Property Status: Active

225 E Bayaud AVE

Directions

Recent Inspections

2026-06-12 - 2023-MECH-0006154

10:00 AM - 12:00 PM: 904 - Final - Mechanical

2026-06-11 - 2023-COMMCON-0001470

09:00 AM - 11:00 AM: 109 - Other

2026-06-11 - 2023-PLUMB-0008765

01:00 PM - 03:00 PM: 401 - Rough

TBD: 402 - Final - Plumbing

2026-06-10 - 2023-PLUMB-0008765

01:00 PM - 03:00 PM: 401 - Rough

2026-06-10 - 2026-ELEC-0001211

11:00 AM - 01:00 PM: 305 - Final - Electrical

2026-05-26 - 2023-COMMCON-0001470

01:00 PM - 03:00 PM: 109 - Other

2026-05-26 - 2026-ELEC-0001211

08:00 AM - 10:00 AM: 304 - Partial Final

2026-05-20 - 2026-ELEC-0001211

10:00 AM - 12:00 PM: 304 - Partial Final

2026-05-12 - 2026-ELEC-0001211

09:00 AM - 11:00 AM: 304 - Partial Final

2026-05-07 - 2026-ELEC-0001211

12:00 PM - 02:00 PM: 304 - Partial Final

2026-05-06 - 2026-ELEC-0001211

08:00 AM - 10:00 AM: 304 - Partial Final

2026-04-09 - 2023-COMMCON-0001470

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-04-08 - 2023-COMMCON-0001470

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-04-07 - 2023-COMMCON-0001470

12:00 PM - 02:00 PM: 108 - Final - Commercial

2026-03-31 - 2026-ELEC-0001211

01:00 PM - 03:00 PM: 304 - Partial Final

2026-03-20 - 2024-COMMCON-0001696

12:00 PM - 02:00 PM: 113 - Pre Construction Meeting

2026-03-19 - 2024-COMMCON-0001696

12:00 PM - 02:00 PM: 113 - Pre Construction Meeting

2026-03-18 - 2023-PLUMB-0008765

10:00 AM - 12:00 PM: 402 - Final - Plumbing

2026-03-16 - 2023-COMMCON-0001470

10:00 AM - 12:00 PM: 109 - Other

2026-03-16 - 2026-ELEC-0001207

- TBD: 305 - Final - Electrical

2026-03-13 - 2023-COMMCON-0001470

11:00 AM - 01:00 PM: 109 - Other

2026-03-12 - 2026-ELEC-0001211

11:00 AM - 01:00 PM: 304 - Partial Final

2026-03-12 - 2023-MECH-0006154

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-03-11 - 2026-ELEC-0001211

08:00 AM - 10:00 AM: 304 - Partial Final

2026-03-05 - 2023-MECH-0006154

08:30 AM - 09:30 AM: 904 - Final - Mechanical

2026-03-03 - 2026-ELEC-0001211

10:00 AM - 12:00 PM: 304 - Partial Final

2026-02-27 - 2026-ELEC-0001211

10:00 AM - 12:00 PM: 304 - Partial Final

2026-02-20 - 2026-ELEC-0001211

09:00 AM - 11:00 AM: 304 - Partial Final

2026-02-13 - 2026-ELEC-0001211

09:00 AM - 11:00 AM: 304 - Partial Final

2026-02-13 - 2026-ELEC-0001207

- TBD: 304 - Partial Final

2026-01-20 - 2023-PLUMB-0008765

12:30 PM - 03:00 PM: 402 - Final - Plumbing

2256 N Hudson ST

Directions

Recent Inspections

2026-06-12 - 2026-RESCON-0000819

10:00 AM - 01:00 PM: 109 - Other

2026-05-29 - 2026-RESCON-0000819

TBD: 113 - Pre Construction Meeting

2026-05-22 - 2026-RESCON-0000819

09:30 AM - 11:30 AM: 113 - Pre Construction Meeting

2026-04-01 - 2026-ELEC-0002782

12:00 PM - 02:30 PM: 305 - Final - Electrical

12:00 PM - 02:30 PM: 313 - Meter Release

2026-01-20 - 2025-DEMO-0000740

12:00 PM - 02:00 PM: 110 - Final - Demo

2150 S Josephine ST

Directions

Recent Inspections

2026-06-12 - 2026-MECH-0001422

11:00 AM - 01:00 PM: 903 - Rough

2026-06-11 - 2025-RESCON-0000009

10:30 AM - 12:30 PM: 112 - Frame

2026-06-10 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 112 - Frame

2026-06-09 - 2026-MECH-0001422

01:00 PM - 03:00 PM: 903 - Rough

2026-06-05 - 2025-RESCON-0000008

11:00 AM - 01:00 PM: 109 - Other

2026-06-05 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 109 - Other

2026-06-05 - 2026-MECH-0001424

09:00 AM - 11:00 AM: 903 - Rough

2026-06-04 - 2024-ELEC-0006862

11:00 AM - 01:00 PM: 303 - Full Rough

2026-06-04 - 2024-ELEC-0006863

11:00 AM - 01:00 PM: 303 - Full Rough

2026-06-04 - 2024-ELEC-0006864

11:00 AM - 01:00 PM: 303 - Full Rough

2026-06-01 - 2024-ELEC-0006859

10:00 AM - 12:00 PM: 303 - Full Rough

2026-06-01 - 2024-ELEC-0006860

10:00 AM - 12:00 PM: 303 - Full Rough

2026-06-01 - 2024-ELEC-0006861

10:00 AM - 12:00 PM: 303 - Full Rough

2026-05-14 - 2025-RESCON-0000008

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-05-14 - 2025-RESCON-0000009

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-05-14 - 2024-ELEC-0006856

12:00 PM - 02:00 PM: 303 - Full Rough

2026-05-14 - 2024-ELEC-0006857

12:00 PM - 02:00 PM: 303 - Full Rough

2026-05-14 - 2024-ELEC-0006858

12:00 PM - 02:00 PM: 303 - Full Rough

2026-05-14 - 2024-ELEC-0006868

12:00 PM - 02:00 PM: 303 - Full Rough

2026-05-13 - 2025-RESCON-0000008

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-05-13 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-05-12 - 2024-ELEC-0006857

08:30 AM - 10:30 AM: 303 - Full Rough

2026-05-12 - 2024-ELEC-0006861

08:30 AM - 10:30 AM: 303 - Full Rough

2026-05-12 - 2024-ELEC-0006864

08:30 AM - 10:30 AM: 303 - Full Rough

2026-05-12 - 2024-ELEC-0006866

08:30 AM - 10:30 AM: 303 - Full Rough

2026-05-12 - 2024-ELEC-0006867

08:30 AM - 10:30 AM: 303 - Full Rough

2026-05-07 - 2024-ELEC-0006857

08:30 AM - 09:30 AM: 303 - Full Rough

2026-05-07 - 2024-ELEC-0006861

10:00 AM - 12:00 PM: 303 - Full Rough

2026-05-07 - 2024-ELEC-0006864

11:00 AM - 01:00 PM: 303 - Full Rough

2026-05-07 - 2024-ELEC-0006866

11:00 AM - 01:00 PM: 303 - Full Rough

2026-05-07 - 2024-ELEC-0006867

11:00 AM - 01:00 PM: 303 - Full Rough

2026-05-07 - 2025-PLUMB-0010841

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010845

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010848

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010850

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010851

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010868

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0010965

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-07 - 2025-PLUMB-0011444

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010841

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010845

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010851

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010868

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010965

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0010966

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011132

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011134

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011136

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011444

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011445

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011446

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011447

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-05-05 - 2025-PLUMB-0011448

12:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-04-30 - 2024-ELEC-0002824

12:00 PM - 02:00 PM: 303 - Full Rough

2026-04-30 - 2024-ELEC-0006860

12:00 PM - 02:00 PM: 303 - Full Rough

2026-04-30 - 2024-ELEC-0006865

12:00 PM - 02:00 PM: 303 - Full Rough

2026-04-28 - 2024-ELEC-0002824

10:00 AM - 12:00 PM: 303 - Full Rough

2026-04-28 - 2024-ELEC-0006860

10:00 AM - 12:00 PM: 303 - Full Rough

2026-04-28 - 2024-ELEC-0006865

10:00 AM - 12:00 PM: 303 - Full Rough

2026-04-24 - 2025-PLUMB-0010741

08:30 AM - 11:30 AM: 401 - Rough

2026-04-24 - 2025-PLUMB-0010742

08:30 AM - 11:30 AM: 401 - Rough

2026-04-24 - 2025-PLUMB-0010744

08:30 AM - 11:30 AM: 401 - Rough

2026-04-24 - 2025-PLUMB-0010746

08:30 AM - 11:30 AM: 401 - Rough

2026-04-24 - 2025-PLUMB-0010750

08:30 AM - 11:30 AM: 401 - Rough

2026-04-24 - 2025-PLUMB-0010752

08:30 AM - 11:30 AM: 401 - Rough

2026-04-23 - 2026-MECH-0001386

01:00 PM - 03:00 PM: 903 - Rough

2026-04-23 - 2026-MECH-0001389

01:00 PM - 03:00 PM: 903 - Rough

2026-04-23 - 2026-MECH-0001392

01:00 PM - 03:00 PM: 903 - Rough

2026-04-22 - 2025-RESCON-0000009

TBD: 111 - Exterior Lath

2026-04-21 - 2025-RESCON-0000008

11:00 AM - 01:00 PM: 107 - Drywall

2026-04-21 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 107 - Drywall

2026-04-21 - 2026-MECH-0001437

11:00 AM - 01:00 PM: 903 - Rough

2026-04-02 - 2025-PLUMB-0011015

08:30 AM - 11:30 AM: 401 - Rough

2026-04-02 - 2025-PLUMB-0011016

08:30 AM - 11:30 AM: 401 - Rough

2026-04-02 - 2025-PLUMB-0011017

08:30 AM - 11:30 AM: 401 - Rough

2026-04-02 - 2025-PLUMB-0011019

08:30 AM - 11:30 AM: 401 - Rough

2026-04-02 - 2026-MECH-0001436

01:00 PM - 03:00 PM: 903 - Rough

2026-04-02 - 2026-MECH-0001437

01:00 PM - 03:00 PM: 903 - Rough

2026-04-02 - 2026-MECH-0001439

01:00 PM - 03:00 PM: 903 - Rough

2026-04-01 - 2026-MECH-0001436

01:00 PM - 03:00 PM: 903 - Rough

2026-04-01 - 2026-MECH-0001437

01:00 PM - 03:00 PM: 903 - Rough

2026-04-01 - 2026-MECH-0001439

01:00 PM - 03:00 PM: 903 - Rough

2026-04-01 - 2026-MECH-0001440

01:00 PM - 03:00 PM: 903 - Rough

2026-03-27 - 2025-RESCON-0000017

09:00 AM - 11:00 AM: 107 - Drywall

2026-03-27 - 2025-RESCON-0000018

09:00 AM - 11:00 AM: 107 - Drywall

2026-03-27 - 2025-RESCON-0000019

09:00 AM - 11:00 AM: 107 - Drywall

2026-03-27 - 2025-RESCON-0000020

09:00 AM - 11:00 AM: 107 - Drywall

2026-03-24 - 2025-RESCON-0000008

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-24 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-24 - 2025-RESCON-0000017

08:30 AM - 05:30 PM: 106 - Batt Insulation

2026-03-24 - 2025-RESCON-0000018

08:30 AM - 05:30 PM: 106 - Batt Insulation

2026-03-24 - 2025-RESCON-0000019

08:30 AM - 05:30 PM: 106 - Batt Insulation

2026-03-24 - 2025-RESCON-0000020

08:30 AM - 05:30 PM: 106 - Batt Insulation

2026-03-24 - 2026-ROOFSIDE-0001203

11:00 AM - 01:00 PM: 206 - Other

2026-03-24 - 2026-ROOFSIDE-0001204

11:00 AM - 01:00 PM: 206 - Other

2026-03-24 - 2026-ROOFSIDE-0001205

11:00 AM - 01:00 PM: 206 - Other

2026-03-24 - 2026-ROOFSIDE-0001206

11:00 AM - 01:00 PM: 206 - Other

2026-03-24 - 2026-ROOFSIDE-0001207

11:00 AM - 01:00 PM: 206 - Other

2026-03-24 - 2026-ROOFSIDE-0001209

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2025-RESCON-0000008

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-23 - 2025-RESCON-0000009

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-23 - 2025-RESCON-0000017

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-03-23 - 2025-RESCON-0000018

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-03-23 - 2025-RESCON-0000019

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-03-23 - 2025-RESCON-0000020

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-03-23 - 2026-ROOFSIDE-0001203

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2026-ROOFSIDE-0001204

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2026-ROOFSIDE-0001205

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2026-ROOFSIDE-0001206

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2026-ROOFSIDE-0001207

11:00 AM - 01:00 PM: 206 - Other

2026-03-23 - 2026-ROOFSIDE-0001209

11:00 AM - 01:00 PM: 206 - Other

2026-03-20 - 2025-RESCON-0000017

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-20 - 2025-RESCON-0000018

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-20 - 2025-RESCON-0000019

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-20 - 2025-RESCON-0000020

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-03-11 - 2025-PLUMB-0010534

08:30 AM - 11:30 AM: 401 - Rough

2026-03-11 - 2025-PLUMB-0010535

08:30 AM - 11:30 AM: 401 - Rough

2026-03-11 - 2025-PLUMB-0010536

08:30 AM - 11:30 AM: 401 - Rough

2026-03-11 - 2025-PLUMB-0010537

08:30 AM - 11:30 AM: 401 - Rough

2026-02-18 - 2025-RESCON-0000005

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-18 - 2025-RESCON-0000006

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-18 - 2023-RESCON-0004176

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-17 - 2023-RESCON-0004176

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-17 - 2025-RESCON-0000005

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-17 - 2025-RESCON-0000006

11:00 AM - 01:00 PM: 107 - Drywall

2026-02-13 - 2023-RESCON-0004176

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-02-13 - 2025-RESCON-0000005

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-02-13 - 2025-RESCON-0000006

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 112 - Frame

2026-02-10 - 2023-RESCON-0004176

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

10:00 AM - 12:00 PM: 109 - Other

2026-02-10 - 2025-RESCON-0000005

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

10:00 AM - 12:00 PM: 109 - Other

2026-02-10 - 2025-RESCON-0000006

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

10:00 AM - 12:00 PM: 109 - Other

2026-02-07 - 2023-RESCON-0004176

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-07 - 2025-RESCON-0000005

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-07 - 2025-RESCON-0000006

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-06 - 2023-RESCON-0004176

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-06 - 2025-RESCON-0000005

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-06 - 2025-RESCON-0000006

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-02-05 - 2025-RESCON-0000019

11:00 AM - 01:00 PM: 116 - Building Slab

2026-02-05 - 2025-RESCON-0000020

11:00 AM - 01:00 PM: 116 - Building Slab

2026-02-05 - 2025-RESCON-0000017

11:00 AM - 01:00 PM: 116 - Building Slab

2026-02-05 - 2025-RESCON-0000018

11:00 AM - 01:00 PM: 116 - Building Slab

2026-02-04 - 2026-ROOFSIDE-0000475

11:00 AM - 01:00 PM: 206 - Other

2026-02-04 - 2026-ROOFSIDE-0000476

11:00 AM - 01:00 PM: 206 - Other

2026-02-04 - 2026-ROOFSIDE-0000477

11:00 AM - 01:00 PM: 206 - Other

2026-02-04 - 2026-ROOFSIDE-0000478

11:00 AM - 01:00 PM: 206 - Other

2026-01-21 - 2025-RESCON-0000017

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-21 - 2025-RESCON-0000018

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-21 - 2025-RESCON-0000019

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-21 - 2025-RESCON-0000020

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-20 - 2025-RESCON-0000017

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-20 - 2025-RESCON-0000018

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-20 - 2025-RESCON-0000019

11:00 AM - 01:00 PM: 116 - Building Slab

2026-01-20 - 2025-RESCON-0000020

11:00 AM - 01:00 PM: 116 - Building Slab

2691 N Krameria St

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0000676

10:00 AM - 01:00 PM: 106 - Batt Insulation

2026-05-14 - 2025-RESCON-0000676

10:00 AM - 12:00 PM: Document Review

2026-05-13 - 2025-RESCON-0000676

12:00 PM - 02:00 PM: Document Review

12:00 PM - 02:00 PM: 112 - Frame

2026-05-12 - 2025-RESCON-0000676

10:00 AM - 01:00 PM: 112 - Frame

2026-01-20 - 2025-ELEC-0002343

10:00 AM - 12:00 PM: 303 - Full Rough

6705 E Layton AVE

Directions

Recent Inspections

2026-06-13 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 112 - Frame

2026-06-12 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-12 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-06-12 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-11 - 2026-FIRE-0000859

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-11 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-06-11 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-11 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-10 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-06-10 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-10 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-09 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-06-09 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-09 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-08 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-08 - 2025-COMMCON-0000796

09:00 AM - 09:30 AM: 106 - Batt Insulation

09:00 AM - 09:30 AM: 107 - Drywall

09:00 AM - 09:30 AM: 112 - Frame

2026-06-08 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-08 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-06-04 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-03 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-06-03 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-02 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-06-02 - 2025-COMMCON-0000796

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-06-02 - 2025-ELEC-0009877

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-06-01 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-06-01 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 303 - Full Rough

2026-06-01 - 2025-FIRE-0006782

TBD: 302 - Partial Rough

2026-05-28 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-05-28 - 2025-PLUMB-0001152

08:30 AM - 11:30 AM: 401 - Rough

2026-05-28 - 2025-MECH-0007069

08:30 AM - 09:30 AM: 903 - Rough

2026-05-27 - 2025-ELEC-0009877

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-05-27 - 2025-FIRE-0006782

TBD: 302 - Partial Rough

2026-05-27 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-05-26 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-26 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-21 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-21 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-20 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-19 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-19 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-18 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-18 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-05-18 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-15 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-15 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-14 - 2025-COMMCON-0000796

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-05-14 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-14 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-13 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-13 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-12 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-12 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-12 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-11 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-11 - 2025-COMMCON-0000796

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-05-11 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-08 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-08 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-07 - 2025-ELEC-0009877

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-05-07 - 2025-FIRE-0006782

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-05-06 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-06 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-05 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-05-05 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-04 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-05-02 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-05-01 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-05-01 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-05-01 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-30 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-30 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-30 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-29 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 112 - Frame

2026-04-29 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-29 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 404 - Water Service

2026-04-29 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-28 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-28 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-04-27 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-24 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-24 - 2025-ELEC-0009877

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-04-22 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-04-22 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-04-21 - 2025-COMMCON-0000796

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-04-14 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-04-13 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-04-13 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-04-13 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-13 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-04-13 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-04-10 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-10 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-04-10 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-04-09 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-07 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-04-07 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-04-07 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-04-06 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-04-02 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-04-01 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-31 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-03-31 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-03-31 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 903 - Rough

2026-03-31 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-03-27 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-03-27 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-27 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-26 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-26 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-03-25 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-25 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-23 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-03-23 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-03-20 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-03-20 - 2025-ELEC-0005596

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-20 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-19 - 2025-ELEC-0009160

12:00 PM - 02:00 PM: 300 - Slab

2026-03-19 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-03-19 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 404 - Water Service

2026-03-18 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-03-17 - 2025-COMMCON-0000796

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-03-13 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 404 - Water Service

2026-03-11 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-03-10 - 2025-ELEC-0009160

01:00 PM - 03:00 PM: 300 - Slab

2026-03-09 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-03-09 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-03-06 - 2025-COMMCON-0000796

08:00 AM - 11:00 AM: 106 - Batt Insulation

08:00 AM - 11:00 AM: 107 - Drywall

08:00 AM - 11:00 AM: 112 - Frame

2026-03-05 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-02-27 - 2025-COMMCON-0000796

09:00 AM - 09:30 AM: 106 - Batt Insulation

09:00 AM - 09:30 AM: 107 - Drywall

09:00 AM - 09:30 AM: 112 - Frame

2026-02-27 - 2025-ELEC-0009160

12:00 PM - 02:00 PM: 300 - Slab

2026-02-27 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-02-26 - 2025-PLUMB-0001152

08:00 AM - 10:00 AM: 404 - Water Service

2026-02-26 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-02-25 - 2025-MECH-0007065

08:30 AM - 09:30 AM: 903 - Rough

2026-02-24 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-02-20 - 2025-MECH-0007069

11:00 AM - 01:00 PM: 902 - Partial Rough

2026-02-19 - 2025-ELEC-0009160

12:00 PM - 02:00 PM: 300 - Slab

2026-02-18 - 2025-FIRE-0004657

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-02-18 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-02-17 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-02-13 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-02-12 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-02-12 - 2025-ELEC-0009877

10:00 AM - 12:00 PM: 300 - Slab

2026-02-10 - 2025-FIRE-0004657

08:30 AM - 11:30 AM: 412 - Final - Fire Suppression

2026-02-10 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-02-10 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-02-09 - 2025-COMMCON-0000200

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

2026-02-09 - 2025-ELEC-0009160

01:00 PM - 03:00 PM: 300 - Slab

2026-02-09 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-02-05 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-02-05 - 2025-ELEC-0009960

TBD: 305 - Final - Electrical

2026-02-04 - 2025-COMMCON-0000796

11:00 AM - 01:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-02-04 - 2025-ELEC-0009160

01:00 PM - 03:00 PM: 300 - Slab

2026-02-04 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-02-02 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-02-02 - 2025-ELEC-0009160

12:00 PM - 02:00 PM: 300 - Slab

2026-02-02 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-01-29 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-01-29 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 300 - Slab

2026-01-28 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 300 - Slab

2026-01-26 - 2025-ELEC-0009160

10:00 AM - 12:00 PM: 300 - Slab

2026-01-21 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-01-20 - 2025-ELEC-0009877

09:00 AM - 11:00 AM: 300 - Slab

4537 N Utica ST

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0001979

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-06-09 - 2025-RESCON-0001979

09:00 AM - 11:00 AM: 112 - Frame

2026-06-04 - 2026-ELEC-0004125

11:00 AM - 01:00 PM: 303 - Full Rough

2026-04-17 - 2025-RESCON-0001979

09:00 AM - 11:00 AM: 105 - Exterior Sheathing

2026-02-13 - 2025-RESCON-0001979

09:00 AM - 11:00 AM: 109 - Other

2026-01-20 - 2025-RESCON-0001979

09:00 AM - 11:00 AM: 100 - Footing

11100 E 51st AVE

Directions

Recent Inspections

2026-06-13 - 2025-PLUMB-0007261

10:30 AM - 12:30 PM: 401 - Rough

2026-06-12 - 2025-PLUMB-0007261

10:30 AM - 12:30 PM: 401 - Rough

2026-06-11 - 2025-ELEC-0007175

08:00 AM - 10:00 AM: 305 - Final - Electrical

2026-06-11 - 2026-PLUMB-0004346

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-06-11 - 2026-ELEC-0003779

TBD: 304 - Partial Final

2026-06-09 - 2026-FIRE-0001442

10:30 AM - 12:30 PM: 411 - Rough

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-05-15 - 2026-ELEC-0003902

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-05-15 - 2026-FIRE-0002426

01:00 PM - 03:00 PM: 303 - Full Rough

2026-05-14 - 2026-FIRE-0002426

01:00 PM - 03:00 PM: 303 - Full Rough

2026-05-14 - 2026-ELEC-0003902

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-05-08 - 2025-COMMCON-0001420

09:00 AM - 12:00 PM: 107 - Drywall

2026-05-06 - 2025-ELEC-0007175

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-03-05 - 2025-FIRE-0006472

08:00 AM - 12:00 PM: 412 - Final - Fire Suppression

2026-03-04 - 2025-FIRE-0006472

08:30 AM - 05:30 PM: 412 - Final - Fire Suppression

2026-03-03 - 2025-COMMCON-0001420

01:00 PM - 03:00 PM: 108 - Final - Commercial

2026-03-03 - 2025-ELEC-0007175

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-03-02 - 2025-COMMCON-0001420

09:00 AM - 12:00 PM: 108 - Final - Commercial

2026-03-02 - 2025-ELEC-0007175

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-02-26 - 2025-COMMCON-0001420

09:00 AM - 11:00 AM: 109 - Other

2026-02-26 - 2025-ELEC-0007175

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-02-25 - 2025-ELEC-0007175

12:00 PM - 02:00 PM: 305 - Final - Electrical

- TBD: 307 - Service Equipment

2026-02-09 - 2025-ELEC-0007175

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-02-06 - 2025-MECH-0005314

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-01-28 - 2025-ELEC-0007175

12:00 PM - 02:00 PM: 304 - Partial Final

2026-01-28 - 2025-MECH-0005314

11:00 AM - 01:00 PM: 903 - Rough

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-01-16 - 2025-FIRE-0006472

12:15 PM - 03:00 PM: 411 - Rough

3265 S Bellaire ST

Directions

Recent Inspections

2026-06-12 - 2026-MECH-0003542

11:00 AM - 01:00 PM: 903 - Rough

2026-06-11 - 2026-MECH-0003361

11:00 AM - 01:00 PM: 903 - Rough

2026-06-09 - 2024-RESCON-0003944

01:00 PM - 03:00 PM: 112 - Frame

2026-06-08 - 2026-BOILERAC-0000410

11:00 AM - 01:00 PM: 703 - Rough

2026-06-08 - 2026-MECH-0003361

11:00 AM - 01:00 PM: 903 - Rough

2026-06-03 - 2026-PLUMB-0000534

08:30 AM - 11:30 AM: 401 - Rough

2026-05-28 - 2026-PLUMB-0004483

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-05-14 - 2026-ELEC-0004053

10:00 AM - 12:00 PM: 303 - Full Rough

2026-05-11 - 2026-ELEC-0004053

10:00 AM - 12:00 PM: 303 - Full Rough

2026-05-07 - 2024-RESCON-0003944

08:30 AM - 05:30 PM: 109 - Other

2026-05-06 - 2024-RESCON-0003944

11:00 AM - 01:00 PM: 109 - Other

2026-04-30 - 2026-PLUMB-0000534

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-04-24 - 2024-RESCON-0003944

01:00 PM - 03:00 PM: 100 - Footing

01:00 PM - 03:00 PM: 101 - Foundation Wall

2026-01-16 - 2026-PLUMB-0000534

08:30 AM - 12:00 PM: 401 - Rough

08:30 AM - 12:00 PM: 402 - Final - Plumbing

3 N Albion ST

Directions

Recent Inspections

2026-06-12 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 107 - Drywall

2026-06-05 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 109 - Other

2026-06-04 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-06-01 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 112 - Frame

2026-05-29 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 109 - Other

09:00 AM - 11:00 AM: 112 - Frame

2026-05-28 - 2026-ELEC-0004425

10:00 AM - 12:00 PM: 303 - Full Rough

10:00 AM - 12:00 PM: 307 - Service Equipment

10:00 AM - 12:00 PM: 313 - Meter Release

2026-05-19 - 2026-PLUMB-0001287

10:00 AM - 12:00 PM: 401 - Rough

10:00 AM - 12:00 PM: 403 - Pressure Test

2026-05-18 - 2026-PLUMB-0001287

10:30 AM - 01:00 PM: 401 - Rough

10:30 AM - 01:00 PM: 403 - Pressure Test

2026-05-14 - 2026-PLUMB-0001287

08:01 AM - 10:00 AM: 401 - Rough

08:01 AM - 10:00 AM: 403 - Pressure Test

2026-04-21 - 2026-MECH-0002426

12:00 PM - 02:00 PM: 903 - Rough

2026-03-31 - 2025-RESCON-0003077

09:00 AM - 11:00 AM: 101 - Foundation Wall

09:00 AM - 11:00 AM: 102 - Foundation Perimeter Drain

2026-02-19 - 2025-RESCON-0003077

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

2026-02-17 - 2026-PLUMB-0001287

10:30 AM - 01:00 PM: 400 - Groundwork

2026-01-16 - 2026-ELEC-0000323

08:00 AM - 10:00 AM: 311 - Temporary Service

1594 S Acoma ST

Directions

Recent Inspections

2026-06-12 - 2025-ELEC-0010396

12:00 PM - 02:00 PM: 305 - Final - Electrical

2026-06-12 - 2025-MECH-0007182

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-05-21 - 2025-ELEC-0010396

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

2026-05-21 - 2026-LOG-0004757

11:00 AM - 01:00 PM: 307 - Service Equipment

2026-05-20 - 2025-ELEC-0010396

01:00 PM - 03:00 PM: 307 - Service Equipment

2026-05-07 - 2025-ELEC-0010396

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-04-10 - 2025-ELEC-0010396

08:00 AM - 10:00 AM: 307 - Service Equipment

08:00 AM - 10:00 AM: 308 - Ceiling

2026-04-08 - 2025-MECH-0007182

01:00 PM - 03:00 PM: 903 - Rough

2026-04-07 - 2025-MECH-0007182

08:30 AM - 09:30 AM: 903 - Rough

2026-03-19 - 2025-PLUMB-0009657

08:00 AM - 10:00 AM: 402 - Final - Plumbing

2026-02-05 - 2025-ELEC-0010396

10:00 AM - 12:00 PM: 303 - Full Rough

2026-02-03 - 2025-ELEC-0010396

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-01-30 - 2025-ELEC-0006454

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-01-16 - 2025-PLUMB-0009657

08:00 AM - 10:00 AM: 401 - Rough