225 E Bayaud AVE
Recent Inspections
2026-06-12 - 2023-MECH-0006154
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-06-11 - 2023-COMMCON-0001470
09:00 AM - 11:00 AM: 109 - Other
2026-06-11 - 2023-PLUMB-0008765
01:00 PM - 03:00 PM: 401 - Rough
TBD: 402 - Final - Plumbing
2026-06-10 - 2023-PLUMB-0008765
01:00 PM - 03:00 PM: 401 - Rough
2026-06-10 - 2026-ELEC-0001211
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-05-26 - 2023-COMMCON-0001470
01:00 PM - 03:00 PM: 109 - Other
2026-05-26 - 2026-ELEC-0001211
08:00 AM - 10:00 AM: 304 - Partial Final
2026-05-20 - 2026-ELEC-0001211
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-12 - 2026-ELEC-0001211
09:00 AM - 11:00 AM: 304 - Partial Final
2026-05-07 - 2026-ELEC-0001211
12:00 PM - 02:00 PM: 304 - Partial Final
2026-05-06 - 2026-ELEC-0001211
08:00 AM - 10:00 AM: 304 - Partial Final
2026-04-09 - 2023-COMMCON-0001470
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-04-08 - 2023-COMMCON-0001470
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-04-07 - 2023-COMMCON-0001470
12:00 PM - 02:00 PM: 108 - Final - Commercial
2026-03-31 - 2026-ELEC-0001211
01:00 PM - 03:00 PM: 304 - Partial Final
2026-03-20 - 2024-COMMCON-0001696
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-03-19 - 2024-COMMCON-0001696
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-03-18 - 2023-PLUMB-0008765
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-03-16 - 2023-COMMCON-0001470
10:00 AM - 12:00 PM: 109 - Other
2026-03-16 - 2026-ELEC-0001207
- TBD: 305 - Final - Electrical
2026-03-13 - 2023-COMMCON-0001470
11:00 AM - 01:00 PM: 109 - Other
2026-03-12 - 2026-ELEC-0001211
11:00 AM - 01:00 PM: 304 - Partial Final
2026-03-12 - 2023-MECH-0006154
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-03-11 - 2026-ELEC-0001211
08:00 AM - 10:00 AM: 304 - Partial Final
2026-03-05 - 2023-MECH-0006154
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-03-03 - 2026-ELEC-0001211
10:00 AM - 12:00 PM: 304 - Partial Final
2026-02-27 - 2026-ELEC-0001211
10:00 AM - 12:00 PM: 304 - Partial Final
2026-02-20 - 2026-ELEC-0001211
09:00 AM - 11:00 AM: 304 - Partial Final
2026-02-13 - 2026-ELEC-0001211
09:00 AM - 11:00 AM: 304 - Partial Final
2026-02-13 - 2026-ELEC-0001207
- TBD: 304 - Partial Final
2026-01-20 - 2023-PLUMB-0008765
12:30 PM - 03:00 PM: 402 - Final - Plumbing
2256 N Hudson ST
Recent Inspections
2026-06-12 - 2026-RESCON-0000819
10:00 AM - 01:00 PM: 109 - Other
2026-05-29 - 2026-RESCON-0000819
TBD: 113 - Pre Construction Meeting
2026-05-22 - 2026-RESCON-0000819
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-04-01 - 2026-ELEC-0002782
12:00 PM - 02:30 PM: 305 - Final - Electrical
12:00 PM - 02:30 PM: 313 - Meter Release
2026-01-20 - 2025-DEMO-0000740
12:00 PM - 02:00 PM: 110 - Final - Demo
2150 S Josephine ST
Recent Inspections
2026-06-12 - 2026-MECH-0001422
11:00 AM - 01:00 PM: 903 - Rough
2026-06-11 - 2025-RESCON-0000009
10:30 AM - 12:30 PM: 112 - Frame
2026-06-10 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 112 - Frame
2026-06-09 - 2026-MECH-0001422
01:00 PM - 03:00 PM: 903 - Rough
2026-06-05 - 2025-RESCON-0000008
11:00 AM - 01:00 PM: 109 - Other
2026-06-05 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 109 - Other
2026-06-05 - 2026-MECH-0001424
09:00 AM - 11:00 AM: 903 - Rough
2026-06-04 - 2024-ELEC-0006862
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-04 - 2024-ELEC-0006863
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-04 - 2024-ELEC-0006864
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-01 - 2024-ELEC-0006859
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-01 - 2024-ELEC-0006860
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-01 - 2024-ELEC-0006861
10:00 AM - 12:00 PM: 303 - Full Rough
2026-05-14 - 2025-RESCON-0000008
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-14 - 2025-RESCON-0000009
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-14 - 2024-ELEC-0006856
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-14 - 2024-ELEC-0006857
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-14 - 2024-ELEC-0006858
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-14 - 2024-ELEC-0006868
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-13 - 2025-RESCON-0000008
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-12 - 2024-ELEC-0006857
08:30 AM - 10:30 AM: 303 - Full Rough
2026-05-12 - 2024-ELEC-0006861
08:30 AM - 10:30 AM: 303 - Full Rough
2026-05-12 - 2024-ELEC-0006864
08:30 AM - 10:30 AM: 303 - Full Rough
2026-05-12 - 2024-ELEC-0006866
08:30 AM - 10:30 AM: 303 - Full Rough
2026-05-12 - 2024-ELEC-0006867
08:30 AM - 10:30 AM: 303 - Full Rough
2026-05-07 - 2024-ELEC-0006857
08:30 AM - 09:30 AM: 303 - Full Rough
2026-05-07 - 2024-ELEC-0006861
10:00 AM - 12:00 PM: 303 - Full Rough
2026-05-07 - 2024-ELEC-0006864
11:00 AM - 01:00 PM: 303 - Full Rough
2026-05-07 - 2024-ELEC-0006866
11:00 AM - 01:00 PM: 303 - Full Rough
2026-05-07 - 2024-ELEC-0006867
11:00 AM - 01:00 PM: 303 - Full Rough
2026-05-07 - 2025-PLUMB-0010841
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010845
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010848
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010850
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010851
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010868
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0010965
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-07 - 2025-PLUMB-0011444
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010841
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010845
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010851
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010868
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010965
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0010966
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011132
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011134
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011136
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011444
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011445
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011446
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011447
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-05-05 - 2025-PLUMB-0011448
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-04-30 - 2024-ELEC-0002824
12:00 PM - 02:00 PM: 303 - Full Rough
2026-04-30 - 2024-ELEC-0006860
12:00 PM - 02:00 PM: 303 - Full Rough
2026-04-30 - 2024-ELEC-0006865
12:00 PM - 02:00 PM: 303 - Full Rough
2026-04-28 - 2024-ELEC-0002824
10:00 AM - 12:00 PM: 303 - Full Rough
2026-04-28 - 2024-ELEC-0006860
10:00 AM - 12:00 PM: 303 - Full Rough
2026-04-28 - 2024-ELEC-0006865
10:00 AM - 12:00 PM: 303 - Full Rough
2026-04-24 - 2025-PLUMB-0010741
08:30 AM - 11:30 AM: 401 - Rough
2026-04-24 - 2025-PLUMB-0010742
08:30 AM - 11:30 AM: 401 - Rough
2026-04-24 - 2025-PLUMB-0010744
08:30 AM - 11:30 AM: 401 - Rough
2026-04-24 - 2025-PLUMB-0010746
08:30 AM - 11:30 AM: 401 - Rough
2026-04-24 - 2025-PLUMB-0010750
08:30 AM - 11:30 AM: 401 - Rough
2026-04-24 - 2025-PLUMB-0010752
08:30 AM - 11:30 AM: 401 - Rough
2026-04-23 - 2026-MECH-0001386
01:00 PM - 03:00 PM: 903 - Rough
2026-04-23 - 2026-MECH-0001389
01:00 PM - 03:00 PM: 903 - Rough
2026-04-23 - 2026-MECH-0001392
01:00 PM - 03:00 PM: 903 - Rough
2026-04-22 - 2025-RESCON-0000009
TBD: 111 - Exterior Lath
2026-04-21 - 2025-RESCON-0000008
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2026-MECH-0001437
11:00 AM - 01:00 PM: 903 - Rough
2026-04-02 - 2025-PLUMB-0011015
08:30 AM - 11:30 AM: 401 - Rough
2026-04-02 - 2025-PLUMB-0011016
08:30 AM - 11:30 AM: 401 - Rough
2026-04-02 - 2025-PLUMB-0011017
08:30 AM - 11:30 AM: 401 - Rough
2026-04-02 - 2025-PLUMB-0011019
08:30 AM - 11:30 AM: 401 - Rough
2026-04-02 - 2026-MECH-0001436
01:00 PM - 03:00 PM: 903 - Rough
2026-04-02 - 2026-MECH-0001437
01:00 PM - 03:00 PM: 903 - Rough
2026-04-02 - 2026-MECH-0001439
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2026-MECH-0001436
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2026-MECH-0001437
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2026-MECH-0001439
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2026-MECH-0001440
01:00 PM - 03:00 PM: 903 - Rough
2026-03-27 - 2025-RESCON-0000017
09:00 AM - 11:00 AM: 107 - Drywall
2026-03-27 - 2025-RESCON-0000018
09:00 AM - 11:00 AM: 107 - Drywall
2026-03-27 - 2025-RESCON-0000019
09:00 AM - 11:00 AM: 107 - Drywall
2026-03-27 - 2025-RESCON-0000020
09:00 AM - 11:00 AM: 107 - Drywall
2026-03-24 - 2025-RESCON-0000008
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2025-RESCON-0000017
08:30 AM - 05:30 PM: 106 - Batt Insulation
2026-03-24 - 2025-RESCON-0000018
08:30 AM - 05:30 PM: 106 - Batt Insulation
2026-03-24 - 2025-RESCON-0000019
08:30 AM - 05:30 PM: 106 - Batt Insulation
2026-03-24 - 2025-RESCON-0000020
08:30 AM - 05:30 PM: 106 - Batt Insulation
2026-03-24 - 2026-ROOFSIDE-0001203
11:00 AM - 01:00 PM: 206 - Other
2026-03-24 - 2026-ROOFSIDE-0001204
11:00 AM - 01:00 PM: 206 - Other
2026-03-24 - 2026-ROOFSIDE-0001205
11:00 AM - 01:00 PM: 206 - Other
2026-03-24 - 2026-ROOFSIDE-0001206
11:00 AM - 01:00 PM: 206 - Other
2026-03-24 - 2026-ROOFSIDE-0001207
11:00 AM - 01:00 PM: 206 - Other
2026-03-24 - 2026-ROOFSIDE-0001209
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2025-RESCON-0000008
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000009
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000017
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-23 - 2025-RESCON-0000018
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-23 - 2025-RESCON-0000019
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-23 - 2025-RESCON-0000020
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-23 - 2026-ROOFSIDE-0001203
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2026-ROOFSIDE-0001204
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2026-ROOFSIDE-0001205
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2026-ROOFSIDE-0001206
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2026-ROOFSIDE-0001207
11:00 AM - 01:00 PM: 206 - Other
2026-03-23 - 2026-ROOFSIDE-0001209
11:00 AM - 01:00 PM: 206 - Other
2026-03-20 - 2025-RESCON-0000017
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-20 - 2025-RESCON-0000018
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-20 - 2025-RESCON-0000019
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-20 - 2025-RESCON-0000020
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-11 - 2025-PLUMB-0010534
08:30 AM - 11:30 AM: 401 - Rough
2026-03-11 - 2025-PLUMB-0010535
08:30 AM - 11:30 AM: 401 - Rough
2026-03-11 - 2025-PLUMB-0010536
08:30 AM - 11:30 AM: 401 - Rough
2026-03-11 - 2025-PLUMB-0010537
08:30 AM - 11:30 AM: 401 - Rough
2026-02-18 - 2025-RESCON-0000005
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-18 - 2025-RESCON-0000006
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-18 - 2023-RESCON-0004176
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-17 - 2023-RESCON-0004176
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-17 - 2025-RESCON-0000005
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-17 - 2025-RESCON-0000006
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-13 - 2023-RESCON-0004176
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-02-13 - 2025-RESCON-0000005
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-02-13 - 2025-RESCON-0000006
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-02-10 - 2023-RESCON-0004176
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
10:00 AM - 12:00 PM: 109 - Other
2026-02-10 - 2025-RESCON-0000005
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
10:00 AM - 12:00 PM: 109 - Other
2026-02-10 - 2025-RESCON-0000006
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
10:00 AM - 12:00 PM: 109 - Other
2026-02-07 - 2023-RESCON-0004176
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-07 - 2025-RESCON-0000005
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-07 - 2025-RESCON-0000006
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-06 - 2023-RESCON-0004176
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-06 - 2025-RESCON-0000005
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-06 - 2025-RESCON-0000006
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-05 - 2025-RESCON-0000019
11:00 AM - 01:00 PM: 116 - Building Slab
2026-02-05 - 2025-RESCON-0000020
11:00 AM - 01:00 PM: 116 - Building Slab
2026-02-05 - 2025-RESCON-0000017
11:00 AM - 01:00 PM: 116 - Building Slab
2026-02-05 - 2025-RESCON-0000018
11:00 AM - 01:00 PM: 116 - Building Slab
2026-02-04 - 2026-ROOFSIDE-0000475
11:00 AM - 01:00 PM: 206 - Other
2026-02-04 - 2026-ROOFSIDE-0000476
11:00 AM - 01:00 PM: 206 - Other
2026-02-04 - 2026-ROOFSIDE-0000477
11:00 AM - 01:00 PM: 206 - Other
2026-02-04 - 2026-ROOFSIDE-0000478
11:00 AM - 01:00 PM: 206 - Other
2026-01-21 - 2025-RESCON-0000017
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-21 - 2025-RESCON-0000018
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-21 - 2025-RESCON-0000019
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-21 - 2025-RESCON-0000020
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-20 - 2025-RESCON-0000017
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-20 - 2025-RESCON-0000018
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-20 - 2025-RESCON-0000019
11:00 AM - 01:00 PM: 116 - Building Slab
2026-01-20 - 2025-RESCON-0000020
11:00 AM - 01:00 PM: 116 - Building Slab
2691 N Krameria St
Recent Inspections
2026-06-12 - 2025-RESCON-0000676
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-14 - 2025-RESCON-0000676
10:00 AM - 12:00 PM: Document Review
2026-05-13 - 2025-RESCON-0000676
12:00 PM - 02:00 PM: Document Review
12:00 PM - 02:00 PM: 112 - Frame
2026-05-12 - 2025-RESCON-0000676
10:00 AM - 01:00 PM: 112 - Frame
2026-01-20 - 2025-ELEC-0002343
10:00 AM - 12:00 PM: 303 - Full Rough
6705 E Layton AVE
Recent Inspections
2026-06-13 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 112 - Frame
2026-06-12 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-12 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-12 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-11 - 2026-FIRE-0000859
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-11 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-11 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-11 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-10 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-10 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-10 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-09 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-09 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-09 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-08 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-08 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-06-08 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-08 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-06-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-03 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-03 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-06-02 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-02 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-06-02 - 2025-ELEC-0009877
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-06-01 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-06-01 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 303 - Full Rough
2026-06-01 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-05-28 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-05-28 - 2025-PLUMB-0001152
08:30 AM - 11:30 AM: 401 - Rough
2026-05-28 - 2025-MECH-0007069
08:30 AM - 09:30 AM: 903 - Rough
2026-05-27 - 2025-ELEC-0009877
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-05-27 - 2025-FIRE-0006782
TBD: 302 - Partial Rough
2026-05-27 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-26 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-21 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-21 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-20 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-19 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-19 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-18 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-18 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-05-18 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-15 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-15 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-14 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-05-14 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-14 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-13 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-13 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-12 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-12 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-12 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-11 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-11 - 2025-COMMCON-0000796
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-05-11 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-08 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-08 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-07 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-07 - 2025-FIRE-0006782
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-06 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-06 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-05 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-05-05 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-05-02 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-01 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-01 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-05-01 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-30 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-30 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-30 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-29 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 112 - Frame
2026-04-29 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-29 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-04-29 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-28 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-28 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-27 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-24 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-24 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-22 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-04-22 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-21 - 2025-COMMCON-0000796
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-04-14 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-13 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-13 - 2025-BOILERAC-0000818
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-04-13 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-13 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-13 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-10 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-04-10 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-04-09 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-07 - 2025-COMMCON-0000796
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-04-07 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-07 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-04-06 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-04-02 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-04-01 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-31 - 2025-FIRE-0006782
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-31 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-31 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 903 - Rough
2026-03-31 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 401 - Rough
2026-03-27 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-27 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-27 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-26 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-26 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-25 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-25 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-23 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-23 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-03-20 - 2025-MECH-0007065
01:00 PM - 03:00 PM: 903 - Rough
2026-03-20 - 2025-ELEC-0005596
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-20 - 2025-FIRE-0006782
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-19 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-03-19 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-19 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-03-18 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-03-17 - 2025-COMMCON-0000796
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-03-13 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 404 - Water Service
2026-03-11 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-03-10 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-03-09 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-03-09 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-03-06 - 2025-COMMCON-0000796
08:00 AM - 11:00 AM: 106 - Batt Insulation
08:00 AM - 11:00 AM: 107 - Drywall
08:00 AM - 11:00 AM: 112 - Frame
2026-03-05 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-02-27 - 2025-COMMCON-0000796
09:00 AM - 09:30 AM: 106 - Batt Insulation
09:00 AM - 09:30 AM: 107 - Drywall
09:00 AM - 09:30 AM: 112 - Frame
2026-02-27 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-27 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-26 - 2025-PLUMB-0001152
08:00 AM - 10:00 AM: 404 - Water Service
2026-02-26 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-25 - 2025-MECH-0007065
08:30 AM - 09:30 AM: 903 - Rough
2026-02-24 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-20 - 2025-MECH-0007069
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-02-19 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-18 - 2025-FIRE-0004657
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-18 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-17 - 2025-PLUMB-0009505
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-02-13 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-12 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-12 - 2025-ELEC-0009877
10:00 AM - 12:00 PM: 300 - Slab
2026-02-10 - 2025-FIRE-0004657
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-02-10 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-10 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-02-09 - 2025-COMMCON-0000200
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-02-09 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-02-09 - 2025-COMMCON-0000796
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-02-05 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-02-05 - 2025-ELEC-0009960
TBD: 305 - Final - Electrical
2026-02-04 - 2025-COMMCON-0000796
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-04 - 2025-ELEC-0009160
01:00 PM - 03:00 PM: 300 - Slab
2026-02-04 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-02-02 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-02-02 - 2025-ELEC-0009160
12:00 PM - 02:00 PM: 300 - Slab
2026-02-02 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-01-29 - 2025-COMMCON-0000796
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-01-29 - 2025-ELEC-0009877
12:00 PM - 02:00 PM: 300 - Slab
2026-01-28 - 2025-ELEC-0009877
01:00 PM - 03:00 PM: 300 - Slab
2026-01-26 - 2025-ELEC-0009160
10:00 AM - 12:00 PM: 300 - Slab
2026-01-21 - 2025-MECH-0007069
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-01-20 - 2025-ELEC-0009877
09:00 AM - 11:00 AM: 300 - Slab
4537 N Utica ST
Recent Inspections
2026-06-12 - 2025-RESCON-0001979
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-09 - 2025-RESCON-0001979
09:00 AM - 11:00 AM: 112 - Frame
2026-06-04 - 2026-ELEC-0004125
11:00 AM - 01:00 PM: 303 - Full Rough
2026-04-17 - 2025-RESCON-0001979
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-02-13 - 2025-RESCON-0001979
09:00 AM - 11:00 AM: 109 - Other
2026-01-20 - 2025-RESCON-0001979
09:00 AM - 11:00 AM: 100 - Footing
11100 E 51st AVE
Recent Inspections
2026-06-13 - 2025-PLUMB-0007261
10:30 AM - 12:30 PM: 401 - Rough
2026-06-12 - 2025-PLUMB-0007261
10:30 AM - 12:30 PM: 401 - Rough
2026-06-11 - 2025-ELEC-0007175
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-06-11 - 2026-PLUMB-0004346
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-06-11 - 2026-ELEC-0003779
TBD: 304 - Partial Final
2026-06-09 - 2026-FIRE-0001442
10:30 AM - 12:30 PM: 411 - Rough
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-05-15 - 2026-ELEC-0003902
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-05-15 - 2026-FIRE-0002426
01:00 PM - 03:00 PM: 303 - Full Rough
2026-05-14 - 2026-FIRE-0002426
01:00 PM - 03:00 PM: 303 - Full Rough
2026-05-14 - 2026-ELEC-0003902
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-05-08 - 2025-COMMCON-0001420
09:00 AM - 12:00 PM: 107 - Drywall
2026-05-06 - 2025-ELEC-0007175
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-05 - 2025-FIRE-0006472
08:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-03-04 - 2025-FIRE-0006472
08:30 AM - 05:30 PM: 412 - Final - Fire Suppression
2026-03-03 - 2025-COMMCON-0001420
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-03 - 2025-ELEC-0007175
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-03-02 - 2025-COMMCON-0001420
09:00 AM - 12:00 PM: 108 - Final - Commercial
2026-03-02 - 2025-ELEC-0007175
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-26 - 2025-COMMCON-0001420
09:00 AM - 11:00 AM: 109 - Other
2026-02-26 - 2025-ELEC-0007175
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-02-25 - 2025-ELEC-0007175
12:00 PM - 02:00 PM: 305 - Final - Electrical
- TBD: 307 - Service Equipment
2026-02-09 - 2025-ELEC-0007175
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-06 - 2025-MECH-0005314
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-01-28 - 2025-ELEC-0007175
12:00 PM - 02:00 PM: 304 - Partial Final
2026-01-28 - 2025-MECH-0005314
11:00 AM - 01:00 PM: 903 - Rough
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-01-16 - 2025-FIRE-0006472
12:15 PM - 03:00 PM: 411 - Rough
3265 S Bellaire ST
Recent Inspections
2026-06-12 - 2026-MECH-0003542
11:00 AM - 01:00 PM: 903 - Rough
2026-06-11 - 2026-MECH-0003361
11:00 AM - 01:00 PM: 903 - Rough
2026-06-09 - 2024-RESCON-0003944
01:00 PM - 03:00 PM: 112 - Frame
2026-06-08 - 2026-BOILERAC-0000410
11:00 AM - 01:00 PM: 703 - Rough
2026-06-08 - 2026-MECH-0003361
11:00 AM - 01:00 PM: 903 - Rough
2026-06-03 - 2026-PLUMB-0000534
08:30 AM - 11:30 AM: 401 - Rough
2026-05-28 - 2026-PLUMB-0004483
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-05-14 - 2026-ELEC-0004053
10:00 AM - 12:00 PM: 303 - Full Rough
2026-05-11 - 2026-ELEC-0004053
10:00 AM - 12:00 PM: 303 - Full Rough
2026-05-07 - 2024-RESCON-0003944
08:30 AM - 05:30 PM: 109 - Other
2026-05-06 - 2024-RESCON-0003944
11:00 AM - 01:00 PM: 109 - Other
2026-04-30 - 2026-PLUMB-0000534
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-04-24 - 2024-RESCON-0003944
01:00 PM - 03:00 PM: 100 - Footing
01:00 PM - 03:00 PM: 101 - Foundation Wall
2026-01-16 - 2026-PLUMB-0000534
08:30 AM - 12:00 PM: 401 - Rough
08:30 AM - 12:00 PM: 402 - Final - Plumbing
3 N Albion ST
Recent Inspections
2026-06-12 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-05 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 109 - Other
2026-06-04 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-01 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 112 - Frame
2026-05-29 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 109 - Other
09:00 AM - 11:00 AM: 112 - Frame
2026-05-28 - 2026-ELEC-0004425
10:00 AM - 12:00 PM: 303 - Full Rough
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-05-19 - 2026-PLUMB-0001287
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-05-18 - 2026-PLUMB-0001287
10:30 AM - 01:00 PM: 401 - Rough
10:30 AM - 01:00 PM: 403 - Pressure Test
2026-05-14 - 2026-PLUMB-0001287
08:01 AM - 10:00 AM: 401 - Rough
08:01 AM - 10:00 AM: 403 - Pressure Test
2026-04-21 - 2026-MECH-0002426
12:00 PM - 02:00 PM: 903 - Rough
2026-03-31 - 2025-RESCON-0003077
09:00 AM - 11:00 AM: 101 - Foundation Wall
09:00 AM - 11:00 AM: 102 - Foundation Perimeter Drain
2026-02-19 - 2025-RESCON-0003077
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
2026-02-17 - 2026-PLUMB-0001287
10:30 AM - 01:00 PM: 400 - Groundwork
2026-01-16 - 2026-ELEC-0000323
08:00 AM - 10:00 AM: 311 - Temporary Service
1594 S Acoma ST
Recent Inspections
2026-06-12 - 2025-ELEC-0010396
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-06-12 - 2025-MECH-0007182
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-05-21 - 2025-ELEC-0010396
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-05-21 - 2026-LOG-0004757
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-05-20 - 2025-ELEC-0010396
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-05-07 - 2025-ELEC-0010396
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-04-10 - 2025-ELEC-0010396
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 308 - Ceiling
2026-04-08 - 2025-MECH-0007182
01:00 PM - 03:00 PM: 903 - Rough
2026-04-07 - 2025-MECH-0007182
08:30 AM - 09:30 AM: 903 - Rough
2026-03-19 - 2025-PLUMB-0009657
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-05 - 2025-ELEC-0010396
10:00 AM - 12:00 PM: 303 - Full Rough
2026-02-03 - 2025-ELEC-0010396
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-01-30 - 2025-ELEC-0006454
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-01-16 - 2025-PLUMB-0009657
08:00 AM - 10:00 AM: 401 - Rough