1811 S Quebec WAY
Recent Inspections
2026-09-11 - 2026-MECH-0005604
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-08 - 2026-ELEC-0008264
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-08 - 2026-MECH-0005604
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-13 - 2026-ELEC-0006219
10:00 AM - 12:00 PM: 305 - Final - Electrical
3157 S Dallas CT
Recent Inspections
2026-09-11 - 2026-PLUMB-0005814
08:30 AM - 11:30 AM: 401 - Rough
2026-09-09 - 2026-MECH-0004185
11:00 AM - 01:00 PM: 903 - Rough
2026-09-03 - 2026-RESCON-0002696
TBD: 113 - Pre Construction Meeting
2026-08-31 - 2026-ELEC-0003687
12:00 PM - 02:00 PM: 301 - Underground
2026-07-31 - 2026-PLUMB-0005814
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-07-29 - 2026-PLUMB-0005814
09:30 AM - 12:30 PM: 400 - Groundwork
2026-07-17 - 2025-RESCON-0000357
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-16 - 2025-RESCON-0000357
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-06-30 - 2025-RESCON-0000357
01:00 PM - 03:00 PM: 109 - Other
2026-06-29 - 2025-RESCON-0000357
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
205 N Kearney ST
Recent Inspections
2026-09-11 - 2026-ELEC-0008106
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-02 - 2026-MECH-0004742
08:30 AM - 11:00 AM: 903 - Rough
2026-08-26 - 2026-ROOFSIDE-0004213
11:00 AM - 01:00 PM: 206 - Other
2026-08-11 - 2026-PLUMB-0004004
10:00 AM - 12:00 PM: 401 - Rough
2026-08-10 - 2026-PLUMB-0004004
10:00 AM - 12:00 PM: 401 - Rough
2026-07-28 - 2025-RESCON-0002686
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-20 - 2025-RESCON-0002686
01:00 PM - 03:00 PM: Document Review
2026-07-16 - 2025-RESCON-0002686
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
11:00 AM - 01:00 PM: 109 - Other
260 N King ST
Recent Inspections
2026-09-11 - 2025-ELEC-0011529
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-09-03 - 2025-ELEC-0011529
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-09-03 - 2025-MECH-0007043
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-03 - 2025-PLUMB-0009476
12:00 PM - 03:00 PM: 402 - Final - Plumbing
1282 S Wyandot WAY
Recent Inspections
2026-09-11 - 2026-ELEC-0007345
12:00 PM - 02:00 PM: 303 - Full Rough
12:00 PM - 02:00 PM: 307 - Service Equipment
12:00 PM - 02:00 PM: 313 - Meter Release
2026-09-02 - 2025-RESCON-0001350
11:00 AM - 01:00 PM: 108 - Final - Residential
2026-09-01 - 2026-RESCON-0002350
10:00 AM - 12:00 PM: 109 - Other
2026-08-07 - 2026-RESCON-0002350
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
1065 S Elizabeth ST
Recent Inspections
2026-09-11 - 2025-RESCON-0002576
10:00 AM - 12:00 PM: 112 - Frame
2026-08-27 - 2026-ELEC-0007865
08:00 AM - 01:00 PM: 303 - Full Rough
2026-08-26 - 2026-ELEC-0007865
TBD: 307 - Service Equipment
10:00 AM - 12:00 PM: 301 - Underground
10:00 AM - 12:00 PM: 313 - Meter Release
2026-08-05 - 2025-RESCON-0002576
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-07-30 - 2026-ROOFSIDE-0002315
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-30 - 2026-ROOFSIDE-0002316
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-17 - 2025-RESCON-0002576
08:30 AM - 10:30 AM: 105 - Exterior Sheathing
2026-07-13 - 2025-RESCON-0002576
TBD: Document Review
2026-07-10 - 2026-PLUMB-0002083
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-06-30 - 2025-RESCON-0002576
11:00 AM - 01:00 PM: 107 - Drywall
221 N Milwaukee ST
Recent Inspections
2026-09-11 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 309 - Walls
08:00 AM - 10:00 AM: 313 - Meter Release
2026-09-11 - 2025-MECH-0003765
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-10 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-09 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-09 - 2025-MECH-0003765
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-09-08 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-08 - 2025-PLUMB-0005669
11:00 AM - 01:00 PM: 401 - Rough
2026-09-05 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-04 - 2026-FIRE-0000330
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-04 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-04 - 2025-ELEC-0006040
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-09-03 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-02 - 2025-ELEC-0006040
10:00 AM - 12:00 PM: 308 - Ceiling
08:00 AM - 10:00 AM: 312 - UFER
2026-09-02 - 2026-FIRE-0000338
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-02 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-01 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 112 - Frame
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-09-01 - 2026-FIRE-0000338
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-01 - 2025-ELEC-0006040
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-31 - 2025-FIRE-0006733
10:00 AM - 12:00 PM: 411 - Rough
2026-08-31 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-27 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-27 - 2025-MECH-0003765
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-26 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-08-21 - 2025-PLUMB-0005669
08:00 AM - 10:00 AM: 401 - Rough
2026-08-20 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-08-19 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-08-18 - 2025-FIRE-0006733
09:00 AM - 11:00 AM: 411 - Rough
2026-08-18 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-18 - 2025-PLUMB-0005669
09:00 AM - 11:00 AM: 401 - Rough
2026-08-17 - 2026-FIRE-0000330
08:01 AM - 10:00 AM: 302 - Partial Rough
2026-08-17 - 2026-FIRE-0000338
08:01 AM - 10:00 AM: 302 - Partial Rough
2026-08-17 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-17 - 2025-ELEC-0006040
08:01 AM - 10:00 AM: 308 - Ceiling
2026-08-14 - 2026-FIRE-0000330
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-14 - 2026-FIRE-0000338
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-14 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 308 - Ceiling
08:00 AM - 10:00 AM: 309 - Walls
2026-08-13 - 2026-FIRE-0000338
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-13 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0006040
08:30 AM - 09:30 AM: 308 - Ceiling
2026-08-13 - 2025-MECH-0003765
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-12 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 112 - Frame
2026-08-12 - 2025-FIRE-0006733
10:00 AM - 12:00 PM: 411 - Rough
2026-08-12 - 2025-ELEC-0006040
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-11 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-08-10 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-10 - 2025-PLUMB-0005669
08:00 AM - 10:00 AM: 401 - Rough
2026-08-07 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-07 - 2025-PLUMB-0005669
12:00 PM - 03:00 PM: 401 - Rough
2026-08-06 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-FIRE-0006733
09:00 AM - 11:00 AM: 411 - Rough
2026-08-05 - 2026-FIRE-0000338
09:30 AM - 11:30 PM: 302 - Partial Rough
2026-08-05 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-ELEC-0006040
09:30 AM - 11:30 PM: 308 - Ceiling
2026-08-05 - 2025-PLUMB-0005669
09:00 AM - 11:00 AM: 401 - Rough
2026-08-04 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-08-04 - 2026-PLUMB-0003075
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-08-03 - 2026-FIRE-0000338
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-03 - 2024-COMMCON-0002573
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-03 - 2025-ELEC-0006040
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-03 - 2026-PLUMB-0003075
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-07-30 - 2026-FIRE-0000338
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-30 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-07-30 - 2025-ELEC-0006040
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-30 - 2026-PLUMB-0003075
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-29 - 2025-FIRE-0006733
09:00 AM - 11:00 AM: 411 - Rough
2026-07-29 - 2026-FIRE-0000338
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-29 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-29 - 2025-ELEC-0006040
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-07-28 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-28 - 2025-MECH-0003765
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-07-27 - 2026-FIRE-0000338
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-27 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-27 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-25 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-24 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-23 - 2024-COMMCON-0002573
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-23 - 2026-FIRE-0000338
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-23 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-23 - 2025-MECH-0003765
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-22 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-22 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-21 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-21 - 2025-MECH-0003765
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-07-20 - 2025-FIRE-0006733
11:00 AM - 01:00 PM: 411 - Rough
2026-07-20 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-20 - 2025-MECH-0003765
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-17 - 2024-COMMCON-0002573
01:00 AM - 03:00 PM: 106 - Batt Insulation
01:00 AM - 03:00 PM: 107 - Drywall
01:00 AM - 03:00 PM: 112 - Frame
2026-07-16 - 2025-BOILERAC-0000487
01:00 PM - 03:00 PM: 702 - Partial Rough
2026-07-16 - 2026-FIRE-0000338
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-16 - 2024-COMMCON-0002573
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-16 - 2025-ELEC-0006040
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-15 - 2025-FIRE-0006733
11:00 AM - 01:00 PM: 411 - Rough
2026-07-15 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2025-MECH-0003765
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-07-14 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-10 - 2025-FIRE-0006733
09:00 AM - 11:00 AM: 411 - Rough
2026-07-10 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-09 - 2025-FIRE-0006733
11:00 AM - 01:00 PM: 411 - Rough
2026-07-09 - 2026-FIRE-0000338
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-09 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-07-09 - 2025-ELEC-0006040
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-09 - 2025-PLUMB-0005669
11:00 AM - 01:00 PM: 401 - Rough
2026-07-08 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2025-FIRE-0006733
08:30 AM - 05:30 PM: 411 - Rough
2026-07-06 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2026-FIRE-0000338
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-02 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-01 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-01 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-29 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-27 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-06-26 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
2026-06-25 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-25 - 2025-ELEC-0006040
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-25 - 2026-FIRE-0000338
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-24 - 2024-COMMCON-0002573
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-06-24 - 2025-BOILERAC-0000487
08:00 AM - 11:00 AM: 702 - Partial Rough
2026-06-24 - 2025-MECH-0003765
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-06-23 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-22 - 2026-FIRE-0000338
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-06-22 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-22 - 2025-ELEC-0011680
TBD: 305 - Final - Electrical
2026-06-19 - 2024-COMMCON-0002573
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame