2636 N Josephine ST
Recent Inspections
2026-10-27 - 2026-ELEC-0007912
10:00 AM - 12:30 PM: 303 - Full Rough
2026-10-22 - 2026-MECH-0005923
08:30 AM - 10:30 AM: 903 - Rough
2026-10-20 - 2026-PLUMB-0008421
08:00 AM - 10:00 AM: 402 - Final - Plumbing
08:00 AM - 10:00 AM: 404 - Water Service
2026-09-14 - 2026-MECH-0005923
11:00 AM - 01:00 PM: 903 - Rough
2026-07-30 - 2026-PLUMB-0005534
08:00 AM - 11:00 AM: 401 - Rough
2026-07-28 - 2026-PLUMB-0005534
08:30 AM - 10:30 AM: 401 - Rough
2026-06-29 - 2025-RESCON-0003288
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2535 Champa ST
Recent Inspections
2026-10-27 - 2026-PLUMB-0004034
11:00 AM - 02:00 PM: 402 - Final - Plumbing
2026-10-23 - 2026-ELEC-0006030
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-22 - 2026-ELEC-0006030
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-22 - 2026-MECH-0004499
10:30 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-08 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 107 - Drywall
2026-09-04 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-09-02 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 109 - Other
09:00 AM - 11:00 AM: 112 - Frame
09:00 AM - 11:00 AM: Document Review
2026-09-01 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 109 - Other
09:00 AM - 11:00 AM: 112 - Frame
2026-09-01 - 2026-MECH-0004499
09:00 AM - 11:00 AM: 903 - Rough
2026-08-28 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 112 - Frame
2026-08-28 - 2026-MECH-0004499
11:00 AM - 01:00 PM: 903 - Rough
2026-08-27 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 112 - Frame
2026-08-27 - 2026-MECH-0004499
11:00 AM - 01:00 PM: 903 - Rough
2026-08-26 - 2026-MECH-0004499
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 903 - Rough
2026-08-26 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 112 - Frame
2026-08-13 - 2025-RESCON-0003348
08:30 AM - 05:30 PM: 112 - Frame
2026-08-13 - 2026-MECH-0004499
08:30 AM - 09:30 AM: 903 - Rough
2026-08-11 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-08-07 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 109 - Other
2026-08-05 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-08-04 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 109 - Other
2026-08-04 - 2026-MECH-0004499
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-31 - 2026-MECH-0004499
11:00 AM - 01:00 PM: 903 - Rough
TBD: 904 - Final - Mechanical
2026-07-30 - 2026-MECH-0004499
01:00 PM - 03:00 PM: 903 - Rough
2026-07-27 - 2026-MECH-0004499
11:00 AM - 01:00 PM: 903 - Rough
2026-07-23 - 2026-MECH-0004499
01:00 PM - 03:00 PM: 903 - Rough
2026-07-21 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: 112 - Frame
2026-07-20 - 2026-ELEC-0006030
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-14 - 2026-PLUMB-0004034
08:00 AM - 10:00 AM: 401 - Rough
2026-07-13 - 2026-ELEC-0006030
08:30 AM - 10:30 AM: 303 - Full Rough
2026-07-06 - 2026-ELEC-0006030
10:00 AM - 12:30 PM: 301 - Underground
2026-06-26 - 2026-PLUMB-0004034
11:00 AM - 01:00 PM: 403 - Pressure Test
2026-06-24 - 2025-RESCON-0003348
08:30 AM - 10:30 AM: 105 - Exterior Sheathing
2026-06-22 - 2025-RESCON-0003348
09:00 AM - 11:00 AM: Document Review
2150 E 49th Ave
Recent Inspections
2026-10-27 - 2025-COMMCON-0000407
TBD: 106 - Batt Insulation
TBD: 112 - Frame
2026-10-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-10-22 - 2025-COMMCON-0000407
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 112 - Frame
2026-10-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-10-20 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-10-20 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 903 - Rough
2026-10-15 - 2025-MECH-0002214
09:00 AM - 11:00 PM: 904 - Final - Mechanical
2026-10-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-10-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-10-06 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-10-02 - 2026-FIRE-0002250
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-10-02 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-10-02 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 112 - Frame
2026-10-02 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-10-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-09-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-09-25 - 2025-COMMCON-0000407
11:00 AM - 01:00 PM: 112 - Frame
2026-09-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-22 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-18 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-09-17 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-17 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-17 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-15 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-15 - 2025-MECH-0002214
09:00 AM - 11:00 AM: 903 - Rough
2026-09-11 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-11 - 2025-PLUMB-0003580
12:00 PM - 03:00 PM: 401 - Rough
2026-09-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-09 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 903 - Rough
2026-09-09 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-09-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-09-03 - 2025-FIRE-0006529
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-09-03 - 2025-ELEC-0003540
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-09-02 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 112 - Frame
2026-09-02 - 2026-FIRE-0002250
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-02 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-02 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2026-FIRE-0002250
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-28 - 2025-FIRE-0006529
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-28 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-28 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-08-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-08-27 - 2025-MECH-0002214
09:00 AM - 11:00 AM: 903 - Rough
2026-08-26 - 2025-FIRE-0006529
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-26 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-26 - 2025-MECH-0002214
01:00 PM - 03:00 PM: 903 - Rough
2026-08-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-20 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-20 - 2025-ELEC-0003540
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-20 - 2025-FIRE-0006529
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
2026-08-13 - 2025-FIRE-0006529
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-13 - 2025-COMMCON-0000407
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-08-13 - 2025-ELEC-0003540
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-13 - 2025-MECH-0002214
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-FIRE-0006529
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-05 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-03 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-28 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-07-21 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-20 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-17 - 2025-PLUMB-0003580
08:00 AM - 10:00 AM: 401 - Rough
2026-07-16 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-14 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2025-FIRE-0006529
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-13 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-07-13 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-09 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-08 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-08 - 2025-ELEC-0003540
08:30 AM - 10:30 AM: 313 - Meter Release
2026-07-07 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-02 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 307 - Service Equipment
10:00 AM - 12:30 PM: 313 - Meter Release
2026-07-01 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-30 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-29 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-27 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-26 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-26 - 2025-ELEC-0003540
12:00 PM - 02:30 PM: 303 - Full Rough
2026-06-25 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-24 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-23 - 2025-COMMCON-0000407
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-06-23 - 2025-MECH-0002214
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-06-22 - 2025-ELEC-0003540
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-06-22 - 2025-FIRE-0006118
08:00 AM - 10:00 AM: 411 - Rough
5601 N Chester WAY
Recent Inspections
2026-10-26 - 2025-COMMCON-0001092
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-10-23 - 2025-FIRE-0006076
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-23 - 2026-FIRE-0000643
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-22 - 2026-COMMCON-0000256
11:30 AM - 01:30 PM: Document Review Inspection
11:30 AM - 01:30 PM: 108 - Final - Commercial
2026-10-22 - 2026-FIRE-0001884
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-10-22 - 2026-COMMCON-0000006
11:30 AM - 01:30 PM: 108 - Final - Commercial
2026-10-21 - 2026-FIRE-0001884
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-10-21 - 2025-COMMCON-0001092
08:30 AM - 09:30 AM: 109 - Other
2026-10-20 - 2026-ACCCON-0000008
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-10-20 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-10-16 - 2025-FIRE-0007400
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-16 - 2026-ACCCON-0000008
11:30 AM - 01:30 PM: 305 - Final - Access Control
2026-10-16 - 2026-FIRE-0001884
01:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-10-16 - 2026-FIRE-0002300
TBD: 303 - Full Rough
2026-10-15 - 2026-FIRE-0001884
12:30 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-10-15 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 109 - Other
2026-10-15 - 2025-PLUMB-0011316
12:30 PM - 03:00 PM: 402 - Final - Plumbing
2026-10-14 - 2026-FIRE-0000411
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-14 - 2025-PLUMB-0006031
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-14 - 2025-PLUMB-0008932
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-10-13 - 2026-FIRE-0001884
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-10-13 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 108 - Final - Commercial
2026-10-13 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-13 - 2025-PLUMB-0006031
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-10-13 - 2025-PLUMB-0008932
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-10-09 - 2026-COMMCON-0001942
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-09 - 2026-FIRE-0001884
12:30 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-10-09 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-09 - 2025-ELEC-0005360
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-09 - 2025-ELEC-0009778
TBD: 305 - Final - Electrical
2026-10-09 - 2025-ELEC-0010762
TBD: 305 - Final - Electrical
2026-10-09 - 2026-ELEC-0000436
TBD: 305 - Final - Electrical
2026-10-08 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: Document Review Inspection
11:30 AM - 01:30 PM: 108 - Final - Commercial
2026-10-08 - 2026-ROOFSIDE-0000943
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-10-08 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-06 - 2025-COMMCON-0001092
08:00 AM - 10:00 AM: Document Review Inspection
08:00 AM - 10:00 AM: 109 - Other
2026-10-05 - 2025-PLUMB-0006031
08:30 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-02 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-01 - 2025-PLUMB-0006031
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-30 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-30 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-30 - 2026-ELEC-0000568
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-30 - 2025-ELEC-0005360
08:00 AM - 10:00 AM: 302 - Partial Rough
TBD: 304 - Partial Final
2026-09-30 - 2026-FIRE-0001884
12:15 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-29 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 108 - Final - Commercial
12:00 PM - 02:00 PM: 112 - Frame
2026-09-28 - 2026-FIRE-0001884
10:15 AM - 12:15 PM: 412 - Final - Fire Suppression
2026-09-28 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 109 - Other
2026-09-28 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-25 - 2026-FIRE-0001884
10:15 AM - 12:15 PM: 412 - Final - Fire Suppression
2026-09-25 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 109 - Other
2026-09-25 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-09-25 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-24 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-24 - 2025-PLUMB-0006031
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-23 - 2025-FIRE-0006076
08:30 AM - 10:30 AM: 412 - Final - Fire Suppression
2026-09-23 - 2026-FIRE-0001884
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-09-23 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-22 - 2026-ELEC-0000568
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-21 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
11:30 AM - 01:30 PM: 109 - Other
2026-09-18 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-18 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-17 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-16 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-16 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-09-15 - 2025-PLUMB-0006031
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-09-15 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
2026-09-14 - 2025-COMMCON-0001092
09:30 AM - 11:30 AM: Document Review Inspection
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 112 - Frame
2026-09-14 - 2025-PLUMB-0006031
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-09-14 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-09-11 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-10 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-09-08 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-09-04 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-03 - 2026-FIRE-0001884
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-03 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-03 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-03 - 2025-MECH-0004130
11:00 AM - 01:00 PM: 903 - Rough
2026-09-03 - 2025-PLUMB-0006031
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-09-02 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-02 - 2025-PLUMB-0006031
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-09-01 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-31 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-28 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-27 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-27 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-08-26 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-21 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-21 - 2025-PLUMB-0006031
08:30 AM - 10:30 AM: 402 - Final - Plumbing
2026-08-21 - 2025-MECH-0004119
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-08-20 - 2025-COMMCON-0001092
09:30 AM - 11:30 AM: 107 - Drywall
2026-08-20 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-19 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-19 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-18 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-18 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-08-17 - 2025-COMMCON-0001092
09:30 AM - 11:30 AM: 112 - Frame
2026-08-17 - 2025-ELEC-0005360
08:30 AM - 10:30 AM: 304 - Partial Final
2026-08-14 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
2026-08-13 - 2025-COMMCON-0001092
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0005360
08:30 AM - 09:30 AM: 304 - Partial Final
2026-08-12 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-08-11 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-11 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 304 - Partial Final
2026-08-10 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-10 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 304 - Partial Final
2026-08-07 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-08-04 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-04 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-08-03 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-31 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-30 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-07-30 - 2025-MECH-0004119
11:00 AM - 01:00 PM: 903 - Rough
2026-07-29 - 2025-FIRE-0007400
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-29 - 2026-FIRE-0002300
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-29 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-07-29 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-28 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
12:00 PM - 02:00 PM: 200 - Blown Insulation
2026-07-28 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-27 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-24 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-23 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-22 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 107 - Drywall
2026-07-21 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-21 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-07-20 - 2025-COMMCON-0001092
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-17 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-17 - 2025-ELEC-0005360
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-17 - 2026-ELEC-0000568
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-16 - 2025-COMMCON-0001092
02:00 PM - 03:00 PM: 106 - Batt Insulation
02:00 PM - 03:00 PM: 107 - Drywall
2026-07-13 - 2026-FIRE-0002300
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-13 - 2026-ELEC-0000568
08:30 AM - 10:30 AM: 303 - Full Rough
TBD: 300 - Slab
TBD: 309 - Walls
2026-07-08 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-07 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-06 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-02 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-01 - 2025-COMMCON-0001092
12:00 PM - 02:00 PM: 107 - Drywall
2026-06-29 - 2025-COMMCON-0001092
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
2026-06-27 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-26 - 2025-COMMCON-0001092
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
2026-06-25 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-25 - 2025-COMMCON-0002658
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-06-24 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-23 - 2025-COMMCON-0001092
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-23 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 301 - Underground
2026-06-23 - 2025-MECH-0004119
09:00 AM - 11:00 AM: 903 - Rough
2026-06-22 - 2025-FIRE-0007400
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0000411
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-22 - 2025-ELEC-0005360
12:00 PM - 02:30 PM: 302 - Partial Rough
3301 W 38th Ave
Recent Inspections
2026-10-27 - 2025-PLUMB-0010677
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-10-26 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-26 - 2025-ELEC-0010764
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-26 - 2026-ELEC-0010116
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-14 - 2025-PLUMB-0010677
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-10-13 - 2025-FIRE-0003401
12:00 PM - 02:30 PM: 412 - Final - Fire Suppression
2026-10-13 - 2025-PLUMB-0010677
12:00 PM - 02:30 PM: 402 - Final - Plumbing
2026-10-09 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 304 - Partial Final
2026-10-08 - 2022-ELEC-0005607
08:30 AM - 10:30 AM: 304 - Partial Final
2026-10-08 - 2025-PLUMB-0010677
10:00 AM - 12:30 PM: 402 - Final - Plumbing
2026-10-06 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 304 - Partial Final
2026-10-02 - 2025-FIRE-0003401
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-10-02 - 2022-ELEC-0005607
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-01 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 304 - Partial Final
2026-09-29 - 2022-MECH-0005774
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-28 - 2025-FIRE-0003401
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-09-25 - 2022-ELEC-0005607
08:30 AM - 10:30 AM: 302 - Partial Rough
08:30 AM - 10:30 AM: 304 - Partial Final
2026-09-25 - 2025-PLUMB-0010677
11:00 AM - 02:00 PM: 402 - Final - Plumbing
2026-09-17 - 2024-FIRE-0001921
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-17 - 2024-PLUMB-0003201
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-17 - 2026-FIRE-0004943
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-16 - 2024-FIRE-0001921
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-16 - 2025-BOILERAC-0001003
08:30 AM - 11:00 PM: 704 - Final - Boiler AC
2026-09-16 - 2026-FIRE-0004943
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-16 - 2024-PLUMB-0003201
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-16 - 2025-PLUMB-0010677
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-16 - 2022-MECH-0005774
TBD: 904 - Final - Mechanical
2026-09-15 - 2022-ELEC-0005607
09:00 AM - 12:00 PM: 304 - Partial Final
2026-09-14 - 2026-FIRE-0004943
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-14 - 2025-PLUMB-0010677
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-09 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 304 - Partial Final
2026-09-08 - 2025-PLUMB-0010677
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-03 - 2024-FIRE-0001921
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-09-03 - 2026-FIRE-0004943
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-09-02 - 2024-FIRE-0001921
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-08-28 - 2022-ELEC-0005607
08:30 AM - 10:30 AM: 308 - Ceiling
2026-08-27 - 2021-COMMCON-0003127
09:00 AM - 11:00 AM: 109 - Other
2026-08-26 - 2021-COMMCON-0003127
09:00 AM - 11:00 AM: 109 - Other
2026-07-27 - 2021-COMMCON-0003127
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-14 - 2026-FIRE-0000662
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-14 - 2022-ELEC-0005607
11:00 AM - 01:00 PM: 308 - Ceiling
2026-07-10 - 2026-FIRE-0000662
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-10 - 2022-ELEC-0005607
09:00 AM - 12:00 PM: 308 - Ceiling
2026-07-06 - 2025-FIRE-0003401
12:30 PM - 03:00 PM: 411 - Rough
2026-07-01 - 2026-FIRE-0000662
08:30 AM - 11:30 AM: 302 - Partial Rough
2026-07-01 - 2022-ELEC-0005607
08:30 AM - 11:30 AM: 308 - Ceiling
2026-06-22 - 2021-COMMCON-0003127
11:00 AM - 01:00 PM: 107 - Drywall
2115 Glenarm PL
Recent Inspections
2026-10-27 - 2024-ELEC-0010108
08:00 AM - 10:30 AM: 305 - Final - Electrical
2026-10-26 - 2025-FIRE-0005052
08:30 AM - 10:30 AM: 303 - Full Rough
2026-10-26 - 2026-FIRE-0005792
08:30 AM - 10:30 AM: 303 - Full Rough
2026-10-21 - 2025-FIRE-0006508
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-09-04 - 2024-ELEC-0010108
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-01 - 2024-ELEC-0010108
08:00 AM - 10:30 AM: 305 - Final - Electrical
1575 N Lowell BLVD
Recent Inspections
2026-10-27 - 2025-RESCON-0001669
09:00 AM - 12:00 PM: Document Review
2026-10-27 - 2025-RESCON-0001670
TBD: Document Review
2026-10-27 - 2026-MECH-0001685
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-27 - 2026-MECH-0001686
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-27 - 2026-MECH-0001687
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-27 - 2026-MECH-0001688
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-27 - 2026-MECH-0001689
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-26 - 2025-RESCON-0001669
09:00 AM - 11:00 AM: 109 - Other
2026-10-26 - 2026-MECH-0001684
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-22 - 2026-MECH-0002204
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2026-MECH-0002207
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2026-MECH-0002208
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-21 - 2026-MECH-0002201
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-21 - 2026-MECH-0002202
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-21 - 2026-MECH-0002203
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-16 - 2025-PLUMB-0011260
01:00 PM - 03:00 PM: 401 - Rough
2026-10-16 - 2025-PLUMB-0011261
01:00 PM - 03:00 PM: 401 - Rough
2026-10-15 - 2026-MECH-0002200
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-15 - 2025-RESCON-0001629
10:00 AM - 12:00 PM: 109 - Other
2026-10-15 - 2025-PLUMB-0011263
11:00 AM - 01:00 PM: 401 - Rough
2026-10-15 - 2025-PLUMB-0011322
11:00 AM - 01:00 PM: 401 - Rough
2026-10-15 - 2025-PLUMB-0011324
11:00 AM - 01:00 PM: 401 - Rough
2026-10-15 - 2025-PLUMB-0011326
11:00 AM - 01:00 PM: 401 - Rough
2026-10-15 - 2025-PLUMB-0011329
11:00 AM - 01:00 PM: 401 - Rough
2026-10-13 - 2026-MECH-0002200
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-06 - 2025-PLUMB-0011250
11:00 AM - 02:00 PM: 401 - Rough
2026-10-06 - 2025-PLUMB-0011253
11:00 AM - 02:00 PM: 401 - Rough
2026-10-06 - 2025-PLUMB-0011255
11:00 AM - 02:00 PM: 401 - Rough
2026-10-06 - 2025-PLUMB-0011256
11:00 AM - 02:00 PM: 401 - Rough
2026-10-06 - 2025-PLUMB-0011257
11:00 AM - 02:00 PM: 401 - Rough
2026-10-06 - 2025-PLUMB-0011258
11:00 AM - 02:00 PM: 401 - Rough
2026-10-05 - 2026-MECH-0001684
10:00 AM - 12:00 PM: 903 - Rough
2026-09-11 - 2025-PLUMB-0011363
11:00 AM - 01:00 PM: 401 - Rough
2026-09-11 - 2025-PLUMB-0011365
11:00 AM - 01:00 PM: 401 - Rough
2026-09-11 - 2025-PLUMB-0011366
11:00 AM - 01:00 PM: 401 - Rough
2026-09-11 - 2025-PLUMB-0011367
11:00 AM - 01:00 PM: 401 - Rough
2026-09-11 - 2025-PLUMB-0011368
11:00 AM - 01:00 PM: 401 - Rough
2026-09-11 - 2025-PLUMB-0011388
11:00 AM - 01:00 PM: 401 - Rough
2026-09-10 - 2025-RESCON-0001642
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-10 - 2025-RESCON-0001643
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-10 - 2025-RESCON-0001629
08:00 AM - 10:00 AM: 107 - Drywall
2026-09-10 - 2025-RESCON-0001630
08:00 AM - 10:00 AM: 107 - Drywall
2026-09-09 - 2025-RESCON-0001642
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-09 - 2025-RESCON-0001643
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-08 - 2025-RESCON-0001642
10:00 AM - 12:00 PM: 107 - Drywall
2026-09-08 - 2025-RESCON-0001643
10:00 AM - 12:00 PM: 107 - Drywall
2026-09-08 - 2026-ROOFSIDE-0000802
10:00 AM - 12:00 PM: 206 - Other
2026-09-03 - 2026-MECH-0001684
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-09-02 - 2025-RESCON-0001644
08:30 AM - 10:30 AM: 107 - Drywall
2026-09-02 - 2025-RESCON-0001645
08:30 AM - 10:30 AM: 107 - Drywall
2026-09-02 - 2025-RESCON-0001646
08:30 AM - 10:30 AM: 107 - Drywall
2026-08-31 - 2025-RESCON-0001629
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-31 - 2025-RESCON-0001630
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-28 - 2025-RESCON-0001625
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-28 - 2025-RESCON-0001626
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-28 - 2025-RESCON-0001627
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-28 - 2025-RESCON-0001629
08:30 AM - 05:30 PM: 112 - Frame
2026-08-28 - 2025-RESCON-0001630
08:30 AM - 05:30 PM: 112 - Frame
2026-08-28 - 2026-PLUMB-0006030
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-08-28 - 2026-PLUMB-0006031
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-08-27 - 2025-RESCON-0001625
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-27 - 2025-RESCON-0001626
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-27 - 2025-RESCON-0001627
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-27 - 2026-MECH-0001697
08:30 AM - 11:00 AM: 903 - Rough
2026-08-27 - 2026-PLUMB-0006031
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2025-RESCON-0001615
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-26 - 2025-RESCON-0001623
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-26 - 2025-RESCON-0001624
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-26 - 2025-PLUMB-0011218
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011219
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011220
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011221
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2025-PLUMB-0011222
11:00 AM - 01:00 PM: 401 - Rough
2026-08-26 - 2026-ELEC-0002816
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-08-26 - 2026-PLUMB-0006030
11:00 AM - 01:00 PM: 401 - Rough
2026-08-20 - 2025-RESCON-0001642
08:00 AM - 10:00 AM: 112 - Frame
2026-08-20 - 2025-RESCON-0001643
08:00 AM - 10:00 AM: 112 - Frame
2026-08-20 - 2025-RESCON-0001644
08:00 AM - 10:00 AM: 106 - Batt Insulation
08:00 AM - 10:00 AM: 200 - Blown Insulation
2026-08-20 - 2025-RESCON-0001645
08:00 AM - 10:00 AM: 106 - Batt Insulation
08:00 AM - 10:00 AM: 200 - Blown Insulation
2026-08-20 - 2025-RESCON-0001646
08:00 AM - 10:00 AM: 106 - Batt Insulation
08:00 AM - 10:00 AM: 200 - Blown Insulation
2026-08-20 - 2026-MECH-0001698
12:00 PM - 02:00 PM: 903 - Rough
2026-08-20 - 2026-PLUMB-0006028
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-08-20 - 2026-PLUMB-0006029
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-08-19 - 2025-PLUMB-0011434
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011435
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011436
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011437
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011438
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011439
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2025-PLUMB-0011440
11:00 AM - 01:00 PM: 401 - Rough
2026-08-19 - 2026-PLUMB-0006028
09:00 AM - 11:00 AM: 401 - Rough
2026-08-19 - 2026-PLUMB-0006029
09:00 AM - 11:00 AM: 401 - Rough
2026-08-18 - 2025-RESCON-0001644
08:30 AM - 05:30 PM: 112 - Frame
2026-08-18 - 2026-ROOFSIDE-0000798
10:00 AM - 12:00 PM: 206 - Other
2026-08-18 - 2026-MECH-0001700
10:00 AM - 12:00 PM: 903 - Rough
2026-08-17 - 2025-RESCON-0001645
09:00 AM - 11:00 AM: 112 - Frame
2026-08-17 - 2025-RESCON-0001646
09:00 AM - 11:00 AM: 112 - Frame
2026-08-17 - 2026-PLUMB-0006028
09:00 AM - 11:00 AM: 401 - Rough
2026-08-14 - 2026-MECH-0001699
10:00 AM - 12:00 PM: 903 - Rough
2026-08-14 - 2026-MECH-0001701
10:00 AM - 12:00 PM: 903 - Rough
2026-08-14 - 2026-MECH-0001702
10:00 AM - 12:00 PM: 903 - Rough
2026-08-14 - 2026-PLUMB-0006032
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-08-13 - 2025-RESCON-0001627
08:30 AM - 05:30 PM: 106 - Batt Insulation
08:30 AM - 05:30 PM: 200 - Blown Insulation
2026-08-13 - 2025-RESCON-0001663
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-13 - 2025-RESCON-0001667
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-13 - 2025-RESCON-0001668
08:30 AM - 05:30 PM: 107 - Drywall
2026-08-13 - 2026-PLUMB-0006032
08:30 AM - 09:30 AM: 401 - Rough
2026-08-12 - 2025-RESCON-0001625
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-12 - 2025-RESCON-0001626
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-12 - 2025-RESCON-0001627
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-12 - 2025-RESCON-0001663
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-12 - 2025-RESCON-0001665
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-12 - 2025-RESCON-0001667
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-12 - 2025-RESCON-0001668
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-11 - 2025-RESCON-0001664
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-11 - 2025-RESCON-0001665
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-11 - 2025-RESCON-0001666
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-10 - 2025-RESCON-0001611
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-10 - 2025-RESCON-0001612
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-10 - 2025-RESCON-0001613
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-10 - 2025-RESCON-0001615
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-10 - 2025-RESCON-0001623
10:00 AM - 12:00 PM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-08-10 - 2025-RESCON-0001624
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-08-10 - 2026-ROOFSIDE-0000793
09:00 AM - 11:00 AM: 206 - Other
2026-08-06 - 2025-RESCON-0000383
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-06 - 2025-RESCON-0001610
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-06 - 2025-RESCON-0001626
09:00 AM - 11:00 AM: 112 - Frame
2026-08-06 - 2025-RESCON-0001627
09:00 AM - 11:00 AM: 112 - Frame
2026-08-05 - 2025-RESCON-0001614
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-05 - 2025-RESCON-0001623
11:00 AM - 01:00 PM: 112 - Frame
2026-08-05 - 2025-RESCON-0001624
11:00 AM - 01:00 PM: 112 - Frame
2026-08-05 - 2025-RESCON-0001625
11:00 AM - 01:00 PM: 112 - Frame
2026-08-05 - 2026-MECH-0001701
01:00 PM - 03:00 PM: 903 - Rough
2026-08-05 - 2026-MECH-0001702
01:00 PM - 03:00 PM: 903 - Rough
2026-08-04 - 2025-RESCON-0001623
10:00 AM - 12:00 PM: 112 - Frame
2026-08-04 - 2025-RESCON-0001624
10:00 AM - 12:00 PM: 112 - Frame
2026-08-04 - 2026-ROOFSIDE-0000793
10:00 AM - 12:00 PM: 206 - Other
2026-08-03 - 2025-RESCON-0001615
10:00 AM - 12:00 PM: 112 - Frame
2026-08-03 - 2025-RESCON-0001623
10:00 AM - 12:00 PM: 112 - Frame
2026-08-03 - 2025-RESCON-0001624
10:00 AM - 12:00 PM: 112 - Frame
2026-08-03 - 2025-RESCON-0001667
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-08-03 - 2025-RESCON-0001668
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-31 - 2025-RESCON-0001666
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-30 - 2025-RESCON-0001665
08:30 AM - 05:30 PM: 106 - Batt Insulation
08:30 AM - 05:30 PM: 200 - Blown Insulation
2026-07-29 - 2025-RESCON-0001663
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-29 - 2025-RESCON-0001664
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-29 - 2025-RESCON-0001665
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-28 - 2025-PLUMB-0011260
08:00 AM - 11:00 AM: 401 - Rough
2026-07-28 - 2025-PLUMB-0011261
08:00 AM - 11:00 AM: 401 - Rough
2026-07-27 - 2025-RESCON-0001612
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001663
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001664
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001665
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001613
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001614
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-27 - 2025-RESCON-0001666
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-27 - 2025-RESCON-0001667
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-27 - 2025-RESCON-0001668
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-27 - 2025-PLUMB-0011263
10:00 AM - 12:00 PM: 401 - Rough
2026-07-27 - 2025-PLUMB-0011322
10:00 AM - 12:00 PM: 401 - Rough
2026-07-27 - 2025-PLUMB-0011324
10:00 AM - 12:00 PM: 401 - Rough
2026-07-27 - 2025-PLUMB-0011326
10:00 AM - 12:00 PM: 401 - Rough
2026-07-27 - 2025-PLUMB-0011329
10:00 AM - 12:00 PM: 401 - Rough
2026-07-24 - 2025-RESCON-0001612
10:00 AM - 12:00 PM: 109 - Other
2026-07-24 - 2025-RESCON-0001663
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-24 - 2025-RESCON-0001664
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-24 - 2025-RESCON-0001665
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-07-24 - 2026-ROOFSIDE-0000793
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-07-24 - 2026-ROOFSIDE-0000798
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-07-23 - 2025-RESCON-0001610
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-23 - 2025-RESCON-0001611
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-23 - 2025-RESCON-0001612
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-23 - 2025-RESCON-0001613
11:00 AM - 01:00 PM: 109 - Other
2026-07-23 - 2025-RESCON-0001614
08:30 AM - 05:30 PM: 109 - Other
2026-07-23 - 2026-ROOFSIDE-0000803
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-23 - 2026-ROOFSIDE-0000805
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-22 - 2025-RESCON-0000383
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-22 - 2025-RESCON-0001610
11:00 AM - 01:00 PM: 109 - Other
2026-07-22 - 2025-RESCON-0001611
11:00 AM - 01:00 PM: 109 - Other
2026-07-22 - 2026-MECH-0001694
10:00 AM - 12:00 PM: 903 - Rough
2026-07-21 - 2025-RESCON-0001611
11:00 AM - 01:00 PM: 112 - Frame
2026-07-21 - 2025-RESCON-0001613
11:00 AM - 01:00 PM: 112 - Frame
2026-07-21 - 2025-RESCON-0001614
11:00 AM - 01:00 PM: 112 - Frame
2026-07-20 - 2025-RESCON-0001610
10:00 AM - 12:00 PM: 112 - Frame
2026-07-20 - 2025-RESCON-0001611
10:00 AM - 12:00 PM: 112 - Frame
2026-07-20 - 2025-RESCON-0001612
10:00 AM - 12:00 PM: 112 - Frame
2026-07-20 - 2026-MECH-0001691
11:00 AM - 01:00 PM: 903 - Rough
2026-07-20 - 2026-MECH-0001692
11:00 AM - 01:00 PM: 903 - Rough
2026-07-20 - 2026-MECH-0001693
11:00 AM - 01:00 PM: 903 - Rough
2026-07-17 - 2025-RESCON-0000383
10:00 AM - 12:00 PM: 112 - Frame
2026-07-17 - 2025-RESCON-0001610
10:00 AM - 12:00 PM: 112 - Frame
2026-07-17 - 2025-RESCON-0001611
10:00 AM - 12:00 PM: 112 - Frame
2026-07-17 - 2026-MECH-0001690
10:00 AM - 12:00 PM: 903 - Rough
2026-07-17 - 2026-MECH-0001695
10:00 AM - 12:00 PM: 903 - Rough
2026-07-16 - 2025-RESCON-0001669
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2025-RESCON-0001629
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2025-RESCON-0001630
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2025-RESCON-0001669
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2025-RESCON-0001670
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2025-RESCON-0001671
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0000383
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001610
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001611
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001612
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001613
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001614
11:00 AM - 01:00 PM: 112 - Frame
2026-07-14 - 2025-RESCON-0001629
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001630
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001642
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001643
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001644
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001645
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001646
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001670
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-RESCON-0001671
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-14 - 2025-PLUMB-0011250
09:00 AM - 11:00 AM: 401 - Rough
2026-07-14 - 2025-PLUMB-0011253
09:00 AM - 11:00 AM: 401 - Rough
2026-07-14 - 2025-PLUMB-0011255
11:00 AM - 01:00 PM: 401 - Rough
2026-07-14 - 2025-PLUMB-0011256
11:00 AM - 01:00 PM: 401 - Rough
2026-07-14 - 2025-PLUMB-0011257
11:00 AM - 01:00 PM: 401 - Rough
2026-07-14 - 2025-PLUMB-0011258
11:00 AM - 01:00 PM: 401 - Rough
2026-07-13 - 2025-RESCON-0001672
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-13 - 2025-RESCON-0001674
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-13 - 2026-MECH-0002195
08:30 AM - 11:00 AM: 903 - Rough
2026-07-13 - 2026-MECH-0002197
08:30 AM - 11:00 AM: 903 - Rough
2026-07-13 - 2026-MECH-0002198
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2025-RESCON-0001673
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-10 - 2025-RESCON-0001674
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-10 - 2025-RESCON-0001675
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-10 - 2026-MECH-0001685
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-MECH-0001686
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-MECH-0001689
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-MECH-0002193
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-MECH-0002196
08:30 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-MECH-0002199
08:30 AM - 11:00 AM: 903 - Rough
2026-07-09 - 2026-ROOFSIDE-0000793
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-09 - 2026-ROOFSIDE-0000803
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-09 - 2026-ROOFSIDE-0000805
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-09 - 2025-RESCON-0001663
11:00 AM - 01:00 PM: 109 - Other
2026-07-09 - 2025-RESCON-0001664
11:00 AM - 01:00 PM: 109 - Other
2026-07-09 - 2025-RESCON-0001665
11:00 AM - 01:00 PM: 109 - Other
2026-07-09 - 2025-RESCON-0001666
11:00 AM - 01:00 PM: 109 - Other
2026-07-09 - 2025-RESCON-0001667
11:00 AM - 01:00 PM: 109 - Other
2026-07-09 - 2025-RESCON-0001668
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001669
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001670
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001671
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001672
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001673
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001674
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2025-RESCON-0001675
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2026-ROOFSIDE-0000793
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-08 - 2026-ROOFSIDE-0000803
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-08 - 2026-ROOFSIDE-0000805
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-08 - 2026-MECH-0001684
10:00 AM - 12:00 PM: 903 - Rough
2026-07-08 - 2026-MECH-0001687
10:00 AM - 12:00 PM: 903 - Rough
2026-07-08 - 2026-MECH-0001688
10:00 AM - 12:00 PM: 903 - Rough
2026-07-07 - 2025-RESCON-0001669
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-07 - 2025-PLUMB-0011363
11:00 AM - 01:00 PM: 401 - Rough
2026-07-07 - 2025-PLUMB-0011365
11:00 AM - 01:00 PM: 401 - Rough
2026-07-07 - 2025-PLUMB-0011366
11:00 AM - 01:00 PM: 401 - Rough
2026-07-07 - 2025-PLUMB-0011367
11:00 AM - 01:00 PM: 401 - Rough
2026-07-07 - 2025-PLUMB-0011368
11:00 AM - 01:00 PM: 401 - Rough
2026-07-07 - 2025-PLUMB-0011388
11:00 AM - 01:00 PM: 401 - Rough
2026-07-06 - 2025-RESCON-0001669
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 200 - Blown Insulation
2026-07-02 - 2025-FIRE-0007130
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2025-RESCON-0001629
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001630
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001642
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001643
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001644
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001645
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001646
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001669
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001670
01:00 PM - 03:00 PM: 112 - Frame
2026-07-02 - 2025-RESCON-0001671
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-07-02 - 2025-RESCON-0001675
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-07-02 - 2026-FIRE-0000844
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2026-FIRE-0000846
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2026-FIRE-0000847
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2026-FIRE-0000849
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2026-FIRE-0000850
09:00 AM - 11:00 AM: 411 - Rough
2026-07-02 - 2026-FIRE-0001800
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001801
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001802
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001803
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001805
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001817
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2026-FIRE-0001818
11:00 AM - 01:00 PM: 411 - Rough
2026-07-02 - 2025-PLUMB-0011221
11:00 AM - 01:00 PM: 401 - Rough
2026-07-02 - 2025-PLUMB-0011222
11:00 AM - 01:00 PM: 401 - Rough
2026-07-01 - 2025-RESCON-0001629
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001630
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001642
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001643
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001644
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001645
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001646
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-01 - 2025-RESCON-0001669
11:00 AM - 01:00 PM: 112 - Frame
2026-07-01 - 2025-RESCON-0001670
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-01 - 2025-RESCON-0001674
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-07-01 - 2025-PLUMB-0011218
11:00 AM - 01:00 PM: 401 - Rough
2026-07-01 - 2025-PLUMB-0011219
11:00 AM - 01:00 PM: 401 - Rough
2026-07-01 - 2025-PLUMB-0011220
11:00 AM - 01:00 PM: 401 - Rough
2026-06-30 - 2025-RESCON-0001629
09:00 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2025-RESCON-0001630
09:00 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2025-RESCON-0001642
09:00 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2025-RESCON-0001643
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-30 - 2025-RESCON-0001644
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-30 - 2025-RESCON-0001645
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-30 - 2025-RESCON-0001646
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-30 - 2025-RESCON-0001671
09:00 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2025-RESCON-0001672
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 200 - Blown Insulation
2026-06-30 - 2025-RESCON-0001673
09:00 AM - 11:00 AM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-06-29 - 2025-RESCON-0001629
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001642
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001643
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001644
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001645
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001646
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001670
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001671
10:30 AM - 12:30 PM: 112 - Frame
2026-06-29 - 2025-RESCON-0001675
10:30 AM - 12:30 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001629
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001630
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001642
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001643
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001644
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001645
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001646
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001673
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-RESCON-0001674
10:00 AM - 12:00 PM: 112 - Frame
2026-06-25 - 2025-RESCON-0001672
11:00 AM - 01:00 PM: 112 - Frame
4811 W 10th Ave
Recent Inspections
2026-10-27 - 2024-RESCON-0000187
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-26 - 2024-RESCON-0000187
TBD: 113 - Pre Construction Meeting
2026-10-21 - 2024-RESCON-0000187
TBD: 113 - Pre Construction Meeting
2026-10-20 - 2024-RESCON-0000187
TBD: 113 - Pre Construction Meeting