1274 N Hudson ST
Recent Inspections
2026-06-12 - 2026-PLUMB-0002857
10:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-06-11 - 2026-ELEC-0002699
TBD: 305 - Final - Electrical
2026-06-11 - 2026-ELEC-0002604
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-10 - 2026-ELEC-0002604
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-10 - 2026-ELEC-0002699
TBD: 305 - Final - Electrical
2026-06-08 - 2026-MECH-0002192
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-04-23 - 2026-RESCON-0000251
10:00 AM - 01:00 PM: Document Review
10:00 AM - 01:00 PM: 107 - Drywall
2026-04-20 - 2026-RESCON-0000251
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-04-17 - 2026-ELEC-0002604
12:00 PM - 02:00 PM: 301 - Underground
12:00 PM - 02:00 PM: 307 - Service Equipment
12:00 PM - 02:00 PM: 313 - Meter Release
2026-04-15 - 2026-RESCON-0000251
01:00 PM - 03:00 PM: 112 - Frame
2026-04-10 - 2026-ELEC-0002604
11:00 AM - 01:00 PM: 303 - Full Rough
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-04-10 - 2026-MECH-0002192
12:00 PM - 02:00 PM: 903 - Rough
2026-04-02 - 2026-PLUMB-0002857
10:00 AM - 12:00 PM: 400 - Groundwork
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 403 - Pressure Test
12:00 PM - 03:00 PM: 405 - Meter Release
2026-03-31 - 2026-ELEC-0002604
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-01-28 - 2026-RESCON-0000251
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
3850 Blake ST
Recent Inspections
2026-06-12 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-11 - 2025-FIRE-0007661
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-06-11 - 2026-FIRE-0000576
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-06-11 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-11 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-06-11 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-06-10 - 2026-COMMCON-0001119
TBD: 113 - Pre Construction Meeting
2026-06-10 - 2026-FIRE-0000576
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-10 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-10 - 2024-ELEC-0000459
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-09 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-06-09 - 2024-MECH-0003621
11:00 AM - 01:00 PM: 903 - Rough
2026-06-09 - 2024-PLUMB-0006021
12:00 PM - 03:00 PM: 401 - Rough
2026-06-08 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-05 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-04 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-06-03 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-02 - 2025-FIRE-0006997
08:00 AM - 10:00 AM: 411 - Rough
2026-06-02 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-06-02 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-06-01 - 2026-FIRE-0000576
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-06-01 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-01 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-06-01 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-05-29 - 2025-FIRE-0006997
12:00 PM - 03:00 PM: 411 - Rough
2026-05-29 - 2026-FIRE-0000576
08:00 AM - 10:30 AM: 302 - Partial Rough
2026-05-29 - 2023-COMMCON-0002150
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-29 - 2024-ELEC-0000459
08:00 AM - 10:30 AM: 302 - Partial Rough
2026-05-29 - 2024-PLUMB-0006021
12:00 PM - 03:00 PM: 401 - Rough
2026-05-28 - 2023-COMMCON-0002150
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-05-28 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-05-27 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-27 - 2024-PLUMB-0006021
08:00 AM - 12:00 PM: 401 - Rough
2026-05-26 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-22 - 2023-COMMCON-0002150
12:00 PM - 02:00 PM: 107 - Drywall
2026-05-21 - 2026-FIRE-0000576
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-21 - 2023-COMMCON-0002150
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-05-21 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-20 - 2025-FIRE-0006934
08:30 AM - 05:30 PM: 411 - Rough
2026-05-20 - 2026-FIRE-0000576
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-20 - 2023-COMMCON-0002150
10:30 AM - 12:30 PM: 106 - Batt Insulation
10:30 AM - 12:30 PM: 107 - Drywall
12:30 PM - 02:30 PM: 112 - Frame
2026-05-20 - 2024-ELEC-0000459
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-20 - 2024-MECH-0003621
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-19 - 2024-PLUMB-0006021
08:00 AM - 10:01 AM: 401 - Rough
2026-05-18 - 2026-FIRE-0000576
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-05-18 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-18 - 2024-ELEC-0000459
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-05-18 - 2024-MECH-0003621
09:00 AM - 11:00 AM: 903 - Rough
2026-05-16 - 2025-FIRE-0006934
08:30 AM - 05:30 PM: 411 - Rough
2026-05-15 - 2023-COMMCON-0002150
TBD: 107 - Drywall
TBD: 112 - Frame
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 109 - Other
2026-05-15 - 2025-FIRE-0006934
08:30 AM - 05:30 PM: 411 - Rough
2026-05-15 - 2026-FIRE-0000576
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-15 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-14 - 2026-FIRE-0000576
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-14 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
TBD: 107 - Drywall
TBD: 112 - Frame
2026-05-14 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-13 - 2026-FIRE-0000576
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-13 - 2023-COMMCON-0002150
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-05-13 - 2024-ELEC-0000459
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-13 - 2024-MECH-0003621
11:00 AM - 01:00 PM: 903 - Rough
2026-05-12 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-11 - 2026-FIRE-0000576
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-05-11 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-05-11 - 2024-ELEC-0000459
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-05-09 - 2025-FIRE-0006934
09:00 AM - 11:00 AM: 411 - Rough
2026-05-08 - 2025-FIRE-0006934
09:00 AM - 11:00 AM: 411 - Rough
2026-05-08 - 2024-MECH-0003621
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-08 - 2024-PLUMB-0006021
09:00 AM - 11:00 AM: 401 - Rough
2026-05-05 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-05-04 - 2025-FIRE-0006997
12:00 PM - 03:00 PM: 411 - Rough
2026-05-04 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-05-01 - 2023-COMMCON-0002150
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-05-01 - 2024-MECH-0003621
11:00 AM - 01:00 PM: 903 - Rough
2026-04-29 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-04-28 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-04-28 - 2024-PLUMB-0006021
10:00 AM - 12:00 PM: 401 - Rough
2026-04-27 - 2023-COMMCON-0002150
11:00 AM - 02:00 PM: 106 - Batt Insulation
2026-04-24 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-24 - 2024-MECH-0003621
09:00 AM - 11:00 AM: 903 - Rough
2026-04-23 - 2025-FIRE-0006934
12:00 PM - 03:00 PM: 411 - Rough
2026-04-23 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 112 - Frame
2026-04-23 - 2024-PLUMB-0006021
12:00 PM - 03:00 PM: 401 - Rough
2026-04-22 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-04-21 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-20 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-04-17 - 2023-COMMCON-0002150
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-17 - 2024-MECH-0003621
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-04-15 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-04-15 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-04-14 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-13 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-10 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-10 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-04-09 - 2023-COMMCON-0002150
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-04-09 - 2024-PLUMB-0006021
08:00 AM - 10:00 AM: 401 - Rough
2026-04-08 - 2023-COMMCON-0002150
01:00 PM - 03:00 PM: 107 - Drywall
2026-04-07 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-06 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-04-01 - 2023-COMMCON-0002150
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-17 - 2024-MECH-0003621
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-03-13 - 2024-ELEC-0000459
11:30 AM - 02:30 PM: 300 - Slab
2026-03-12 - 2023-COMMCON-0002150
01:00 PM - 03:00 PM: 112 - Frame
2026-02-20 - 2024-ELEC-0000459
08:00 AM - 10:00 AM: 113 - Pre Construction Meeting
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-19 - 2024-ELEC-0000459
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-02-06 - 2024-ELEC-0000459
10:00 AM - 12:30 PM: 300 - Slab
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-02-02 - 2024-ELEC-0000459
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-01-26 - 2024-ELEC-0000459
10:00 AM - 12:30 PM: 300 - Slab
10:00 AM - 12:30 PM: 302 - Partial Rough
1780 S Bellaire ST
Recent Inspections
2026-06-12 - 2026-MECH-0002735
09:00 AM - 11:00 AM: 903 - Rough
2026-06-05 - 2026-ELEC-0004061
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-01 - 2026-FIRE-0002769
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-01 - 2026-FIRE-0002845
11:00 AM - 01:00 PM: 411 - Rough
2026-06-01 - 2026-ELEC-0004061
11:00 AM - 01:00 PM: 308 - Ceiling
2026-05-14 - 2026-COMMCON-0000850
09:00 AM - 11:00 AM: 107 - Drywall
2026-05-12 - 2026-COMMCON-0000850
11:00 AM - 01:00 PM: 112 - Frame
2026-05-11 - 2026-ELEC-0004061
08:00 AM - 10:00 AM: 309 - Walls
2026-05-11 - 2026-PLUMB-0003890
08:30 AM - 11:30 AM: 401 - Rough
2026-04-22 - 2025-COMMCON-0002001
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-04-02 - 2025-COMMCON-0002001
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-04-02 - 2026-COMMCON-0000009
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-01-29 - 2026-COMMCON-0000009
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-01-29 - 2026-ELEC-0000723
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-01-28 - 2025-COMMCON-0002001
09:00 AM - 11:00 AM: 112 - Frame
2026-01-27 - 2026-ELEC-0000723
11:00 AM - 02:00 PM: 305 - Final - Electrical
2026-01-26 - 2025-COMMCON-0002001
09:00 AM - 11:00 AM: 112 - Frame
439 N Newton ST
Recent Inspections
2026-06-12 - 2025-RESCON-0003461
11:00 AM - 01:00 PM: 112 - Frame
2026-06-09 - 2026-ELEC-0005053
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-05 - 2026-MECH-0003299
01:00 PM - 03:00 PM: 903 - Rough
2026-06-04 - 2026-MECH-0003299
01:00 PM - 03:00 PM: 903 - Rough
2026-06-03 - 2026-PLUMB-0002480
11:00 AM - 01:00 PM: 401 - Rough
2026-05-29 - 2026-ROOFSIDE-0002295
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-05-20 - 2025-RESCON-0003461
09:00 AM - 11:00 AM: 103 - Waterproofing
09:00 AM - 11:00 AM: 107 - Drywall
TBD: 109 - Other
2026-05-15 - 2026-ROOFSIDE-0002295
09:00 AM - 11:00 AM: 206 - Other
2026-05-06 - 2025-RESCON-0003461
TBD: Document Review
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
2026-05-05 - 2025-RESCON-0003461
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
2026-04-08 - 2025-RESCON-0003461
TBD: Document Review
2026-04-07 - 2025-RESCON-0003461
10:00 AM - 12:00 PM: 109 - Other
2026-04-02 - 2025-RESCON-0003461
10:00 AM - 12:00 PM: 116 - Building Slab
2026-03-31 - 2025-RESCON-0003461
TBD: Document Review
08:30 AM - 05:30 PM: 109 - Other
2026-03-26 - 2025-RESCON-0003461
08:00 AM - 10:00 AM: 100 - Footing
2026-03-23 - 2026-PLUMB-0002480
08:30 AM - 09:30 AM: 400 - Groundwork
2026-03-12 - 2025-RESCON-0003461
11:00 AM - 01:00 PM: 104 - Frost Wall Insulation
11:00 AM - 01:00 PM: 109 - Other
2026-03-09 - 2025-RESCON-0003461
10:00 AM - 12:00 PM: 104 - Frost Wall Insulation
2026-03-06 - 2025-RESCON-0003461
08:30 AM - 05:30 PM: 103 - Waterproofing
2026-03-05 - 2025-RESCON-0003461
10:00 AM - 12:00 PM: 104 - Frost Wall Insulation
2026-02-27 - 2025-RESCON-0003461
08:30 AM - 05:30 PM: 101 - Foundation Wall
2026-02-26 - 2025-RESCON-0003461
12:00 PM - 02:00 PM: 109 - Other
2026-02-24 - 2025-RESCON-0003461
01:00 PM - 03:00 PM: 101 - Foundation Wall
2026-02-20 - 2025-RESCON-0003461
TBD: Document Review
10:00 AM - 12:00 PM: 109 - Other
2026-02-17 - 2025-RESCON-0003461
09:00 AM - 11:00 AM: 100 - Footing
2026-01-30 - 2025-RESCON-0003461
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-01-23 - 2025-RESCON-0003461
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
1437 N Bannock ST
Recent Inspections
2026-06-12 - 2025-COMMCON-0000309
10:30 AM - 12:00 PM: 108 - Final - Commercial
2026-06-03 - 2025-COMMCON-0000309
09:30 AM - 11:00 AM: 108 - Final - Commercial
2026-06-03 - 2025-COMMCON-0001483
TBD: 108 - Final - Commercial
2026-05-27 - 2026-ELEC-0000897
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-05-19 - 2026-ELEC-0000897
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-05-04 - 2026-ELEC-0000897
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-17 - 2025-COMMCON-0000309
08:30 AM - 10:30 AM: 109 - Other
TBD: 112 - Frame
2026-03-31 - 2026-ELEC-0000897
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-03-26 - 2026-ELEC-0000897
08:30 AM - 11:00 AM: 302 - Partial Rough
2026-03-05 - 2025-COMMCON-0000309
11:00 AM - 01:00 PM: Document Review Inspection
2026-03-04 - 2025-COMMCON-0000309
TBD: Document Review Inspection
2026-02-27 - 2026-ELEC-0000897
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-26 - 2025-COMMCON-0000309
TBD: Document Review Inspection
12:00 PM - 02:00 PM: 109 - Other
2026-02-17 - 2024-ACCCON-0000584
TBD: 305 - Final - Access Control
2026-01-23 - 2025-COMMCON-0000309
09:00 AM - 11:00 AM: 112 - Frame
230 S Hudson ST
Recent Inspections
2026-06-12 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 109 - Other
2026-06-11 - 2025-RESCON-0001222
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-06-08 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-06-05 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 112 - Frame
2026-06-04 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 112 - Frame
2026-06-04 - 2026-ROOFSIDE-0002617
09:00 AM - 11:00 AM: 206 - Other
2026-06-03 - 2026-ELEC-0004817
11:00 AM - 01:00 PM: 303 - Full Rough
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-06-03 - 2026-MECH-0003290
10:00 AM - 12:00 PM: 903 - Rough
2026-06-02 - 2026-MECH-0003195
01:00 PM - 03:00 PM: 903 - Rough
2026-06-01 - 2026-MECH-0003195
08:30 AM - 09:30 AM: 903 - Rough
2026-05-29 - 2026-MECH-0003195
10:00 AM - 12:00 PM: 903 - Rough
2026-05-22 - 2026-PLUMB-0002405
11:00 AM - 01:00 PM: 401 - Rough
2026-05-15 - 2026-PLUMB-0002405
10:00 AM - 12:00 PM: 401 - Rough
2026-04-30 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
09:00 AM - 11:00 AM: 109 - Other
2026-03-26 - 2025-RESCON-0001222
10:00 AM - 12:00 PM: 109 - Other
2026-03-20 - 2026-PLUMB-0002405
10:00 AM - 12:00 PM: 400 - Groundwork
2026-03-13 - 2025-RESCON-0001222
09:00 AM - 11:00 AM: 109 - Other
2026-03-10 - 2025-RESCON-0001222
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-02-24 - 2025-RESCON-0001221
10:00 AM - 12:00 PM: 108 - Final - Residential
10:00 AM - 12:00 PM: 109 - Other
2026-02-23 - 2025-RESCON-0001221
10:00 AM - 12:00 PM: 109 - Other
2026-02-20 - 2025-RESCON-0001221
11:00 AM - 01:00 PM: 108 - Final - Residential
2026-01-27 - 2025-RESCON-0001221
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-01-23 - 2025-RESCON-0001221
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
1945 S High ST
Recent Inspections
2026-06-12 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 108 - Final - Residential
2026-06-01 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 108 - Final - Residential
01:00 PM - 03:00 PM: 109 - Other
2026-05-29 - 2024-RESCON-0001811
08:30 AM - 05:30 PM: 108 - Final - Residential
08:30 AM - 05:30 PM: 109 - Other
2026-05-28 - 2025-PLUMB-0010560
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-05-28 - 2025-PLUMB-0010562
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-05-27 - 2026-MECH-0000600
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-05-23 - 2026-ELEC-0000925
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-22 - 2026-ELEC-0000925
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-22 - 2026-ELEC-0001269
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-13 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-27 - 2026-ROOFSIDE-0001378
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-04-27 - 2026-ROOFSIDE-0001380
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-04-07 - 2026-ROOFSIDE-0001378
11:00 AM - 01:00 PM: 206 - Other
2026-03-05 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-03-04 - 2024-RESCON-0001811
08:30 AM - 05:30 PM: 107 - Drywall
08:30 AM - 05:30 PM: 112 - Frame
2026-03-03 - 2024-RESCON-0001811
08:30 AM - 05:30 PM: 107 - Drywall
08:30 AM - 05:30 PM: 112 - Frame
2026-03-02 - 2026-ELEC-0000925
12:30 PM - 03:00 PM: 307 - Service Equipment
2026-03-02 - 2026-ELEC-0001269
12:30 PM - 03:00 PM: 307 - Service Equipment
12:30 PM - 03:00 PM: 313 - Meter Release
2026-02-27 - 2026-ELEC-0001269
12:30 PM - 03:00 PM: 303 - Full Rough
12:30 PM - 03:00 PM: 307 - Service Equipment
12:30 PM - 03:00 PM: 313 - Meter Release
2026-02-26 - 2024-RESCON-0001811
01:00 PM - 03:00 PM: 109 - Other
2026-02-25 - 2024-RESCON-0001811
01:00 PM - 03:00 PM: 109 - Other
2026-02-24 - 2024-RESCON-0001811
08:30 AM - 05:30 PM: 105 - Exterior Sheathing
2026-02-18 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-02-17 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-02-13 - 2026-ELEC-0000925
12:30 PM - 02:30 PM: 301 - Underground
2026-02-12 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 112 - Frame
- TBD: 111 - Exterior Lath
2026-02-10 - 2024-RESCON-0001811
10:00 AM - 12:00 PM: 112 - Frame
2026-02-09 - 2024-RESCON-0001811
11:00 AM - 01:00 PM: 109 - Other
2026-02-06 - 2024-RESCON-0001811
08:30 AM - 05:30 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-02-05 - 2026-ELEC-0000925
12:30 PM - 02:30 PM: 303 - Full Rough
2026-02-02 - 2026-MECH-0000600
01:00 PM - 03:00 PM: 903 - Rough
2026-01-23 - 2025-PLUMB-0010560
08:00 AM - 10:30 AM: 401 - Rough
10:30 AM - 12:30 PM: 403 - Pressure Test
10:30 AM - 12:30 PM: 405 - Meter Release
2026-01-23 - 2025-PLUMB-0010562
08:00 AM - 10:30 AM: 401 - Rough
08:00 AM - 10:30 AM: 403 - Pressure Test
08:00 AM - 10:30 AM: 405 - Meter Release
757 S Downing
Recent Inspections
2026-06-12 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-04-09 - 2024-RESCON-0003231
TBD: 109 - Other
2026-03-26 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 116 - Building Slab
2026-03-16 - 2024-RESCON-0003231
01:00 PM - 03:00 PM: 116 - Building Slab
2026-03-12 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 116 - Building Slab
2026-02-23 - 2024-RESCON-0003231
01:00 PM - 03:00 PM: 109 - Other
2026-02-19 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 109 - Other
2026-02-18 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 104 - Frost Wall Insulation
09:00 AM - 11:00 AM: 109 - Other
2026-02-13 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 103 - Waterproofing
- TBD: 109 - Other
2026-01-26 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-01-23 - 2024-RESCON-0003231
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
4249 N Rifle ST
Recent Inspections
2026-06-13 - 2025-PLUMB-0004823
08:00 AM - 10:30 AM: 400 - Groundwork
2026-06-12 - 2025-PLUMB-0004823
08:00 AM - 10:30 AM: 400 - Groundwork
2026-06-09 - 2024-COMMCON-0001140
01:30 PM - 03:00 PM: 109 - Other
2026-06-05 - 2025-ELEC-0003309
10:00 AM - 12:00 PM: 301 - Underground
2026-05-29 - 2026-PLUMB-0004156
10:15 AM - 12:30 PM: 400 - Groundwork
2026-05-28 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 301 - Underground
2026-05-22 - 2024-COMMCON-0001140
08:30 AM - 09:30 AM: 109 - Other
2026-05-21 - 2024-COMMCON-0001140
08:30 AM - 09:30 AM: 109 - Other
2026-05-20 - 2025-PLUMB-0004823
10:30 AM - 12:30 PM: 400 - Groundwork
2026-05-15 - 2026-PLUMB-0004156
08:00 AM - 10:30 AM: 401 - Rough
2026-05-13 - 2024-COMMCON-0001140
01:15 PM - 03:00 PM: 109 - Other
2026-05-08 - 2025-PLUMB-0004823
08:00 AM - 11:00 PM: 400 - Groundwork
2026-05-07 - 2024-COMMCON-0001140
10:00 AM - 12:30 PM: 109 - Other
2026-05-06 - 2025-PLUMB-0004823
11:00 AM - 01:30 PM: 400 - Groundwork
2026-05-01 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 301 - Underground
2026-04-27 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 109 - Other
2026-04-27 - 2025-ELEC-0003309
12:00 PM - 02:30 PM: 301 - Underground
2026-04-24 - 2025-ELEC-0003309
08:30 AM - 09:30 AM: 301 - Underground
2026-04-17 - 2025-PLUMB-0004823
10:00 AM - 02:00 PM: 400 - Groundwork
2026-04-15 - 2024-COMMCON-0001140
09:00 AM - 11:00 AM: 109 - Other
2026-04-08 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 312 - UFER
2026-02-10 - 2026-ELEC-0001115
12:30 PM - 02:30 PM: 305 - Final - Electrical
12:30 PM - 02:30 PM: 313 - Meter Release
12:30 PM - 02:30 PM: 311 - Temporary Service
2026-01-22 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
3590 W 21st AVE
Recent Inspections
2026-06-12 - 2025-MECH-0007533
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-06-10 - 2025-PLUMB-0010476
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-06-10 - 2026-ELEC-0000148
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-06-09 - 2025-MECH-0007533
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-02-04 - 2024-RESCON-0003264
08:30 AM - 05:30 PM: 107 - Drywall
2026-01-30 - 2024-RESCON-0003264
01:00 PM - 03:00 PM: 107 - Drywall
2026-01-22 - 2024-RESCON-0003264
11:00 AM - 01:00 PM: 106 - Batt Insulation