6300 E Hampden AVE
Recent Inspections
2026-10-27 - 2026-FIRE-0004745
08:30 AM - 11:30 AM: 411 - Rough
2026-10-22 - 2026-ELEC-0005538
11:00 AM - 01:00 PM: 308 - Ceiling
2026-10-19 - 2026-ELEC-0001165
10:00 AM - 12:00 PM: 301 - Underground
2026-10-05 - 2026-PLUMB-0007621
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-05 - 2026-PLUMB-0007795
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-05 - 2026-PLUMB-0007991
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-09-30 - 2026-MECH-0006012
01:00 AM - 03:00 PM: 903 - Rough
2026-09-29 - 2026-COMMCON-0000251
08:30 AM - 09:30 AM: 107 - Drywall
2026-09-25 - 2026-COMMCON-0000251
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-24 - 2026-COMMCON-0000251
09:00 AM - 11:00 AM: 107 - Drywall
2026-09-24 - 2026-MECH-0004284
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-09-24 - 2026-MECH-0006012
11:00 AM - 01:00 PM: 903 - Rough
2026-09-23 - 2026-COMMCON-0001153
10:00 AM - 12:00 PM: 109 - Other
2026-09-21 - 2026-ELEC-0005323
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-18 - 2026-BOILERAC-0000581
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-09-18 - 2026-COMMCON-0000251
09:30 AM - 11:30 AM: 112 - Frame
2026-09-17 - 2026-FIRE-0003627
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-17 - 2026-COMMCON-0000251
11:00 AM - 01:00 PM: 112 - Frame
2026-09-17 - 2026-COMMCON-0001153
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-17 - 2026-MECH-0006012
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-17 - 2026-PLUMB-0003623
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-09-16 - 2026-FIRE-0005040
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-16 - 2026-FIRE-0004436
08:30 AM - 11:30 AM: 411 - Rough
2026-09-16 - 2026-ELEC-0001165
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-15 - 2026-COMMCON-0000251
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-09-14 - 2026-FIRE-0005040
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-14 - 2026-PLUMB-0007398
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-14 - 2026-PLUMB-0007426
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-14 - 2026-COMMCON-0000251
12:00 PM - 02:00 PM: 104 - Frost Wall Insulation
2026-09-14 - 2026-ELEC-0001165
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-14 - 2026-ELEC-0005538
12:00 PM - 02:00 PM: 309 - Walls
2026-09-14 - 2026-PLUMB-0003623
08:30 AM - 11:30 AM: 400 - Groundwork
2026-09-14 - 2026-PLUMB-0007149
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-11 - 2026-COMMCON-0000251
TBD: Document Review Inspection
2026-09-10 - 2026-COMMCON-0000251
10:00 AM - 12:00 PM: 112 - Frame
2026-09-08 - 2026-COMMCON-0000251
10:00 AM - 12:00 PM: 112 - Frame
2026-09-04 - 2026-MECH-0001758
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 903 - Rough
2026-09-04 - 2026-BOILERAC-0000581
01:00 PM - 03:00 PM: 702 - Partial Rough
2026-09-04 - 2026-ELEC-0001165
01:00 PM - 03:00 PM: 301 - Underground
01:00 PM - 03:00 PM: 303 - Full Rough
TBD: 309 - Walls
2026-09-04 - 2026-MECH-0005689
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-03 - 2026-ELEC-0001165
12:00 PM - 02:00 PM: 303 - Full Rough
TBD: 301 - Underground
2026-09-02 - 2026-ELEC-0001165
08:30 AM - 09:30 AM: 301 - Underground
08:30 AM - 09:30 AM: 303 - Full Rough
2026-09-02 - 2026-MECH-0001758
01:00 PM - 03:00 PM: 903 - Rough
2026-08-31 - 2026-ELEC-0005538
12:00 PM - 02:00 PM: 301 - Underground
2026-08-28 - 2026-PLUMB-0006748
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-08-28 - 2026-PLUMB-0006887
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-08-28 - 2026-PLUMB-0007015
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-08-21 - 2026-MECH-0001758
01:00 PM - 03:00 PM: 903 - Rough
2026-08-21 - 2026-COMMCON-0000251
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 500 - Rough
2026-08-21 - 2026-PLUMB-0003623
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-20 - 2026-ELEC-0001165
12:00 PM - 02:00 PM: 303 - Full Rough
2026-08-20 - 2026-MECH-0001758
01:00 PM - 03:00 PM: 903 - Rough
2026-08-20 - 2026-PLUMB-0003623
08:30 AM - 11:30 AM: 401 - Rough
2026-08-19 - 2026-COMMCON-0000251
09:00 AM - 11:00 AM: 500 - Rough
2026-08-06 - 2026-PLUMB-0005853
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-08-06 - 2026-PLUMB-0005992
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-08-06 - 2026-PLUMB-0006110
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-30 - 2026-COMMCON-0000251
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-07-29 - 2026-PLUMB-0003772
09:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-07-28 - 2026-ELEC-0001165
10:00 AM - 12:00 PM: 300 - Slab
2026-07-27 - 2026-COMMCON-0000251
09:00 AM - 11:00 AM: 500 - Rough
2026-07-21 - 2026-COMMCON-0000251
10:00 AM - 12:00 PM: 100 - Footing
2026-07-13 - 2026-PLUMB-0005401
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-13 - 2026-PLUMB-0005440
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-13 - 2026-PLUMB-0005514
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-01 - 2026-PLUMB-0004405
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-01 - 2026-PLUMB-0005086
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-01 - 2026-PLUMB-0005316
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-06-25 - 2026-PLUMB-0005154
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-06-25 - 2026-PLUMB-0005218
08:30 AM - 11:30 AM: 402 - Final - Plumbing
5465 E Bails DR
Recent Inspections
2026-10-27 - 2026-PLUMB-0003307
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-27 - 2026-PLUMB-0006684
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-23 - 2026-ELEC-0005596
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-ELEC-0005826
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-08-28 - 2026-RESCON-0000424
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-03 - 2026-RESCON-0000424
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-27 - 2026-RESCON-0000424
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
2026-07-27 - 2026-ELEC-0005596
10:00 AM - 12:00 PM: 301 - Underground
2026-07-27 - 2026-ELEC-0005826
10:00 AM - 12:00 PM: 301 - Underground
2026-07-24 - 2026-RESCON-0000424
10:00 AM - 12:00 PM: 112 - Frame
2026-07-23 - 2026-RESCON-0000424
09:00 AM - 11:00 AM: 112 - Frame
2026-07-21 - 2026-RESCON-0000424
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
09:00 AM - 11:00 AM: 112 - Frame
2026-07-15 - 2026-PLUMB-0003307
08:00 AM - 10:00 AM: 401 - Rough
2026-07-01 - 2026-ELEC-0005596
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-01 - 2026-ELEC-0005826
08:00 AM - 10:00 AM: 303 - Full Rough
2026-06-23 - 2026-ELEC-0005596
12:00 PM - 02:00 PM: 303 - Full Rough
2417 S Lafayette ST
Recent Inspections
2026-10-27 - 2025-RESCON-0001870
TBD: Document Review
08:30 AM - 05:30 PM: 112 - Frame
2026-10-27 - 2025-RESCON-0001871
TBD: Document Review
01:00 PM - 03:00 PM: 112 - Frame
2026-10-23 - 2025-RESCON-0001870
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-10-23 - 2025-RESCON-0001871
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-10-21 - 2026-PLUMB-0003618
08:30 AM - 11:30 AM: 401 - Rough
2026-10-21 - 2026-PLUMB-0003619
08:30 AM - 11:30 AM: 401 - Rough
2026-10-19 - 2026-ELEC-0005636
12:00 PM - 02:30 PM: 303 - Full Rough
2026-10-19 - 2026-ELEC-0005638
12:00 PM - 02:30 PM: 303 - Full Rough
2026-10-16 - 2026-ELEC-0005636
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-16 - 2026-ELEC-0005638
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-25 - 2025-RESCON-0001870
11:00 AM - 01:00 PM: 109 - Other
2026-09-25 - 2025-RESCON-0001871
11:00 AM - 01:00 PM: 109 - Other
2026-09-10 - 2026-MECH-0005828
01:00 PM - 03:00 PM: 903 - Rough
2026-08-31 - 2026-ROOFSIDE-0004898
12:30 PM - 02:30 PM: 206 - Other
2026-08-21 - 2025-RESCON-0001870
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-08-21 - 2025-RESCON-0001871
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-08-20 - 2025-RESCON-0001870
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-08-20 - 2025-RESCON-0001871
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-06-30 - 2025-RESCON-0001870
01:00 PM - 03:00 PM: 116 - Building Slab
2026-06-30 - 2025-RESCON-0001871
01:00 PM - 03:00 PM: 116 - Building Slab
2026-06-24 - 2026-ELEC-0005636
10:00 AM - 12:00 PM: 301 - Underground
2026-06-24 - 2026-ELEC-0005638
10:00 AM - 12:00 PM: 301 - Underground
2026-06-23 - 2026-ELEC-0005636
12:00 PM - 02:00 PM: 301 - Underground
2026-06-23 - 2026-ELEC-0005638
12:00 PM - 02:00 PM: 301 - Underground
2026-06-23 - 2026-PLUMB-0003618
08:30 AM - 11:30 AM: 400 - Groundwork
2026-06-23 - 2026-PLUMB-0003619
08:30 AM - 11:30 AM: 400 - Groundwork
1042 N Pontiac ST
Recent Inspections
2026-10-26 - 2026-ROOFSIDE-0006596
11:00 AM - 02:00 PM: 201 - Final - Roof
2026-10-15 - 2025-RESCON-0003818
08:30 AM - 05:30 PM: 108 - Final - Residential
2026-10-14 - 2026-ELEC-0005451
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-10-13 - 2026-ELEC-0005451
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-10-09 - 2026-MECH-0002299
12:00 PM - 02:00 PM: Document Review
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-10-08 - 2026-PLUMB-0003348
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-07-27 - 2025-RESCON-0003818
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-10 - 2025-RESCON-0003818
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-06-29 - 2025-RESCON-0003818
09:00 AM - 01:00 PM: 112 - Frame
2026-06-25 - 2025-RESCON-0003818
12:00 PM - 02:00 PM: 112 - Frame
2026-06-24 - 2026-ELEC-0005451
TBD: 303 - Full Rough
2026-06-24 - 2026-MECH-0002299
10:00 AM - 12:00 PM: 903 - Rough
2506 W 29th AVE
Recent Inspections
2026-10-27 - 2026-ELEC-0008487
11:00 AM - 01:00 PM: 303 - Full Rough
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-10-27 - 2026-ELEC-0008491
11:00 AM - 01:00 PM: 303 - Full Rough
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-10-26 - 2026-ELEC-0008487
08:30 AM - 10:30 AM: 303 - Full Rough
2026-10-26 - 2026-ELEC-0008491
08:30 AM - 10:30 AM: 303 - Full Rough
2026-10-21 - 2026-MECH-0006667
08:30 AM - 11:00 AM: 903 - Rough
2026-10-21 - 2026-MECH-0006669
08:30 AM - 11:00 AM: 903 - Rough
2026-10-13 - 2026-MECH-0006667
09:00 AM - 11:00 AM: 903 - Rough
2026-10-13 - 2026-MECH-0006669
09:00 AM - 11:00 AM: 903 - Rough
2026-10-06 - 2025-RESCON-0002008
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-09-18 - 2026-PLUMB-0005691
08:00 AM - 10:30 AM: 401 - Rough
2026-09-17 - 2025-RESCON-0002008
10:30 AM - 12:30 PM: 109 - Other
2026-09-17 - 2025-RESCON-0002009
10:30 AM - 12:30 PM: 109 - Other
2026-09-15 - 2026-ELEC-0008487
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-09-15 - 2026-ELEC-0008491
08:30 AM - 10:30 AM: 304 - Partial Final
2026-09-11 - 2026-PLUMB-0005621
10:30 AM - 12:30 PM: 401 - Rough
2026-09-11 - 2026-PLUMB-0005691
08:00 AM - 10:30 AM: 401 - Rough
2026-08-12 - 2025-RESCON-0002008
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-08-12 - 2025-RESCON-0002009
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-08-07 - 2026-PLUMB-0006075
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-08-07 - 2026-PLUMB-0006076
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-07-16 - 2026-PLUMB-0005691
11:00 AM - 01:00 PM: 400 - Groundwork
2026-07-15 - 2026-PLUMB-0005621
09:00 AM - 11:00 AM: 400 - Groundwork
2026-07-14 - 2026-PLUMB-0005621
10:30 AM - 12:30 PM: 400 - Groundwork
2026-07-14 - 2025-RESCON-0002008
09:30 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-07-02 - 2025-RESCON-0002009
10:30 AM - 12:30 PM: 113 - Pre Construction Meeting
1571 N Yosemite ST
Recent Inspections
2026-10-26 - 2026-ELEC-0010210
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-26 - 2026-MECH-0006956
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-10-08 - 2026-ELEC-0007797
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
4831 W 10th
Recent Inspections
2026-10-27 - 2024-RESCON-0000205
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-26 - 2024-RESCON-0000205
TBD: 113 - Pre Construction Meeting
2026-10-21 - 2024-RESCON-0000205
TBD: 113 - Pre Construction Meeting
2026-10-20 - 2024-RESCON-0000205
TBD: 113 - Pre Construction Meeting
2315 W 46th AVE
Recent Inspections
2026-10-27 - 2026-PLUMB-0006782
09:00 AM - 11:00 AM: 401 - Rough
2026-10-15 - 2022-RESCON-0004919
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-10-13 - 2022-RESCON-0004919
TBD: Document Review
2026-08-17 - 2022-RESCON-0004919
TBD: 113 - Pre Construction Meeting
2026-08-17 - 2022-RESCON-0004920
TBD: 113 - Pre Construction Meeting
2026-07-28 - 2022-RESCON-0004918
08:30 AM - 05:30 PM: 108 - Final - Residential
2026-07-24 - 2022-RESCON-0004918
10:30 AM - 12:30 PM: 109 - Other
2026-07-20 - 2022-RESCON-0004918
01:00 AM - 03:00 AM: 108 - Final - Residential