1734 S Grant ST
Recent Inspections
2026-09-11 - 2024-RESCON-0002494
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-09 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-31 - 2024-RESCON-0002494
01:00 PM - 03:00 PM: 109 - Other
2026-08-31 - 2026-ROOFSIDE-0001743
10:30 AM - 12:30 PM: 201 - Final - Roof
2026-08-31 - 2026-ROOFSIDE-0005085
10:30 AM - 12:30 PM: 201 - Final - Roof
2026-08-28 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-27 - 2026-ROOFSIDE-0001743
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-27 - 2026-ROOFSIDE-0001744
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-08-18 - 2024-RESCON-0002494
08:30 AM - 05:30 PM: 112 - Frame
2026-08-12 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 112 - Frame
2026-08-10 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 112 - Frame
2026-08-07 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 112 - Frame
2026-08-06 - 2026-ELEC-0006979
12:00 PM - 02:00 PM: 303 - Full Rough
2026-08-05 - 2025-ELEC-0010351
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-08-05 - 2026-ELEC-0006979
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-07-30 - 2025-ELEC-0010351
10:00 AM - 12:00 PM: 301 - Underground
2026-07-22 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-07-20 - 2024-RESCON-0002493
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-20 - 2024-RESCON-0002494
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-07-17 - 2024-RESCON-0002493
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-15 - 2024-RESCON-0002493
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-01 - 2026-MECH-0003989
01:00 PM - 03:00 PM: 903 - Rough
2026-06-30 - 2026-PLUMB-0003662
08:30 AM - 11:30 AM: 401 - Rough
2026-06-24 - 2024-RESCON-0002493
09:00 AM - 11:00 AM: 104 - Frost Wall Insulation
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-23 - 2024-RESCON-0002493
09:00 AM - 11:00 AM: 104 - Frost Wall Insulation
09:00 AM - 11:00 AM: 106 - Batt Insulation
TBD: 109 - Other
8107 E Belleview AVE
Recent Inspections
2026-09-11 - 2026-FIRE-0003743
08:30 AM - 11:30 AM: 411 - Rough
2026-09-11 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-11 - 2025-ELEC-0013764
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-10 - 2026-COMMCON-0000705
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-09-10 - 2026-ELEC-0004829
01:00 PM - 03:00 PM: 300 - Slab
2026-09-09 - 2026-BOILERAC-0000402
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-09-03 - 2025-FIRE-0005035
01:00 PM - 03:00 PM: 303 - Full Rough
2026-09-03 - 2025-ELEC-0006694
TBD: 303 - Full Rough
2026-09-02 - 2025-FIRE-0007075
08:30 AM - 11:30 AM: 411 - Rough
2026-08-28 - 2026-COMMCON-0000971
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-08-28 - 2026-MECH-0003177
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-11 - 2025-COMMCON-0001020
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-08-07 - 2026-COMMCON-0000705
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-08-07 - 2026-MECH-0003177
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-31 - 2025-COMMCON-0001020
TBD: Document Review Inspection
2026-07-31 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-31 - 2025-ELEC-0013764
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-29 - 2025-COMMCON-0001020
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-28 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-27 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-25 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-25 - 2026-FIRE-0003750
01:00 PM - 03:00 PM: 303 - Full Rough
2026-07-24 - 2026-FIRE-0003750
01:00 PM - 03:00 PM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0004321
08:30 AM - 09:30 AM: 301 - Underground
2026-07-24 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-22 - 2025-COMMCON-0001020
08:00 AM - 10:00 AM: Document Review Inspection
2026-07-22 - 2025-ELEC-0006694
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-07-22 - 2025-ELEC-0013764
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-07-22 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-07-21 - 2025-ELEC-0006694
TBD: 302 - Partial Rough
2026-07-21 - 2026-ELEC-0004628
TBD: 302 - Partial Rough
2026-07-17 - 2025-COMMCON-0001020
09:00 AM - 09:30 AM: 112 - Frame
2026-07-16 - 2025-COMMCON-0001020
TBD: Document Review Inspection
2026-07-16 - 2025-FIRE-0007075
10:00 AM - 12:00 PM: 411 - Rough
2026-07-15 - 2025-PLUMB-0004644
08:00 AM - 10:00 AM: 405 - Meter Release
2026-07-15 - 2026-PLUMB-0004513
08:00 AM - 10:00 AM: 403 - Pressure Test
2026-07-13 - 2026-COMMCON-0000740
11:00 AM - 01:00 PM: 112 - Frame
2026-07-10 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-07-10 - 2026-ELEC-0004628
11:00 AM - 01:00 PM: 309 - Walls
2026-07-10 - 2026-PLUMB-0004513
10:00 AM - 02:00 PM: 401 - Rough
2026-07-08 - 2026-ELEC-0004321
01:00 PM - 03:00 PM: 301 - Underground
2026-07-02 - 2026-FIRE-0001353
10:00 AM - 12:00 PM: 411 - Rough
2026-07-02 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 301 - Underground
2026-07-01 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-26 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 301 - Underground
2026-06-23 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-22 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-22 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 301 - Underground
1919 N Broadway
Recent Inspections
2026-09-11 - 2024-FIRE-0008256
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-10 - 2024-FIRE-0008256
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-02 - 2024-FIRE-0008256
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-27 - 2024-FIRE-0008256
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-26 - 2024-FIRE-0008256
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-17 - 2024-FIRE-0008256
09:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-12 - 2024-FIRE-0008256
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-11 - 2024-FIRE-0008256
10:00 AM - 12:00 PM: 303 - Full Rough
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-10 - 2024-FIRE-0008256
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-06 - 2024-FIRE-0008256
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-08 - 2024-FIRE-0008256
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-07 - 2024-FIRE-0008256
08:00 AM - 10:00 AM: 302 - Partial Rough
2151 S Humboldt ST
Recent Inspections
2026-09-11 - 2026-MECH-0000400
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-08 - 2026-ELEC-0001828
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-03 - 2025-PLUMB-0011195
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-08-06 - 2026-ELEC-0001828
11:00 AM - 01:00 PM: 313 - Meter Release
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-08-05 - 2026-ROOFSIDE-0003578
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-08-03 - 2026-ROOFSIDE-0003578
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-08-03 - 2026-ELEC-0001828
08:30 AM - 09:30 AM: 313 - Meter Release
2026-06-22 - 2025-RESCON-0001985
11:00 AM - 01:00 PM: 107 - Drywall
39 S Kalamath ST
Recent Inspections
2026-09-11 - 2024-ELEC-0005760
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
11:00 AM - 01:00 PM: 301 - Underground
2026-09-10 - 2024-ELEC-0005760
08:30 AM - 09:30 AM: 301 - Underground
08:30 AM - 09:30 AM: 307 - Service Equipment
08:30 AM - 09:30 AM: 313 - Meter Release
2026-09-09 - 2024-COMMCON-0000112
01:00 PM - 02:30 PM: 107 - Drywall
2026-09-04 - 2024-COMMCON-0000112
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-09-03 - 2024-MECH-0003074
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-09-02 - 2024-COMMCON-0000112
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-01 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-08-28 - 2025-FIRE-0003548
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-28 - 2024-ELEC-0005760
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-27 - 2025-FIRE-0003548
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-08-27 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-27 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-26 - 2025-FIRE-0003548
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-26 - 2024-ELEC-0005760
08:30 AM - 09:30 AM: 308 - Ceiling
2026-08-21 - 2024-ELEC-0005760
01:00 PM - 03:00 PM: 308 - Ceiling
2026-08-14 - 2024-ELEC-0005760
08:00 AM - 01:00 PM: 301 - Underground
2026-08-13 - 2024-ELEC-0005760
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-08-12 - 2024-ELEC-0005760
08:00 AM - 03:00 PM: 301 - Underground
2026-08-10 - 2025-FIRE-0004263
11:00 AM - 01:00 PM: 411 - Rough
2026-08-10 - 2024-COMMCON-0000112
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-10 - 2024-ELEC-0005760
01:00 PM - 03:00 PM: 301 - Underground
2026-07-23 - 2024-COMMCON-0000112
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-14 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 112 - Frame
2026-07-13 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 309 - Walls
2026-07-13 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-08 - 2024-ELEC-0005760
11:00 AM - 01:00 PM: 309 - Walls
2026-07-02 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-07-01 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 309 - Walls
2026-06-30 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 112 - Frame
2026-06-30 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-06-29 - 2025-FIRE-0004263
10:00 AM - 12:00 PM: 411 - Rough
2026-06-26 - 2025-FIRE-0004263
08:00 AM - 10:30 AM: 411 - Rough
2026-06-22 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 308 - Ceiling
2026-06-22 - 2026-PLUMB-0003687
12:00 PM - 03:00 PM: 401 - Rough
1245 S York St
Recent Inspections
2026-09-11 - 2026-RESCON-0000746
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-09 - 2026-PLUMB-0005490
08:30 AM - 11:30 AM: 403 - Pressure Test
08:30 AM - 11:30 AM: 405 - Meter Release
2026-09-08 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-08 - 2026-PLUMB-0005490
08:30 AM - 11:30 AM: 401 - Rough
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-31 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-08-18 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-17 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-16 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-13 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 116 - Building Slab
2026-07-13 - 2026-PLUMB-0005566
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-07-08 - 2026-PLUMB-0005490
08:00 AM - 10:00 AM: 400 - Groundwork
3372 W 33rd AVE
Recent Inspections
2026-09-11 - 2025-PLUMB-0011228
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-07-18 - 2026-ELEC-0005546
11:00 AM - 01:00 PM: 313 - Meter Release
2026-07-17 - 2026-ELEC-0005546
11:00 AM - 01:00 PM: 313 - Meter Release
2026-07-14 - 2026-ROOFSIDE-0003680
08:30 AM - 05:30 PM: 201 - Final - Roof
2026-06-24 - 2026-ELEC-0005546
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-06-22 - 2024-RESCON-0002194
11:00 AM - 01:00 PM: 107 - Drywall
2280 S Albion ST
Recent Inspections
2026-09-11 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-10 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-09 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-09 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-09-09 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-03 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-02 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-01 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-01 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-01 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-31 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-31 - 2024-MECH-0008304
08:30 AM - 11:00 AM: 903 - Rough
2026-08-28 - 2025-FIRE-0006225
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-28 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2024-ELEC-0013842
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-27 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-26 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-21 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-21 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-21 - 2024-PLUMB-0012646
08:30 AM - 11:30 AM: 401 - Rough
2026-08-20 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-20 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-08-20 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-20 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-08-19 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-18 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-18 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-18 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-17 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-08-17 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 903 - Rough
2026-08-14 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-14 - 2025-FIRE-0006234
08:00 AM - 10:00 AM: 411 - Rough
2026-08-14 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-13 - 2025-FIRE-0006225
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-13 - 2024-COMMCON-0002609
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 109 - Other
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2024-ELEC-0013842
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-12 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-12 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-12 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-11 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-08-10 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-10 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-07 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-06 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-08-06 - 2024-MECH-0008304
09:30 AM - 11:30 AM: 903 - Rough
2026-08-05 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-04 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-08-04 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 903 - Rough
2026-08-03 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-31 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-29 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-28 - 2024-COMMCON-0002609
08:30 AM - 10:30 AM: 107 - Drywall
08:30 AM - 10:30 AM: 109 - Other
08:30 AM - 10:30 AM: 112 - Frame
2026-07-27 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-27 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2025-GBO-0000004
TBD: GBO - Pre Construction Meeting
2026-07-24 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-24 - 2024-ELEC-0013842
TBD: 302 - Partial Rough
2026-07-23 - 2024-ELEC-0013842
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-23 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-22 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-22 - 2024-ELEC-0013842
12:30 PM - 02:30 PM: 308 - Ceiling
2026-07-21 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-21 - 2025-FIRE-0006234
08:00 AM - 10:00 AM: 411 - Rough
2026-07-21 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-21 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-20 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-20 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-20 - 2024-MECH-0008304
09:00 AM - 11:30 AM: 903 - Rough
2026-07-17 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-17 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-16 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-16 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-16 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-15 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-15 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-14 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-14 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-14 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-13 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-13 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-07-13 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-10 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-07-10 - 2024-ELEC-0013842
08:30 AM - 09:30 AM: 308 - Ceiling
2026-07-09 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-08 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-08 - 2024-MECH-0008304
11:00 AM - 01:00 PM: 903 - Rough
2026-07-07 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-01 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-01 - 2024-MECH-0008304
11:00 AM - 01:00 PM: 903 - Rough
2026-06-30 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-06-30 - 2024-ELEC-0013842
01:00 PM - 03:00 PM: 309 - Walls
2026-06-29 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-29 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-29 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 305 - Final - Electrical
12:00 PM - 02:00 PM: 309 - Walls
2026-06-26 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-26 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 500 - Rough
2026-06-26 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 309 - Walls
2026-06-25 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-25 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-25 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2025-FIRE-0006234
09:00 AM - 11:30 AM: 411 - Rough
2026-06-24 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-06-24 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2026-ELEC-0001446
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-23 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-06-23 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-PLUMB-0012646
08:30 AM - 11:30 AM: 400 - Groundwork
2026-06-22 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-06-22 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
1612 S Washington ST
Recent Inspections
2026-09-11 - 2025-PLUMB-0009492
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-11 - 2026-ELEC-0001530
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-10 - 2024-RESCON-0003624
09:00 AM - 11:00 AM: 109 - Other
2026-09-10 - 2025-PLUMB-0009492
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-10 - 2026-ELEC-0001530
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-10 - 2026-ELEC-0005230
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-09 - 2024-RESCON-0003624
11:00 AM - 01:00 PM: 109 - Other
2026-09-09 - 2026-ROOFSIDE-0002456
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-09-09 - 2026-ROOFSIDE-0002457
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-09-09 - 2025-MECH-0008453
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-09 - 2025-PLUMB-0009492
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-09 - 2026-ELEC-0001530
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-09 - 2026-ELEC-0005230
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-09 - 2026-MECH-0000477
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-01 - 2024-RESCON-0003624
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-26 - 2024-RESCON-0003624
09:00 AM - 11:00 AM: 112 - Frame
2026-08-12 - 2024-RESCON-0003624
09:00 AM - 11:00 AM: 112 - Frame
2026-08-07 - 2024-RESCON-0003624
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-08-05 - 2024-RESCON-0003624
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-08-04 - 2026-ELEC-0005230
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 313 - Meter Release
1608 S Washington ST
Recent Inspections
2026-09-11 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2026-ROOFSIDE-0002458
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-09 - 2026-ROOFSIDE-0002459
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-09 - 2025-MECH-0008452
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-09 - 2026-MECH-0000474
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-01 - 2024-RESCON-0003623
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-26 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 112 - Frame
2026-08-12 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 112 - Frame
2026-08-07 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-08-05 - 2024-RESCON-0003623
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-08-04 - 2026-ELEC-0005229
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 313 - Meter Release
2026-07-31 - 2024-RESCON-0003623
09:00 AM - 11:00 AM: 105 - Exterior Sheathing