025-COMMCON-0002129

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-08 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-04-07 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-07 - 2025-COMMCON-0002129

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 112 - Frame

2026-04-06 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-06 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-04-03 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-04-03 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-04-02 - 2025-FIRE-0007400

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-02 - 2025-COMMCON-0001092

09:00 AM - 11:00 AM: 112 - Frame

2026-04-02 - 2025-COMMCON-0002129

09:00 AM - 11:00 AM: 112 - Frame

2026-04-02 - 2025-ELEC-0005360

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-02 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-04-01 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-01 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-04-01 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-03-31 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-31 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-27 - 2025-ELEC-0005360

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-03-27 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-03-27 - 2025-FIRE-0007400

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-03-26 - 2025-COMMCON-0001092

12:00 PM - 02:00 PM: 112 - Frame

2026-03-25 - 2025-COMMCON-0001092

10:00 AM - 12:00 PM: 112 - Frame

2026-03-24 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-24 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-03-23 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-23 - 2025-COMMCON-0001092

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-03-23 - 2025-COMMCON-0002129

11:00 AM - 01:00 PM: 108 - Final - Commercial

2026-03-23 - 2025-MECH-0004119

09:00 AM - 11:00 AM: 903 - Rough

2026-03-20 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-20 - 2025-COMMCON-0001092

11:30 AM - 01:30 PM: 112 - Frame

2026-03-20 - 2025-COMMCON-0002129

11:30 AM - 01:30 PM: 112 - Frame

2026-03-20 - 2025-ELEC-0005360

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-03-20 - 2025-FIRE-0007400

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-03-19 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-19 - 2025-MECH-0004119

08:30 AM - 11:00 AM: 902 - Partial Rough

2026-03-18 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-18 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-03-18 - 2025-PLUMB-0006031

12:15 PM - 03:00 PM: 401 - Rough

2026-03-17 - 2025-PLUMB-0006031

11:15 AM - 01:15 PM: 401 - Rough

2026-03-16 - 2025-FIRE-0006076

10:30 AM - 12:30 PM: 411 - Rough

2026-03-16 - 2025-PLUMB-0006031

10:30 AM - 12:30 PM: 401 - Rough

2026-03-16 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-03-16 - 2025-FIRE-0007400

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-03-13 - 2025-ELEC-0005360

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-03-13 - 2025-FIRE-0007400

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-03-13 - 2025-PLUMB-0006031

10:15 AM - 12:15 PM: 401 - Rough

2026-03-12 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-12 - 2025-COMMCON-0001092

10:30 AM - 11:30 AM: 106 - Batt Insulation

10:30 AM - 11:30 AM: 112 - Frame

2026-03-12 - 2025-COMMCON-0002129

10:30 AM - 11:30 AM: 106 - Batt Insulation

10:30 AM - 11:30 AM: 112 - Frame

2026-03-12 - 2025-ELEC-0005360

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-12 - 2025-FIRE-0007400

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-11 - 2025-FIRE-0006076

10:30 AM - 12:30 PM: 411 - Rough

2026-03-11 - 2025-ELEC-0005360

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-11 - 2025-FIRE-0007400

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-11 - 2026-ROOFSIDE-0000943

01:00 PM - 03:00 PM: 206 - Other

2026-03-10 - 2025-FIRE-0006076

10:15 AM - 12:15 PM: 411 - Rough

2026-03-10 - 2025-MECH-0004119

11:00 AM - 01:00 PM: 903 - Rough

2026-03-10 - 2025-COMMCON-0001092

01:00 PM - 03:00 PM: 107 - Drywall

2026-03-10 - 2025-COMMCON-0002129

01:00 PM - 03:00 PM: 107 - Drywall

2026-03-10 - 2026-ROOFSIDE-0000943

01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof

2026-03-09 - 2025-FIRE-0007400

12:00 PM - 02:00 PM: 302 - Partial Rough