301 N Gaylord ST
Recent Inspections
2026-10-27 - 2025-RESCON-0000255
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-10-22 - 2025-RESCON-0000255
10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-17 - 2025-ELEC-0013092
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-16 - 2025-ELEC-0013092
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-08 - 2025-ROOFSIDE-0008524
08:45 AM - 11:00 AM: 201 - Final - Roof
2026-10-08 - 2025-ROOFSIDE-0009601
08:45 AM - 11:00 AM: 201 - Final - Roof
2026-09-25 - 2025-RESCON-0000255
09:00 AM - 11:00 AM: 109 - Other
2026-09-02 - 2025-MECH-0007292
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-02 - 2025-MECH-0008063
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-08-26 - 2025-PLUMB-0004861
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-17 - 2025-PLUMB-0004861
08:00 AM - 10:00 AM: 402 - Final - Plumbing
08:00 AM - 10:00 AM: 403 - Pressure Test
4813 W 10th AVE
Recent Inspections
2026-10-27 - 2024-RESCON-0000188
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-26 - 2024-RESCON-0000188
TBD: 113 - Pre Construction Meeting
2026-10-21 - 2024-RESCON-0000188
TBD: 113 - Pre Construction Meeting
2026-10-20 - 2024-RESCON-0000188
TBD: 113 - Pre Construction Meeting
473 W Bayaud Ave
Recent Inspections
2026-10-27 - 2024-ELEC-0008150
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-27 - 2025-ELEC-0002119
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-27 - 2026-COMMCON-0002069
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-26 - 2026-COMMCON-0002069
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-26 - 2024-PLUMB-0006013
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-10-22 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-10-22 - 2026-ACCCON-0000207
11:00 AM - 01:00 PM: 304 - Partial Final
2026-10-22 - 2024-BOILERAC-0000455
08:30 AM - 11:00 AM: 704 - Final - Boiler AC
2026-10-22 - 2026-ROOFSIDE-0000062
12:00 PM - 02:00 PM: 203 - Final - Siding
2026-10-22 - 2024-MECH-0003610
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2025-ELEC-0002119
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-22 - 2026-COMMCON-0000184
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
TBD: 108 - Final - Commercial
2026-10-22 - 2026-ELEC-0001202
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-22 - 2026-ELEC-0009436
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-22 - 2026-MECH-0001076
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-21 - 2025-FIRE-0006791
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-21 - 2026-ACCCON-0000207
11:00 AM - 01:00 PM: 304 - Partial Final
2026-10-21 - 2026-FIRE-0002313
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-21 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-10-21 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-10-20 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
2026-10-19 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-19 - 2025-FIRE-0006791
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-17 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-16 - 2026-ACCCON-0000207
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-16 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-15 - 2024-COMMCON-0001033
01:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-10-15 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
2026-10-15 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-10-14 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: Document Review Inspection
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-10-14 - 2025-FIRE-0006791
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-14 - 2024-ELEC-0008150
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-14 - 2024-MECH-0003610
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-13 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: Document Review Inspection
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-10-13 - 2025-FIRE-0006791
11:00 AM - 01:00 PM: 411 - Rough
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-13 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 304 - Partial Final
2026-10-09 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-08 - 2024-ELEC-0008150
TBD: 304 - Partial Final
2026-10-08 - 2024-COMMCON-0001033
12:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-10-08 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 903 - Rough
2026-10-07 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-10-07 - 2024-PLUMB-0006013
11:00 AM - 02:00 PM: 402 - Final - Plumbing
2026-10-07 - 2025-ELEC-0002119
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-10-06 - 2024-COMMCON-0001033
01:00 PM - 02:30 PM: 107 - Drywall
01:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-10-05 - 2024-COMMCON-0001033
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 121 - Certificate of Occupancy
2026-10-05 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-02 - 2024-COMMCON-0001033
12:00 PM - 02:30 PM: 106 - Batt Insulation
12:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-10-02 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 304 - Partial Final
2026-10-02 - 2026-FIRE-0002320
TBD: 303 - Full Rough
2026-10-02 - 2024-MECH-0003610
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-01 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-10-01 - 2026-FIRE-0002320
TBD: 302 - Partial Rough
2026-10-01 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-09-30 - 2024-COMMCON-0001033
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-09-30 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 308 - Ceiling
TBD: 302 - Partial Rough
2026-09-30 - 2026-FIRE-0002320
TBD: 302 - Partial Rough
2026-09-29 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 121 - Certificate of Occupancy
2026-09-29 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
2026-09-28 - 2024-COMMCON-0001033
12:00 PM - 02:30 PM: 107 - Drywall
12:00 PM - 02:30 PM: 121 - Certificate of Occupancy
2026-09-28 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-25 - 2024-COMMCON-0001033
12:00 PM - 02:30 PM: 108 - Final - Commercial
12:00 PM - 02:30 PM: 120 - Temporary Certificate of Occupancy
2026-09-25 - 2024-PLUMB-0006013
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-24 - 2026-ROOFSIDE-0000062
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-09-24 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 112 - Frame
2026-09-24 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-09-24 - 2024-PLUMB-0006013
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-09-24 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-23 - 2024-BOILERAC-0000455
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-09-23 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-09-23 - 2024-PLUMB-0006013
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-22 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-18 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-09-17 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 107 - Drywall
TBD: 112 - Frame
2026-09-15 - 2024-ELEC-0008150
09:00 AM - 12:00 PM: 302 - Partial Rough
09:00 AM - 12:00 PM: 304 - Partial Final
2026-09-14 - 2024-COMMCON-0001033
09:30 AM - 11:00 AM: 107 - Drywall
2026-09-11 - 2024-ELEC-0008150
09:00 AM - 12:00 PM: 304 - Partial Final
TBD: 302 - Partial Rough
2026-09-11 - 2024-MECH-0003610
10:00 AM - 12:00 PM: 903 - Rough
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-10 - 2024-ELEC-0008150
09:00 AM - 12:00 PM: 304 - Partial Final
2026-09-09 - 2024-COMMCON-0001033
01:00 PM - 02:30 PM: 112 - Frame
2026-09-09 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-08 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-04 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 301 - Underground
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-03 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-02 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-01 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-31 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
2026-08-28 - 2024-ELEC-0008150
09:00 AM - 11:00 AM: 304 - Partial Final
2026-08-27 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-27 - 2024-MECH-0003610
10:00 AM - 12:00 PM: 903 - Rough
2026-08-26 - 2024-MECH-0003610
TBD: 903 - Rough
2026-08-26 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-26 - 2024-ELEC-0008150
08:30 AM - 09:30 AM: 304 - Partial Final
2026-08-26 - 2026-MECH-0001076
10:00 AM - 12:00 PM: 903 - Rough
2026-08-21 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-20 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-19 - 2025-ELEC-0002119
10:00 AM - 12:00 PM: 309 - Walls
2026-08-19 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 309 - Walls
2026-08-18 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-08-14 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-13 - 2024-BOILERAC-0000455
12:00 PM - 02:00 PM: 703 - Rough
2026-08-13 - 2024-COMMCON-0001033
08:30 AM - 09:30 AM: 107 - Drywall
2026-08-13 - 2024-MECH-0003610
12:00 PM - 02:00 PM: 903 - Rough
2026-08-12 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-11 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-07 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-05 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-03 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-29 - 2024-ELEC-0008150
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-28 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-24 - 2024-ELEC-0008150
08:00 AM - 10:00 AM: 313 - Meter Release
2026-07-24 - 2025-ELEC-0002119
08:00 AM - 10:00 AM: 313 - Meter Release
2026-07-23 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-07-22 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-21 - 2024-COMMCON-0001033
08:30 AM - 09:30 AM: 107 - Drywall
2026-07-21 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 303 - Full Rough
2026-07-20 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-17 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-17 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 303 - Full Rough
2026-07-16 - 2024-COMMCON-0001033
10:30 AM - 12:00 PM: 106 - Batt Insulation
10:30 AM - 12:00 PM: 107 - Drywall
2026-07-15 - 2024-COMMCON-0001033
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-14 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-13 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-10 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-10 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-09 - 2024-COMMCON-0001033
08:30 AM - 09:30 AM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-08 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-07 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-07-07 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-06 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-06 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-02 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-02 - 2024-ELEC-0008150
09:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-01 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-01 - 2024-MECH-0003610
09:00 AM - 11:00 AM: 903 - Rough
2026-06-30 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-06-30 - 2024-MECH-0003610
09:00 AM - 11:00 AM: 903 - Rough
2026-06-29 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-06-27 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 112 - Frame
2026-06-26 - 2024-COMMCON-0001033
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 112 - Frame
2026-06-26 - 2024-ELEC-0008150
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-25 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-06-25 - 2024-ELEC-0008150
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-24 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-06-24 - 2024-ELEC-0008150
08:00 AM - 10:00 AM: 303 - Full Rough
2026-06-23 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-06-22 - 2024-COMMCON-0001033
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-06-22 - 2024-ELEC-0008150
08:00 AM - 10:00 AM: 303 - Full Rough
2460 S Steele ST
Recent Inspections
2026-10-27 - 2026-RESCON-0000201
01:00 PM - 03:00 PM: 108 - Final - Residential
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-09 - 2026-PLUMB-0008176
08:30 AM - 11:30 AM: 401 - Rough
08:30 AM - 11:30 AM: 403 - Pressure Test
08:30 AM - 11:30 AM: 405 - Meter Release
2026-09-14 - 2026-RESCON-0002774
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-09-10 - 2026-RESCON-0002774
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-03 - 2025-RESCON-0001180
TBD: 108 - Final - Residential
490 E Florida AVE
Recent Inspections
2026-10-27 - 2026-ELEC-0002059
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-10-26 - 2026-ELEC-0002534
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-14 - 2026-ROOFSIDE-0003219
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-10-14 - 2026-ROOFSIDE-0003220
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-07-06 - 2025-PLUMB-0010544
08:00 AM - 10:30 AM: 401 - Rough
2026-07-02 - 2025-PLUMB-0010544
08:00 AM - 10:00 AM: 401 - Rough
2026-06-30 - 2025-PLUMB-0010544
08:00 AM - 10:00 AM: 401 - Rough
2026-06-29 - 2026-ELEC-0002534
10:00 AM - 12:00 PM: 307 - Service Equipment
2445 S Quebec St
Recent Inspections
2026-10-26 - 2026-COMMCON-0000887
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-10-20 - 2026-COMMCON-0000887
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-10-19 - 2026-COMMCON-0000887
11:00 AM - 01:00 PM: 112 - Frame
2026-10-16 - 2024-COMMCON-0001575
11:00 AM - 09:30 AM: 112 - Frame
2026-10-15 - 2024-COMMCON-0001575
09:00 AM - 11:00 AM: 109 - Other
2026-10-14 - 2026-FIRE-0004191
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-14 - 2024-ELEC-0008174
08:00 AM - 10:00 AM: 308 - Ceiling
2026-10-05 - 2026-FIRE-0004191
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-28 - 2024-ELEC-0008174
10:00 AM - 12:00 PM: 308 - Ceiling
2026-09-18 - 2026-COMMCON-0000887
12:00 PM - 02:00 PM: 112 - Frame
2026-09-16 - 2024-COMMCON-0001575
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-15 - 2024-COMMCON-0001575
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-11 - 2024-COMMCON-0001575
09:00 AM - 11:00 AM: 112 - Frame
2026-09-10 - 2024-COMMCON-0001575
09:00 AM - 11:00 AM: 112 - Frame
2026-09-03 - 2026-ELEC-0005359
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-02 - 2026-ELEC-0005359
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-31 - 2024-COMMCON-0001575
09:00 AM - 11:00 AM: 112 - Frame
2026-08-28 - 2024-COMMCON-0001575
09:00 AM - 11:00 AM: 109 - Other
2026-08-27 - 2024-PLUMB-0008003
08:30 AM - 11:30 AM: 401 - Rough
2026-07-22 - 2026-COMMCON-0000887
09:00 AM - 11:00 AM: 112 - Frame
1507 S Pennsylvania ST
Recent Inspections
2026-10-27 - 2026-ELEC-0002052
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-10-26 - 2026-ELEC-0002537
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-14 - 2026-ROOFSIDE-0006140
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-10-14 - 2026-ROOFSIDE-0006143
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-07-13 - 2026-ELEC-0002537
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-06 - 2025-PLUMB-0010542
08:00 AM - 10:00 AM: 401 - Rough
2026-07-02 - 2025-PLUMB-0010542
08:00 AM - 10:00 AM: 401 - Rough
2026-06-30 - 2025-PLUMB-0010542
08:00 AM - 10:00 AM: 401 - Rough
2026-06-29 - 2026-ELEC-0002537
12:00 PM - 02:00 PM: 307 - Service Equipment
3326 N Williams ST
Recent Inspections
2026-10-27 - 2026-ELEC-0001773
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-23 - 2026-ELEC-0001773
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-23 - 2026-ELEC-0009325
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-09-21 - 2026-MECH-0001276
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-10 - 2026-PLUMB-0001404
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-09 - 2026-PLUMB-0001404
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2820 Champa ST
Recent Inspections
2026-10-27 - 2026-PLUMB-0003625
11:00 AM - 02:00 PM: 402 - Final - Plumbing
2026-09-22 - 2024-RESCON-0004112
11:00 AM - 01:00 PM: 109 - Other
2026-09-21 - 2024-RESCON-0004112
09:00 AM - 11:00 AM: 109 - Other
2026-09-03 - 2026-ELEC-0003129
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-08-28 - 2024-RESCON-0004112
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-20 - 2024-RESCON-0004112
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-14 - 2024-RESCON-0004112
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 112 - Frame
2026-07-06 - 2024-RESCON-0004112
08:30 AM - 05:30 PM: 112 - Frame
2026-07-02 - 2026-MECH-0003953
09:00 AM - 11:00 AM: 903 - Rough
2026-06-30 - 2024-RESCON-0004112
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-06-25 - 2026-ELEC-0003129
08:30 AM - 10:30 AM: 303 - Full Rough
2026-06-23 - 2024-RESCON-0004112
11:00 AM - 01:00 PM: 109 - Other
2026-06-22 - 2026-PLUMB-0003625
10:00 AM - 12:00 PM: 401 - Rough
257 N Fillmore ST
Recent Inspections
2026-10-26 - 2026-COMMCON-0001157
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-10-23 - 2025-COMMCON-0002689
09:00 AM - 11:00 AM: Document Review Inspection
2026-10-23 - 2025-ELEC-0013902
08:00 PM - 10:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-ELEC-0005429
08:00 PM - 10:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-MECH-0003516
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2025-ELEC-0013902
09:30 AM - 11:30 AM: 305 - Final - Electrical
2026-10-20 - 2025-COMMCON-0002689
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-13 - 2025-MECH-0008612
10:00 AM - 12:00 PM: Document Review
TBD: 904 - Final - Mechanical
2026-09-09 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-04 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 112 - Frame
2026-09-02 - 2025-ELEC-0013902
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-01 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 112 - Frame
2026-08-31 - 2025-ELEC-0013902
12:00 PM - 02:30 PM: 308 - Ceiling
2026-08-28 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2025-ELEC-0013902
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-28 - 2025-MECH-0008612
01:00 PM - 03:00 PM: 903 - Rough
2026-08-26 - 2025-COMMCON-0002689
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-21 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-20 - 2025-ELEC-0013902
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-17 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2025-MECH-0008612
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-04 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-08-03 - 2025-ELEC-0013902
09:00 AM - 11:00 AM: 307 - Service Equipment
2026-07-29 - 2025-PLUMB-0011465
09:00 AM - 11:00 AM: 401 - Rough
2026-07-28 - 2025-PLUMB-0011465
08:00 AM - 10:00 AM: 401 - Rough
2026-07-14 - 2025-COMMCON-0002689
11:00 AM - 01:00 PM: 109 - Other
2026-07-14 - 2025-ELEC-0013902
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-08 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 109 - Other
2026-07-07 - 2025-COMMCON-0002689
11:00 AM - 01:00 PM: 109 - Other
2026-07-06 - 2025-COMMCON-0002689
01:00 PM - 03:00 PM: 109 - Other
2026-07-01 - 2025-ELEC-0013902
09:00 AM - 11:00 AM: 307 - Service Equipment
TBD: 313 - Meter Release
2026-06-26 - 2025-ELEC-0013902
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-25 - 2025-COMMCON-0002689
11:00 AM - 01:00 PM: 107 - Drywall