1027 N Kalamath ST
Recent Inspections
2026-06-12 - 2025-ELEC-0000008
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-06-12 - 2025-ELEC-0004964
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-06-12 - 2025-ELEC-0005060
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-04-10 - 2025-ELEC-0000008
08:00 AM - 10:00 AM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-04-10 - 2025-ELEC-0004964
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-04-10 - 2025-ELEC-0005060
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-02-13 - 2025-ELEC-0000008
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-02-13 - 2025-ELEC-0004964
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-02-13 - 2025-ELEC-0005060
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
6385 E Hampden AVE
Recent Inspections
2026-06-12 - 2025-COMMCON-0002592
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-10 - 2025-COMMCON-0002592
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-06-09 - 2026-MECH-0001498
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-06-09 - 2026-FIRE-0003164
08:30 AM - 05:30 PM: 303 - Full Rough
2026-06-08 - 2026-COMMCON-0000336
10:00 AM - 09:30 AM: 108 - Final - Commercial
2026-06-05 - 2026-BOILERAC-0000189
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-06-05 - 2026-MECH-0001498
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-06-05 - 2025-COMMCON-0002592
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-06-05 - 2026-COMMCON-0000336
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-06-04 - 2026-BOILERAC-0000189
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-06-04 - 2026-FIRE-0002795
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-06-04 - 2026-MECH-0001498
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-06-04 - 2026-PLUMB-0002100
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-06-03 - 2026-COMMCON-0000336
10:00 AM - 12:00 PM: 107 - Drywall
TBD: 109 - Other
2026-06-03 - 2026-ELEC-0002676
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-02 - 2026-COMMCON-0000336
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-01 - 2026-FIRE-0002815
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-01 - 2026-COMMCON-0000336
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-01 - 2026-ELEC-0002676
12:00 PM - 02:00 PM: 308 - Ceiling
2026-05-29 - 2026-FIRE-0002795
08:30 AM - 11:30 AM: 411 - Rough
2026-05-29 - 2026-ELEC-0002676
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-05-21 - 2026-COMMCON-0000336
09:00 AM - 11:00 AM: 107 - Drywall
2026-05-21 - 2026-PLUMB-0002100
08:30 AM - 11:30 AM: 401 - Rough
2026-05-20 - 2026-COMMCON-0000336
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-05-20 - 2026-MECH-0001498
11:00 AM - 01:00 PM: 903 - Rough
2026-05-19 - 2026-COMMCON-0000336
08:30 AM - 09:30 AM: 112 - Frame
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-19 - 2026-ELEC-0002676
10:00 AM - 12:00 PM: 308 - Ceiling
2026-05-18 - 2026-COMMCON-0000336
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 112 - Frame
2026-05-18 - 2026-ELEC-0002676
08:30 AM - 09:30 AM: 303 - Full Rough
2026-05-18 - 2026-PLUMB-0002100
08:30 AM - 11:30 AM: 401 - Rough
2026-05-15 - 2026-COMMCON-0000336
08:30 AM - 09:30 AM: 113 - Pre Construction Meeting
2026-05-14 - 2025-COMMCON-0002592
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-13 - 2026-FIRE-0000863
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-13 - 2025-ELEC-0013435
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-05-13 - 2026-ELEC-0003858
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-05-13 - 2026-PLUMB-0002100
08:30 AM - 11:30 AM: 400 - Groundwork
2026-04-24 - 2026-FIRE-0001655
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-04-24 - 2025-ELEC-0013435
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-04-24 - 2025-PLUMB-0011021
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-04-23 - 2025-ELEC-0013435
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-04-17 - 2025-COMMCON-0002592
12:00 PM - 02:00 PM: 112 - Frame
2026-04-16 - 2025-ELEC-0013435
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-16 - 2025-MECH-0008311
11:00 AM - 01:00 PM: 903 - Rough
2026-04-16 - 2025-COMMCON-0002592
09:00 AM - 11:00 AM: 112 - Frame
2026-04-09 - 2026-FIRE-0001655
08:30 AM - 11:30 AM: 411 - Rough
2026-04-09 - 2025-ELEC-0013435
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-08 - 2025-PLUMB-0011021
08:30 AM - 11:30 AM: 401 - Rough
2026-03-31 - 2025-PLUMB-0011021
08:30 AM - 11:30 AM: 403 - Pressure Test
08:30 AM - 11:30 AM: 405 - Meter Release
2026-03-26 - 2025-PLUMB-0011021
08:30 AM - 11:30 AM: 400 - Groundwork
2026-03-23 - 2025-PLUMB-0011021
08:30 AM - 11:30 AM: 400 - Groundwork
2026-02-12 - 2025-COMMCON-0002592
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2980 S Madison ST
Recent Inspections
2026-06-12 - 2026-ROOFSIDE-0000255
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-04-27 - 2025-RESCON-0002038
11:00 AM - 01:00 PM: 111 - Exterior Lath
2026-03-23 - 2025-RESCON-0002038
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-10 - 2025-RESCON-0002038
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-03-10 - 2026-ROOFSIDE-0000255
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-03-05 - 2025-RESCON-0002038
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-03-04 - 2025-RESCON-0002038
08:30 AM - 05:30 PM: 109 - Other
08:30 AM - 05:30 PM: 112 - Frame
2026-03-02 - 2026-ELEC-0001216
10:30 AM - 01:00 PM: 303 - Full Rough
10:30 AM - 01:00 PM: 313 - Meter Release
2026-02-24 - 2026-MECH-0001088
08:30 AM - 11:30 AM: 901 - Pressure Test
08:30 AM - 11:30 AM: 904 - Final - Mechanical
08:30 AM - 11:30 AM: 905 - Meter Release
2026-02-24 - 2026-MECH-0001164
11:00 AM - 01:00 PM: 903 - Rough
2026-02-12 - 2025-PLUMB-0010813
08:30 AM - 11:30 AM: 401 - Rough
2026-02-12 - 2026-ELEC-0001216
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-02-12 - 2026-MECH-0000745
11:00 AM - 01:00 PM: 903 - Rough
1420 S Elizabeth ST
Recent Inspections
2026-06-12 - 2026-MECH-0003548
09:00 AM - 11:00 AM: 903 - Rough
2026-06-11 - 2026-MECH-0002497
11:00 AM - 01:00 PM: 903 - Rough
2026-06-11 - 2026-PLUMB-0001196
10:00 AM - 12:00 PM: 401 - Rough
2026-06-10 - 2026-MECH-0001141
08:30 AM - 09:30 AM: 903 - Rough
2026-06-10 - 2026-PLUMB-0001196
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 405 - Meter Release
2026-04-06 - 2025-RESCON-0003636
10:30 AM - 12:30 PM: 105 - Exterior Sheathing
2026-03-17 - 2025-RESCON-0004008
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-02-23 - 2026-MECH-0001141
08:30 AM - 09:30 AM: 900 - Groundwork
2026-02-17 - 2025-RESCON-0003636
10:00 AM - 12:00 PM: 116 - Building Slab
2026-02-17 - 2026-PLUMB-0001288
08:30 AM - 11:30 AM: 402 - Final - Plumbing
08:30 AM - 11:30 AM: 404 - Water Service
2026-02-12 - 2026-PLUMB-0001196
08:30 AM - 11:30 AM: 400 - Groundwork
3131 E Alameda AVE
Recent Inspections
2026-06-12 - 2026-ELEC-0004343
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-12 - 2026-ELEC-0005216
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-11 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 112 - Frame
2026-06-05 - 2025-COMMCON-0001763
01:00 PM - 03:00 PM: 112 - Frame
2026-06-04 - 2025-PLUMB-0007421
10:00 AM - 12:00 PM: 401 - Rough
2026-05-08 - 2026-COMMCON-0000840
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-04-29 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-27 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 112 - Frame
2026-04-23 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 112 - Frame
2026-04-22 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 112 - Frame
2026-04-21 - 2026-FIRE-0002002
12:30 PM - 03:00 PM: 411 - Rough
2026-04-14 - 2025-ELEC-0012332
10:00 AM - 12:00 PM: 303 - Full Rough
TBD: 308 - Ceiling
TBD: 309 - Walls
2026-04-09 - 2026-ELEC-0002113
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-04-09 - 2026-ELEC-0001255
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-04-03 - 2026-RESCON-0000939
12:30 PM - 02:30 PM: 113 - Pre Construction Meeting
2026-03-26 - 2025-PLUMB-0007421
10:00 AM - 12:00 PM: 401 - Rough
2026-03-24 - 2026-ELEC-0001081
11:00 AM - 01:00 PM: 305 - Final - Electrical
TBD: 307 - Service Equipment
2026-03-24 - 2026-PLUMB-0001137
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-03-19 - 2026-COMMCON-0000385
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-18 - 2025-PLUMB-0007421
08:00 AM - 10:00 AM: 400 - Groundwork
2026-03-17 - 2025-ELEC-0012332
09:00 AM - 11:00 AM: 301 - Underground
2026-03-17 - 2025-PLUMB-0007421
01:00 PM - 03:00 PM: 400 - Groundwork
2026-03-16 - 2025-PLUMB-0007421
08:30 AM - 11:30 AM: 400 - Groundwork
2026-03-10 - 2025-COMMCON-0001865
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-03-06 - 2025-ELEC-0009606
09:00 AM - 11:00 PM: 305 - Final - Electrical
- TBD: 307 - Service Equipment
2026-03-05 - 2025-BOILERAC-0000661
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-03-05 - 2025-ELEC-0009606
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-03-05 - 2025-MECH-0005714
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-03-05 - 2025-PLUMB-0007700
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-03-05 - 2026-COMMCON-0000248
11:00 AM - 01:00 PM: 112 - Frame
2026-03-05 - 2026-COMMCON-0000385
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-04 - 2025-ELEC-0009606
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-03-04 - 2025-PLUMB-0007700
08:30 AM - 09:30 AM: 402 - Final - Plumbing
2026-03-04 - 2026-COMMCON-0000248
08:30 AM - 09:30 AM: 112 - Frame
2026-03-04 - 2026-COMMCON-0000385
08:30 AM - 09:30 AM: 107 - Drywall
2026-03-03 - 2026-COMMCON-0000385
08:30 AM - 09:30 AM: 107 - Drywall
2026-02-25 - 2026-COMMCON-0000248
09:00 AM - 11:00 AM: 112 - Frame
2026-02-24 - 2026-PLUMB-0001147
10:00 AM - 12:00 PM: 401 - Rough
2026-02-20 - 2026-COMMCON-0000248
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-02-19 - 2026-PLUMB-0001137
01:00 PM - 03:00 PM: 401 - Rough
2026-02-13 - 2025-COMMCON-0001763
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-02-13 - 2026-ELEC-0000747
10:00 AM - 12:00 PM: 303 - Full Rough
2026-02-13 - 2026-ELEC-0001081
10:00 AM - 12:00 PM: 303 - Full Rough
2026-02-12 - 2025-COMMCON-0001763
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-02-12 - 2026-PLUMB-0001190
12:30 PM - 02:30 PM: 404 - Water Service
9100 Pena Blvd
Recent Inspections
2026-06-12 - 2026-FIRE-0000447
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-06-12 - 2026-FIRE-0001204
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-06-12 - 2025-ELEC-0009324
08:30 AM - 09:30 AM: 308 - Ceiling
2026-06-12 - 2025-ELEC-0012355
08:30 AM - 09:30 AM: 308 - Ceiling
2026-06-11 - 2026-ACCCON-0000074
01:00 AM - 03:00 PM: 304 - Partial Final
2026-06-09 - 2026-FIRE-0002964
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-05 - 2026-ACCCON-0000074
09:00 AM - 11:00 AM: 304 - Partial Final
2026-06-05 - 2025-COMMCON-0000082
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-04 - 2026-ACCCON-0000074
08:00 AM - 09:00 AM: 304 - Partial Final
2026-06-03 - 2026-ACCCON-0000074
10:00 AM - 12:30 PM: 304 - Partial Final
2026-06-02 - 2023-ELEC-0013012
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-06-02 - 2025-COMMCON-0000049
12:00 PM - 01:00 PM: 108 - Final - Commercial
2026-06-02 - 2025-COMMCON-0001189
12:00 PM - 01:00 PM: 107 - Drywall
2026-06-02 - 2025-MECH-0007596
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-29 - 2025-MECH-0007596
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-28 - 2023-ELEC-0013012
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-27 - 2025-ELEC-0005813
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-27 - 2025-MECH-0007596
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-21 - 2023-ELEC-0013012
12:30 PM - 02:30 PM: 304 - Partial Final
2026-05-19 - 2023-ELEC-0013012
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-13 - 2025-ELEC-0001376
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-08 - 2024-COMMCON-0000830
12:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-06 - 2023-ELEC-0013012
10:00 AM - 12:00 PM: 304 - Partial Final
2026-05-05 - 2023-ELEC-0013012
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-29 - 2015-COMMCON-0001993
TBD: 108 - Final - Commercial
2026-04-29 - 2016-COMMCON-0002751
TBD: 108 - Final - Commercial
2026-04-27 - 2025-ELEC-0009324
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-27 - 2025-ELEC-0012355
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-04-24 - 2025-ELEC-0009324
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-04-24 - 2025-ELEC-0012355
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-04-22 - 2026-FIRE-0001487
08:30 AM - 10:30 AM: 303 - Full Rough
2026-04-16 - 2025-PLUMB-0008504
09:00 AM - 11:00 AM: 401 - Rough
2026-04-15 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-04-08 - 2026-FIRE-0000702
08:00 AM - 10:00 AM: 303 - Full Rough
2026-04-08 - 2025-COMMCON-0000049
09:00 AM - 11:00 AM: 109 - Other
2026-04-08 - 2025-COMMCON-0001657
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-08 - 2025-COMMCON-0002371
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-06 - 2025-COMMCON-0001657
08:30 AM - 10:00 AM: 112 - Frame
2026-04-06 - 2025-COMMCON-0002371
08:30 AM - 10:00 AM: 112 - Frame
2026-04-03 - 2025-FIRE-0007165
09:00 AM - 11:00 AM: 411 - Rough
2026-04-02 - 2026-FIRE-0000447
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-02 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-27 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: 112 - Frame
2026-03-27 - 2025-COMMCON-0002371
01:00 PM - 03:00 PM: 112 - Frame
2026-03-23 - 2025-BOILERAC-0000732
10:00 AM - 12:00 PM: 703 - Rough
2026-03-23 - 2025-PLUMB-0008504
11:00 AM - 01:00 PM: 401 - Rough
2026-03-20 - 2025-COMMCON-0000485
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-03-19 - 2025-FIRE-0002555
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-16 - 2025-PLUMB-0008504
09:00 AM - 11:00 AM: 401 - Rough
2026-03-13 - 2024-ELEC-0013292
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-03-13 - 2026-FIRE-0000447
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-13 - 2024-COMMCON-0000629
02:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-13 - 2024-COMMCON-0001878
02:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-13 - 2025-COMMCON-0002562
02:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-13 - 2026-COMMCON-0000445
02:00 PM - 03:00 PM: 108 - Final - Commercial
2026-03-11 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-10 - 2025-ELEC-0003573
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-03-10 - 2025-FIRE-0001091
08:30 AM - 10:30 AM: 303 - Full Rough
2026-03-10 - 2025-FIRE-0003047
08:30 AM - 10:30 AM: 303 - Full Rough
2026-03-10 - 2025-FIRE-0003205
08:30 AM - 10:30 AM: 303 - Full Rough
2026-03-10 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-09 - 2025-ELEC-0003573
10:00 AM - 12:00 PM: 304 - Partial Final
2026-03-05 - 2026-FIRE-0000494
08:30 AM - 05:30 PM: 303 - Full Rough
2026-03-05 - 2025-ELEC-0003573
08:30 AM - 09:30 AM: 304 - Partial Final
2026-03-03 - 2025-FIRE-0007165
08:00 AM - 01:00 PM: 411 - Rough
2026-03-02 - 2026-ELEC-0000632
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-26 - 2026-FIRE-0000521
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-02-24 - 2025-COMMCON-0001657
08:30 AM - 09:30 AM: 112 - Frame
2026-02-24 - 2025-MECH-0007596
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-02-23 - 2026-FIRE-0000486
10:00 AM - 12:00 PM: 306 - Final - Conduit Only
10:00 AM - 12:00 PM: 303 - Full Rough
2026-02-23 - 2025-COMMCON-0000485
09:00 AM - 12:00 PM: 108 - Final - Commercial
2026-02-23 - 2025-COMMCON-0001657
09:00 AM - 12:00 PM: 112 - Frame
2026-02-18 - 2025-COMMCON-0001657
08:30 AM - 09:30 AM: 109 - Other
2026-02-13 - 2025-FIRE-0002555
08:30 AM - 05:30 PM: 411 - Rough
2026-02-11 - 2025-FIRE-0002555
08:30 AM - 10:30 AM: 411 - Rough
2026-02-11 - 2023-COMMCON-0001915
08:30 AM - 09:30 AM: 108 - Final - Commercial
100 N Detroit ST
Recent Inspections
2026-06-12 - 2025-PLUMB-0011743
11:00 AM - 01:00 PM: 401 - Rough
2026-06-04 - 2025-MECH-0008716
08:00 AM - 11:00 AM: 902 - Partial Rough
2026-05-29 - 2025-COMMCON-0002723
01:00 PM - 03:00 PM: 107 - Drywall
2026-05-27 - 2025-COMMCON-0002723
12:00 PM - 02:00 PM: 112 - Frame
2026-05-26 - 2023-COMMCON-0002507
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-05-21 - 2023-FIRE-0007846
08:30 AM - 05:30 PM: 306 - Final - Conduit Only
2026-05-21 - 2023-COMMCON-0002507
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-20 - 2026-ELEC-0003725
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-05-20 - 2023-ELEC-0012646
TBD: 305 - Final - Electrical
2026-05-16 - 2025-MECH-0008716
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-05-15 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-05-15 - 2025-MECH-0008716
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-05-14 - 2025-PLUMB-0011743
12:00 PM - 02:00 PM: 401 - Rough
2026-05-14 - 2026-ELEC-0000284
TBD: 302 - Partial Rough
TBD: 309 - Walls
2026-05-13 - 2024-MECH-0000446
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-05-13 - 2025-MECH-0008716
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-05-13 - 2025-PLUMB-0011743
09:00 AM - 11:00 AM: 401 - Rough
2026-05-13 - 2026-ELEC-0000284
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-12 - 2024-MECH-0006468
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-05-12 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-05-12 - 2026-MECH-0002792
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-05-12 - 2026-PLUMB-0003373
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-05-06 - 2026-PLUMB-0003373
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-04-30 - 2024-MECH-0006468
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-04-29 - 2024-MECH-0006468
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-04-13 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-03-31 - 2025-COMMCON-0002723
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-03-27 - 2026-COMMCON-0000549
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-02-18 - 2025-COMMCON-0002046
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-02-17 - 2023-FIRE-0007686
08:30 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-02-11 - 2023-FIRE-0007686
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
1801 S Raleigh ST
Recent Inspections
2026-06-13 - 2026-RESCON-0000074
12:00 PM - 02:30 PM: 108 - Final - Residential
2026-06-12 - 2026-RESCON-0000074
12:00 PM - 02:30 PM: 108 - Final - Residential
2026-06-11 - 2026-RESCON-0000074
01:00 PM - 03:00 PM: 108 - Final - Residential
2026-06-02 - 2026-PLUMB-0000532
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-05-19 - 2026-ELEC-0000429
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-05-18 - 2026-ELEC-0000429
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-03-12 - 2026-ELEC-0000429
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-03-10 - 2026-PLUMB-0000532
11:00 AM - 03:00 PM: 402 - Final - Plumbing
2026-03-10 - 2026-ELEC-0000429
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-02-19 - 2026-RESCON-0000074
12:30 PM - 02:30 PM: 107 - Drywall
2026-02-17 - 2026-RESCON-0000074
12:30 PM - 02:30 PM: 106 - Batt Insulation
2026-02-13 - 2026-RESCON-0000074
10:30 AM - 12:30 PM: 112 - Frame
2026-02-12 - 2026-ELEC-0000429
11:00 AM - 01:00 PM: 303 - Full Rough
2026-02-12 - 2026-PLUMB-0000532
10:00 AM - 12:00 PM: 401 - Rough
2026-02-11 - 2026-ELEC-0000429
12:00 PM - 02:00 PM: 303 - Full Rough
2026-02-10 - 2026-ELEC-0000429
11:30 AM - 01:30 PM: 303 - Full Rough
2026-02-10 - 2026-PLUMB-0000532
10:00 AM - 12:00 PM: 401 - Rough
1040 N Niagara ST
Recent Inspections
2026-06-12 - 2024-RESCON-0001672
10:00 AM - 01:00 PM: 108 - Final - Residential
10:00 AM - 01:00 PM: 109 - Other
2026-06-12 - 2024-RESCON-0001673
10:00 AM - 01:00 PM: 112 - Frame
2026-06-11 - 2024-RESCON-0001673
01:00 PM - 03:00 PM: 112 - Frame
2026-06-10 - 2025-ELEC-0012701
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-10 - 2026-ELEC-0004896
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-05-11 - 2025-ELEC-0012701
12:00 PM - 02:30 PM: 303 - Full Rough
2026-05-11 - 2025-PLUMB-0005048
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-04-09 - 2025-MECH-0005290
10:00 AM - 12:00 PM: 903 - Rough
2026-02-12 - 2024-RESCON-0001673
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
- TBD: 113 - Pre Construction Meeting
2026-02-12 - 2024-RESCON-0001672
- TBD: 109 - Other
2026-02-10 - 2024-RESCON-0001673
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
450 S Gilpin ST
Recent Inspections
2026-06-12 - 2025-MECH-0007429
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-12 - 2025-MECH-0007442
09:00 AM - 11:00 AM: 903 - Rough
2026-06-09 - 2025-PLUMB-0006015
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-06-06 - 2025-ELEC-0011404
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-06-05 - 2025-ELEC-0011404
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-06-04 - 2026-RESCON-0001573
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-05-12 - 2025-PLUMB-0006015
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-05-11 - 2025-PLUMB-0006015
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-04-24 - 2025-PLUMB-0006015
12:00 PM - 03:00 PM: 405 - Meter Release
2026-02-20 - 2025-ROOFSIDE-0007869
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-02-09 - 2025-ROOFSIDE-0007869
09:00 AM - 11:00 AM: 206 - Other