1801 Wewatta ST
Recent Inspections
2026-06-12 - 2025-COMMCON-0001720
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-06-12 - 2025-ELEC-0009511
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-03-23 - 2025-COMMCON-0001720
09:00 AM - 11:00 AM: 112 - Frame
2026-02-18 - 2025-ELEC-0008109
11:30 AM - 02:30 PM: 305 - Final - Electrical
2026-02-10 - 2025-ELEC-0003925
09:30 AM - 11:30 AM: 305 - Final - Electrical
2026-02-09 - 2025-ELEC-0003925
09:30 AM - 11:30 AM: 305 - Final - Electrical
9020 E Northfield BLVD
Recent Inspections
2026-06-12 - 2025-BOILERAC-0000119
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2026-06-12 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-12 - 2025-MECH-0001114
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-11 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-06-09 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-06-08 - 2025-PLUMB-0001785
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-06-04 - 2025-PLUMB-0001785
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-06-02 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 109 - Other
11:30 AM - 01:30 PM: 112 - Frame
2026-06-02 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 304 - Partial Final
2026-05-28 - 2025-PLUMB-0001785
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-05-27 - 2025-ELEC-0000446
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-05-21 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 109 - Other
2026-05-21 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-14 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-05-13 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 112 - Frame
2026-05-08 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 109 - Other
2026-05-07 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 112 - Frame
2026-05-01 - 2025-COMMCON-0000088
09:30 AM - 11:30 AM: 109 - Other
2026-04-29 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-29 - 2025-PLUMB-0001785
09:00 AM - 11:00 AM: 401 - Rough
2026-04-16 - 2025-MECH-0001114
01:00 PM - 03:00 PM: 903 - Rough
2026-04-15 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-04-14 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 107 - Drywall
2026-04-10 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-04-09 - 2025-PLUMB-0001785
10:15 AM - 12:15 PM: 401 - Rough
2026-04-08 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-04-03 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 109 - Other
2026-04-01 - 2025-ELEC-0000446
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-03-31 - 2025-COMMCON-0000088
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 109 - Other
2026-03-31 - 2025-PLUMB-0001785
08:30 AM - 09:30 AM: 401 - Rough
2026-03-28 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 107 - Drywall
2026-03-27 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 107 - Drywall
2026-03-26 - 2025-PLUMB-0001785
12:15 PM - 03:00 PM: 401 - Rough
2026-03-26 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 107 - Drywall
2026-03-25 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-03-25 - 2025-PLUMB-0001785
12:15 PM - 03:00 PM: 401 - Rough
2026-03-24 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 106 - Batt Insulation
11:30 AM - 01:30 PM: 107 - Drywall
11:30 AM - 01:30 PM: 112 - Frame
2026-03-24 - 2025-ELEC-0000446
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-03-20 - 2025-COMMCON-0000088
09:30 AM - 11:30 AM: 109 - Other
09:30 AM - 11:30 AM: 112 - Frame
2026-03-20 - 2025-ELEC-0000446
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-03-20 - 2025-MECH-0001114
08:00 AM - 11:00 AM: 903 - Rough
2026-03-18 - 2025-COMMCON-0000088
01:00 PM - 03:00 PM: 109 - Other
2026-03-18 - 2025-ELEC-0000446
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-03-18 - 2025-MECH-0001114
09:00 AM - 11:00 AM: 903 - Rough
2026-03-13 - 2025-ELEC-0000446
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-13 - 2025-COMMCON-0000088
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-03-10 - 2025-MECH-0001114
11:00 AM - 01:00 PM: 903 - Rough
2026-03-10 - 2025-ELEC-0000446
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-09 - 2025-COMMCON-0000088
09:30 AM - 11:30 AM: 109 - Other
2026-03-09 - 2025-ELEC-0000446
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-03-06 - 2025-COMMCON-0000088
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-03-05 - 2025-ELEC-0000446
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-03-02 - 2025-COMMCON-0000088
09:00 AM - 11:00 AM: 109 - Other
2026-02-26 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 112 - Frame
2026-02-25 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-02-24 - 2025-COMMCON-0000088
12:00 PM - 02:00 PM: 109 - Other
2026-02-24 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-02-23 - 2025-COMMCON-0000088
11:30 AM - 01:30 PM: 109 - Other
2026-02-20 - 2025-COMMCON-0000088
01:00 PM - 03:00 PM: 112 - Frame
2026-02-20 - 2025-MECH-0001114
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-02-18 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 112 - Frame
2026-02-18 - 2025-ELEC-0000446
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-02-13 - 2025-COMMCON-0000088
12:00 PM - 03:00 PM: 112 - Frame
2026-02-12 - 2025-ELEC-0000446
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-02-11 - 2025-COMMCON-0000088
10:00 AM - 12:00 PM: 112 - Frame
2026-02-11 - 2025-ELEC-0000446
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-02-11 - 2025-MECH-0001114
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-02-06 - 2025-COMMCON-0000088
09:30 AM - 11:30 AM: 107 - Drywall
2026-02-06 - 2025-ELEC-0000446
10:00 AM - 12:00 PM: 302 - Partial Rough
4560 N Tennyson ST
Recent Inspections
2026-06-12 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
09:00 AM - 11:00 AM: Document Review Inspection
2026-06-10 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-10 - 2025-MECH-0008475
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-09 - 2025-BOILERAC-0000983
11:00 AM - 01:00 PM: 704 - Final - Boiler AC
2026-06-09 - 2026-FIRE-0001409
12:30 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-06-09 - 2025-MECH-0008475
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-06-08 - 2026-FIRE-0001409
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-06-08 - 2025-PLUMB-0011286
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-06-05 - 2025-BOILERAC-0000983
08:30 AM - 11:00 AM: 704 - Final - Boiler AC
2026-06-05 - 2025-ELEC-0013862
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-06-05 - 2025-MECH-0008475
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-05 - 2026-ELEC-0003255
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-06-03 - 2025-PLUMB-0011286
10:30 AM - 12:30 PM: 402 - Final - Plumbing
2026-05-26 - 2026-PLUMB-0003047
10:30 AM - 12:30 PM: 400 - Groundwork
2026-05-04 - 2026-ELEC-0002497
08:30 AM - 10:30 AM: 309 - Walls
2026-04-30 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-23 - 2025-BOILERAC-0000983
08:30 AM - 11:00 AM: 701 - Pressure Test
2026-04-23 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-23 - 2025-MECH-0008475
08:30 AM - 11:00 AM: 902 - Partial Rough
2026-04-21 - 2025-BOILERAC-0000983
08:30 AM - 10:00 PM: 702 - Partial Rough
2026-04-21 - 2025-ELEC-0013862
11:00 AM - 01:00 PM: 308 - Ceiling
2026-04-21 - 2025-MECH-0008475
08:30 AM - 10:00 PM: 902 - Partial Rough
2026-04-21 - 2026-ELEC-0003255
11:00 AM - 01:00 PM: 308 - Ceiling
TBD: 303 - Full Rough
2026-04-16 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 112 - Frame
2026-04-15 - 2025-PLUMB-0011286
10:00 AM - 12:30 PM: 401 - Rough
2026-04-14 - 2025-PLUMB-0011286
11:00 AM - 02:00 PM: 401 - Rough
2026-04-13 - 2025-PLUMB-0011286
11:00 AM - 02:00 PM: 401 - Rough
2026-04-06 - 2025-ELEC-0013862
08:30 AM - 10:30 AM: 308 - Ceiling
2026-04-02 - 2025-ELEC-0013862
08:30 AM - 10:30 AM: 309 - Walls
2026-03-31 - 2026-FIRE-0001409
12:00 PM - 02:30 PM: 411 - Rough
2026-03-18 - 2025-ELEC-0013862
08:30 AM - 10:30 AM: 301 - Underground
2026-03-16 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-03-13 - 2025-COMMCON-0002655
09:00 AM - 11:00 AM: 112 - Frame
2026-03-05 - 2025-PLUMB-0011286
08:00 AM - 10:30 AM: 400 - Groundwork
2026-02-20 - 2025-FIRE-0005782
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-19 - 2025-FIRE-0005782
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-19 - 2025-ELEC-0007866
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-18 - 2025-COMMCON-0002232
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-02-17 - 2025-COMMCON-0002232
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-02-17 - 2025-ELEC-0007866
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-02-17 - 2025-PLUMB-0006943
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-02-14 - 2025-FIRE-0005782
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-13 - 2025-PLUMB-0006943
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-02-13 - 2025-FIRE-0005782
10:00 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-02-12 - 2025-PLUMB-0006943
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-02-11 - 2025-FIRE-0005782
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-02-10 - 2025-ELEC-0007866
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-02-10 - 2025-PLUMB-0006943
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-02-06 - 2025-MECH-0005031
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-02-06 - 2025-BOILERAC-0000611
08:30 AM - 05:30 PM: 704 - Final - Boiler AC
2150 S Josephine
Recent Inspections
2026-06-12 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 112 - Frame
2026-06-12 - 2026-MECH-0001426
11:00 AM - 01:00 PM: 903 - Rough
2026-06-09 - 2025-RESCON-0000011
01:00 PM - 03:00 PM: 112 - Frame
2026-06-09 - 2025-RESCON-0000014
01:00 PM - 03:00 PM: 112 - Frame
2026-06-09 - 2025-RESCON-0000016
01:00 PM - 03:00 PM: 112 - Frame
2026-06-09 - 2026-MECH-0001426
01:00 PM - 03:00 PM: 903 - Rough
2026-06-05 - 2025-RESCON-0000011
11:00 AM - 01:00 PM: 109 - Other
2026-06-05 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 109 - Other
2026-06-05 - 2025-RESCON-0000014
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-06-05 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-06-05 - 2026-MECH-0001425
09:00 AM - 11:00 AM: 903 - Rough
2026-06-04 - 2026-MECH-0001427
11:00 AM - 01:00 PM: 903 - Rough
2026-06-04 - 2026-MECH-0001429
11:00 AM - 01:00 PM: 903 - Rough
2026-05-14 - 2025-RESCON-0000011
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-14 - 2025-RESCON-0000012
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-14 - 2025-RESCON-0000014
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-14 - 2025-RESCON-0000016
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-RESCON-0000011
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-RESCON-0000014
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-05-13 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-04-28 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-23 - 2026-MECH-0001393
01:00 PM - 03:00 PM: 903 - Rough
2026-04-21 - 2025-RESCON-0000011
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2025-RESCON-0000014
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-24 - 2025-RESCON-0000011
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2025-RESCON-0000014
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000011
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000012
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000014
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-23 - 2025-RESCON-0000016
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-18 - 2025-RESCON-0000007
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-17 - 2025-RESCON-0000007
11:00 AM - 01:00 PM: 107 - Drywall
2026-02-13 - 2025-RESCON-0000007
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-02-10 - 2025-RESCON-0000007
10:00 AM - 12:00 PM: 105 - Exterior Sheathing
10:00 AM - 12:00 PM: 109 - Other
2026-02-07 - 2025-RESCON-0000007
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-02-06 - 2025-RESCON-0000007
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
909 N Bryant St
Recent Inspections
2026-06-12 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 109 - Other
09:00 AM - 11:00 AM: 112 - Frame
2026-06-09 - 2025-COMMCON-0001676
12:30 PM - 02:30 PM: 107 - Drywall
2026-06-05 - 2025-COMMCON-0001676
01:00 PM - 03:00 PM: 112 - Frame
2026-06-04 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-03 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-02 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-02 - 2026-PLUMB-0004285
08:00 AM - 10:00 AM: 403 - Pressure Test
2026-06-01 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-05-29 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-05-28 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 112 - Frame
2026-05-27 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 112 - Frame
2026-05-27 - 2026-PLUMB-0004285
11:00 AM - 01:00 PM: 401 - Rough
2026-05-26 - 2026-PLUMB-0004285
11:00 AM - 01:00 PM: 401 - Rough
2026-05-26 - 2026-FIRE-0001192
11:00 AM - 01:00 PM: 411 - Rough
2026-05-23 - 2026-FIRE-0000865
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-22 - 2026-FIRE-0000865
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-05-19 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 109 - Other
2026-05-14 - 2026-FIRE-0000865
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-05-06 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 109 - Other
2026-05-06 - 2026-FIRE-0000865
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-05-05 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 109 - Other
2026-05-04 - 2026-FIRE-0000865
10:00 AM - 12:00 PM: 303 - Full Rough
2026-05-04 - 2026-ROOFSIDE-0001555
01:00 PM - 03:00 PM: 206 - Other
2026-05-01 - 2026-FIRE-0000865
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-04-30 - 2026-FIRE-0000865
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-04-29 - 2025-BOILERAC-0000624
01:00 PM - 03:00 PM: 702 - Partial Rough
2026-04-29 - 2026-FIRE-0001192
01:00 PM - 03:00 PM: 411 - Rough
2026-04-29 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 109 - Other
2026-04-29 - 2025-MECH-0005155
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-04-23 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 107 - Drywall
2026-04-21 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 107 - Drywall
2026-04-20 - 2026-FIRE-0001192
01:00 PM - 03:00 PM: 411 - Rough
2026-04-17 - 2025-COMMCON-0001676
10:00 AM - 12:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-15 - 2026-FIRE-0001192
01:00 PM - 03:00 PM: 411 - Rough
2026-04-15 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 106 - Batt Insulation
2026-04-10 - 2025-COMMCON-0001676
08:01 AM - 10:01 AM: 112 - Frame
2026-04-08 - 2026-ROOFSIDE-0001555
08:00 AM - 10:00 AM: 205 - Pre Inspection Commercial Flat Roof
2026-04-08 - 2025-MECH-0005155
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-04-07 - 2025-COMMCON-0001676
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
09:00 AM - 11:00 AM: 112 - Frame
2026-04-07 - 2025-MECH-0005155
08:30 AM - 09:30 AM: 113 - Pre Construction Meeting
2026-02-13 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 109 - Other
08:00 AM - 10:00 AM: 116 - Building Slab
2026-02-06 - 2025-COMMCON-0001676
08:00 AM - 10:00 AM: 104 - Frost Wall Insulation
4949 W 14th AVE
Recent Inspections
2026-06-12 - 2024-RESCON-0003540
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 200 - Blown Insulation
2026-06-08 - 2024-RESCON-0003540
09:00 AM - 11:00 AM: 112 - Frame
2026-05-22 - 2024-RESCON-0003540
10:00 AM - 12:00 PM: 112 - Frame
2026-05-20 - 2026-PLUMB-0004162
11:00 AM - 01:00 PM: 401 - Rough
2026-05-18 - 2026-ELEC-0004341
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 307 - Service Equipment
01:00 PM - 03:00 PM: 313 - Meter Release
2026-05-15 - 2026-ELEC-0004341
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 307 - Service Equipment
01:00 PM - 03:00 PM: 313 - Meter Release
2026-04-21 - 2026-MECH-0002364
10:00 AM - 12:00 PM: 903 - Rough
2026-04-17 - 2026-MECH-0002364
08:30 AM - 09:30 AM: 903 - Rough
2026-04-14 - 2024-RESCON-0003540
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-04-10 - 2024-RESCON-0003540
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-04-07 - 2024-RESCON-0003540
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-03-24 - 2026-ELEC-0002106
12:00 PM - 02:00 PM: 305 - Final - Electrical
12:00 PM - 02:00 PM: 311 - Temporary Service
12:00 PM - 02:00 PM: 313 - Meter Release
2026-02-26 - 2024-RESCON-0003540
08:30 AM - 05:30 PM: 102 - Foundation Perimeter Drain
08:30 AM - 05:30 PM: 103 - Waterproofing
2026-02-13 - 2024-RESCON-0003540
12:00 PM - 02:00 PM: 101 - Foundation Wall
2026-02-11 - 2024-RESCON-0003540
09:00 AM - 11:00 AM: 100 - Footing
2026-02-10 - 2024-RESCON-0003540
09:30 AM - 11:30 AM: 100 - Footing
2026-02-06 - 2024-RESCON-0003540
- TBD: 113 - Pre Construction Meeting
3725 E Dartmouth AVE
Recent Inspections
2026-06-12 - 2026-RESCON-0000357
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-06-08 - 2026-RESCON-0000357
12:30 AM - 02:30 PM: 112 - Frame
2026-06-03 - 2026-RESCON-0000357
09:00 AM - 11:00 AM: 112 - Frame
2026-06-03 - 2026-MECH-0003262
11:00 AM - 01:00 PM: 903 - Rough
2026-05-20 - 2026-ELEC-0004524
10:00 AM - 12:00 PM: 303 - Full Rough
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-05-19 - 2026-PLUMB-0003666
08:30 AM - 11:30 AM: 401 - Rough
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-04-28 - 2026-PLUMB-0003666
12:00 PM - 03:00 PM: 401 - Rough
2026-04-24 - 2026-PLUMB-0003666
08:30 AM - 11:30 AM: 401 - Rough
2026-02-17 - 2026-RESCON-0000357
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-02-06 - 2026-RESCON-0000357
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
835 S Washington St
Recent Inspections
2026-06-12 - 2026-ELEC-0003963
10:00 AM - 12:00 PM: 301 - Underground
2026-06-05 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 109 - Other
2026-06-04 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-03 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 107 - Drywall
2026-06-02 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 107 - Drywall
2026-05-29 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-26 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-05-22 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 106 - Batt Insulation
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-05-21 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-05-18 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 112 - Frame
2026-05-18 - 2023-RESCON-0003653
09:00 AM - 11:00 AM: 111 - Exterior Lath
2026-05-15 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 112 - Frame
2026-05-15 - 2023-RESCON-0003653
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-05-15 - 2026-MECH-0002890
09:00 AM - 11:00 AM: 903 - Rough
2026-05-13 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 112 - Frame
2026-05-12 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 112 - Frame
2026-05-08 - 2026-ELEC-0003963
12:00 PM - 02:00 PM: 303 - Full Rough
2026-05-05 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 112 - Frame
2026-05-05 - 2026-PLUMB-0000905
01:00 PM - 03:00 PM: 401 - Rough
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-05-04 - 2026-ELEC-0003963
01:00 PM - 03:00 PM: 303 - Full Rough
TBD: 312 - UFER
2026-05-04 - 2026-MECH-0002648
01:00 PM - 03:00 PM: 903 - Rough
2026-04-23 - 2023-RESCON-0003653
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-04-23 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 112 - Frame
01:00 PM - 03:00 PM: 200 - Blown Insulation
2026-04-16 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 107 - Drywall
2026-04-01 - 2023-RESCON-0003650
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-03-16 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-03-13 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-03-13 - 2026-ROOFSIDE-0001034
09:00 AM - 11:00 AM: 205 - Pre Inspection Commercial Flat Roof
2026-03-11 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-02-06 - 2023-RESCON-0003650
08:30 AM - 10:30 AM: 116 - Building Slab
2026-02-05 - 2023-RESCON-0003650
09:00 AM - 11:00 AM: 116 - Building Slab
4103 E Wesley
Recent Inspections
2026-06-12 - 2022-RESCON-0004304
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-06-12 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-06-12 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-06-12 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-06-12 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-26 - 2022-RESCON-0004304
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-26 - 2022-RESCON-0004305
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-26 - 2022-RESCON-0004306
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-26 - 2022-RESCON-0004307
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-26 - 2022-RESCON-0004308
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-05-13 - 2025-MECH-0003749
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-05-07 - 2022-ELEC-0012746
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-07 - 2022-ELEC-0012747
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-07 - 2022-ELEC-0012748
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-07 - 2022-ELEC-0012752
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-05-07 - 2022-ELEC-0012755
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-04-06 - 2022-RESCON-0004305
09:00 AM - 11:00 AM: 109 - Other
2026-04-06 - 2022-RESCON-0004306
11:00 AM - 01:00 PM: 109 - Other
2026-04-06 - 2022-RESCON-0004307
11:00 AM - 01:00 PM: 109 - Other
2026-04-06 - 2022-RESCON-0004308
11:00 AM - 01:00 PM: 109 - Other
2026-04-06 - 2022-RESCON-0004304
09:00 AM - 11:00 AM: 109 - Other
2026-03-17 - 2022-ELEC-0012747
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-16 - 2022-RESCON-0004304
11:00 AM - 01:00 PM: 109 - Other
2026-03-16 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 109 - Other
2026-03-16 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 109 - Other
2026-03-16 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 109 - Other
2026-03-16 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 109 - Other
2026-03-11 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-10 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-10 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-10 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 107 - Drywall
2026-03-09 - 2022-ELEC-0012746
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-09 - 2022-ELEC-0012747
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-09 - 2022-ELEC-0012748
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-09 - 2022-ELEC-0012752
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-09 - 2022-ELEC-0012755
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-03-03 - 2022-RESCON-0004304
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-03 - 2022-RESCON-0004305
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-02 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-03-02 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-27 - 2022-RESCON-0004304
11:00 AM - 01:00 PM: 109 - Other
2026-02-27 - 2022-RESCON-0004305
11:00 AM - 01:00 PM: 109 - Other
2026-02-27 - 2022-RESCON-0004306
11:00 AM - 01:00 PM: 109 - Other
2026-02-27 - 2022-RESCON-0004307
11:00 AM - 01:00 PM: 109 - Other
2026-02-27 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 109 - Other
2026-02-27 - 2022-ELEC-0012746
09:00 AM - 11:00 AM: 303 - Full Rough
2026-02-23 - 2022-RESCON-0004304
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-23 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-23 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-19 - 2022-RESCON-0004304
01:00 PM - 03:00 PM: 109 - Other
2026-02-19 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 109 - Other
2026-02-19 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 109 - Other
2026-02-19 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 109 - Other
2026-02-19 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 109 - Other
2026-02-17 - 2022-RESCON-0004304
11:00 AM - 01:00 PM: 112 - Frame
2026-02-17 - 2022-RESCON-0004305
11:00 AM - 01:00 PM: 112 - Frame
2026-02-17 - 2022-RESCON-0004306
11:00 AM - 01:00 PM: 112 - Frame
2026-02-17 - 2022-RESCON-0004307
11:00 AM - 01:00 PM: 112 - Frame
2026-02-17 - 2022-RESCON-0004308
11:00 AM - 01:00 PM: 112 - Frame
2026-02-13 - 2022-ELEC-0012746
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-13 - 2022-ELEC-0012747
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-13 - 2022-ELEC-0012748
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-13 - 2022-ELEC-0012752
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-13 - 2022-ELEC-0012755
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-11 - 2022-RESCON-0004304
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-11 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-11 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-11 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-11 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-02-06 - 2022-RESCON-0004304
01:00 PM - 03:00 PM: 112 - Frame
2026-02-06 - 2022-RESCON-0004305
01:00 PM - 03:00 PM: 112 - Frame
2026-02-06 - 2022-RESCON-0004306
01:00 PM - 03:00 PM: 112 - Frame
2026-02-06 - 2022-RESCON-0004307
01:00 PM - 03:00 PM: 112 - Frame
2026-02-06 - 2022-RESCON-0004308
01:00 PM - 03:00 PM: 112 - Frame
2026-02-05 - 2022-ELEC-0012746
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-02-05 - 2022-ELEC-0012747
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-02-05 - 2022-ELEC-0012748
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-02-05 - 2022-ELEC-0012752
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-02-05 - 2022-ELEC-0012755
09:00 AM - 11:00 AM: 302 - Partial Rough
3000 E 1st Ave
Recent Inspections
2026-06-13 - 2026-COMMCON-0000809
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-06-12 - 2026-COMMCON-0000809
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-05-22 - 2025-COMMCON-0001688
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-20 - 2025-ELEC-0008466
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-20 - 2025-COMMCON-0001688
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-20 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-20 - 2025-ELEC-0010392
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-05-19 - 2025-ELEC-0008466
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-18 - 2025-COMMCON-0001688
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-18 - 2025-ELEC-0008466
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-18 - 2025-MECH-0005168
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-18 - 2025-ELEC-0010392
TBD: 305 - Final - Electrical
2026-05-15 - 2025-FIRE-0006641
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-05-15 - 2025-COMMCON-0002554
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-05-14 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-14 - 2025-COMMCON-0002554
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-14 - 2025-ELEC-0010392
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-13 - 2026-FIRE-0001651
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-05-13 - 2025-ELEC-0010392
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-05-12 - 2025-FIRE-0006641
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-05-12 - 2026-FIRE-0001651
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-05-08 - 2026-ACCCON-0000124
10:00 AM - 12:00 PM: 305 - Final - Access Control
2026-05-07 - 2025-COMMCON-0001813
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-07 - 2025-COMMCON-0002737
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-07 - 2025-MECH-0008178
TBD: Document Review
2026-05-07 - 2026-FIRE-0001651
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-05-06 - 2025-MECH-0006486
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-06 - 2025-MECH-0008178
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-05-05 - 2026-FIRE-0000549
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-05-05 - 2025-COMMCON-0001813
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-05 - 2025-COMMCON-0002737
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-04 - 2025-COMMCON-0002737
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-05-04 - 2025-ELEC-0013218
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-05-01 - 2026-FIRE-0000495
01:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-04-30 - 2025-FIRE-0006641
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-04-29 - 2025-ELEC-0013218
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-04-29 - 2026-PLUMB-0000423
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-04-28 - 2025-MECH-0008178
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-04-24 - 2025-MECH-0006378
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-04-22 - 2025-ELEC-0013218
08:00 AM - 10:00 AM: 308 - Ceiling
2026-04-21 - 2025-COMMCON-0002554
11:00 AM - 01:00 PM: 107 - Drywall
2026-04-21 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 112 - Frame
2026-04-15 - 2025-COMMCON-0002554
11:30 AM - 01:30 PM: 109 - Other
2026-04-15 - 2025-ELEC-0013218
10:00 AM - 12:00 PM: 308 - Ceiling
2026-04-14 - 2025-COMMCON-0002062
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-04-13 - 2026-FIRE-0002010
08:00 AM - 10:00 AM: 303 - Full Rough
2026-04-10 - 2025-COMMCON-0002302
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-04-08 - 2026-FIRE-0000550
01:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-04-08 - 2026-FIRE-0000812
01:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-04-08 - 2025-ELEC-0011539
TBD: 305 - Final - Electrical
2026-04-08 - 2025-MECH-0008178
01:00 PM - 03:00 PM: 903 - Rough
2026-04-08 - 2025-MECH-0008653
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-04-07 - 2026-FIRE-0001651
08:00 AM - 10:00 AM: 411 - Rough
2026-04-07 - 2025-ELEC-0012134
09:00 AM - 11:00 AM: 305 - Final - Electrical
TBD: 307 - Service Equipment
2026-04-07 - 2025-ELEC-0013218
09:00 AM - 11:00 AM: 308 - Ceiling
2026-04-07 - 2025-PLUMB-0011032
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-04-06 - 2025-PLUMB-0011032
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-04-03 - 2025-MECH-0008327
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-04-03 - 2025-COMMCON-0002201
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-04-02 - 2025-COMMCON-0002302
12:00 PM - 02:00 PM: 112 - Frame
2026-04-02 - 2025-COMMCON-0002554
12:00 PM - 02:00 PM: 112 - Frame
2026-04-01 - 2026-COMMCON-0000082
01:00 PM - 03:00 PM: 109 - Other
2026-04-01 - 2025-COMMCON-0002201
01:00 PM - 03:00 PM: 109 - Other
2026-03-31 - 2025-COMMCON-0002302
12:00 PM - 02:00 PM: 112 - Frame
2026-03-31 - 2025-ELEC-0013218
09:00 AM - 11:00 AM: 301 - Underground
09:00 AM - 11:00 AM: 309 - Walls
2026-03-31 - 2026-COMMCON-0000082
12:00 PM - 02:00 PM: 109 - Other
2026-03-27 - 2025-ELEC-0012134
09:00 AM - 11:00 AM: 308 - Ceiling
2026-03-27 - 2026-MECH-0001579
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-03-26 - 2025-ELEC-0011539
TBD: 302 - Partial Rough
TBD: 308 - Ceiling
2026-03-25 - 2025-COMMCON-0002302
01:00 PM - 03:00 PM: 112 - Frame
2026-03-25 - 2025-ELEC-0012134
09:00 AM - 11:00 AM: 308 - Ceiling
2026-03-25 - 2025-ELEC-0013996
09:00 AM - 11:00 AM: 308 - Ceiling
2026-03-25 - 2025-ELEC-0011539
TBD: 305 - Final - Electrical
TBD: 302 - Partial Rough
TBD: 308 - Ceiling
2026-03-24 - 2026-FIRE-0000550
08:00 AM - 10:00 AM: 411 - Rough
2026-03-24 - 2026-FIRE-0001049
09:00 AM - 11:00 AM: 303 - Full Rough
2026-03-24 - 2025-COMMCON-0001617
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-24 - 2025-ELEC-0012134
09:00 AM - 11:00 AM: 308 - Ceiling
2026-03-23 - 2025-FIRE-0006381
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-03-20 - 2025-FIRE-0006641
12:00 PM - 03:00 PM: 411 - Rough
2026-03-20 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-20 - 2025-COMMCON-0002302
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-20 - 2025-MECH-0008327
12:00 PM - 02:00 PM: 903 - Rough
2026-03-19 - 2025-FIRE-0006641
10:00 AM - 12:00 PM: 411 - Rough
2026-03-19 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-18 - 2025-FIRE-0006381
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-03-18 - 2025-COMMCON-0001925
12:00 PM - 02:00 PM: 112 - Frame
2026-03-17 - 2025-COMMCON-0001617
11:00 AM - 01:00 PM: 112 - Frame
2026-03-16 - 2026-FIRE-0000495
12:30 PM - 02:30 PM: 411 - Rough
2026-03-16 - 2025-COMMCON-0002025
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-16 - 2025-ELEC-0008648
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 308 - Ceiling
2026-03-13 - 2025-ELEC-0010392
09:00 AM - 11:00 AM: 308 - Ceiling
2026-03-13 - 2025-FIRE-0007480
09:00 AM - 11:00 AM: 303 - Full Rough
2026-03-13 - 2026-FIRE-0000306
09:00 AM - 11:00 AM: 303 - Full Rough
2026-03-13 - 2025-MECH-0008653
01:00 PM - 03:00 PM: 903 - Rough
2026-03-11 - 2025-COMMCON-0001617
11:00 AM - 01:00 PM: 112 - Frame
2026-03-11 - 2025-COMMCON-0002737
11:00 AM - 01:00 PM: 107 - Drywall
2026-03-11 - 2025-MECH-0008653
01:00 PM - 03:00 PM: 903 - Rough
2026-03-10 - 2025-COMMCON-0001730
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-10 - 2025-COMMCON-0002091
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-10 - 2025-COMMCON-0002737
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-03-09 - 2025-COMMCON-0002737
11:00 AM - 01:00 PM: 112 - Frame
2026-03-06 - 2025-COMMCON-0001349
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-06 - 2025-COMMCON-0002173
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-06 - 2025-COMMCON-0002753
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-06 - 2026-FIRE-0000495
10:30 AM - 01:00 PM: 411 - Rough
2026-03-06 - 2025-COMMCON-0002737
01:00 PM - 03:00 PM: 112 - Frame
2026-03-06 - 2025-ELEC-0010392
09:00 AM - 11:00 PM: 308 - Ceiling
2026-03-05 - 2025-FIRE-0007482
10:30 AM - 01:30 PM: 412 - Final - Fire Suppression
2026-03-05 - 2026-FIRE-0000125
10:30 AM - 01:30 PM: 412 - Final - Fire Suppression
2026-03-05 - 2026-FIRE-0000148
10:30 AM - 01:30 PM: 412 - Final - Fire Suppression
2026-03-05 - 2026-FIRE-0000495
10:30 AM - 01:30 PM: 412 - Final - Fire Suppression
2026-03-05 - 2025-COMMCON-0001349
11:00 AM - 01:00 PM: 108 - Final - Commercial
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-03-05 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 112 - Frame
2026-03-05 - 2025-COMMCON-0002173
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-05 - 2025-COMMCON-0002753
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-03-04 - 2025-FIRE-0007482
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-04 - 2026-FIRE-0000125
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-04 - 2026-FIRE-0000148
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-04 - 2026-FIRE-0000495
08:30 AM - 05:30 PM: 411 - Rough
2026-03-04 - 2026-FIRE-0000549
08:30 AM - 05:30 PM: 412 - Final - Fire Suppression
2026-03-03 - 2025-FIRE-0005620
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-03-03 - 2025-FIRE-0007482
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-03 - 2026-FIRE-0000125
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-03 - 2026-FIRE-0000148
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-03-03 - 2025-FIRE-0006641
09:00 AM - 11:00 AM: 411 - Rough
2026-03-03 - 2025-MECH-0004948
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-03-03 - 2026-COMMCON-0000082
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-03-02 - 2025-FIRE-0005620
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-03-02 - 2025-FIRE-0007482
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-03-02 - 2026-FIRE-0000125
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-03-02 - 2026-FIRE-0000148
12:00 PM - 02:00 PM: 411 - Rough
12:00 PM - 02:00 PM: 412 - Final - Fire Suppression
2026-03-02 - 2025-COMMCON-0002737
10:30 AM - 12:30 PM: 112 - Frame
2026-03-02 - 2025-ELEC-0013996
08:30 AM - 10:30 AM: 308 - Ceiling
2026-03-02 - 2025-MECH-0004948
01:00 PM - 03:00 PM: 903 - Rough
2026-03-02 - 2026-FIRE-0000306
08:00 AM - 10:30 AM: 302 - Partial Rough
2026-02-27 - 2025-FIRE-0007480
08:00 AM - 10:00 AM: 303 - Full Rough
2026-02-27 - 2025-COMMCON-0001349
12:30 AM - 02:30 PM: 109 - Other
2026-02-27 - 2025-COMMCON-0001925
12:30 AM - 02:30 PM: 107 - Drywall
2026-02-27 - 2025-ELEC-0006646
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-27 - 2025-ELEC-0010392
08:00 AM - 10:00 AM: 308 - Ceiling
- TBD: 302 - Partial Rough
2026-02-27 - 2025-ELEC-0011205
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-27 - 2025-ELEC-0013964
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-27 - 2025-MECH-0006378
12:00 PM - 02:00 PM: 903 - Rough
2026-02-26 - 2025-COMMCON-0002201
10:30 AM - 12:30 PM: 108 - Final - Commercial
2026-02-26 - 2025-ELEC-0006646
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-02-26 - 2025-ELEC-0011205
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-02-26 - 2025-ELEC-0013964
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-02-26 - 2025-MECH-0004753
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-02-26 - 2025-PLUMB-0006682
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-26 - 2026-PLUMB-0000423
08:00 AM - 10:00 AM: 401 - Rough
2026-02-25 - 2025-BOILERAC-0001014
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-02-25 - 2025-FIRE-0005620
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-02-25 - 2025-ELEC-0006646
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-25 - 2025-ELEC-0011205
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-25 - 2025-ELEC-0013964
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-25 - 2025-MECH-0004753
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-02-25 - 2025-MECH-0006759
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-02-25 - 2025-MECH-0008653
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-02-25 - 2025-MECH-0008661
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-02-25 - 2025-PLUMB-0006682
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-25 - 2025-PLUMB-0009080
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-25 - 2025-PLUMB-0011573
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-24 - 2025-BOILERAC-0001014
08:00 AM - 11:00 AM: 701 - Pressure Test
2026-02-24 - 2025-MECH-0008661
08:00 AM - 11:00 AM: 903 - Rough
2026-02-23 - 2025-FIRE-0005620
11:00 AM - 01:00 PM: 411 - Rough
2026-02-23 - 2025-COMMCON-0002302
01:00 PM - 03:00 PM: 112 - Frame
2026-02-23 - 2025-ELEC-0006646
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-02-23 - 2025-ELEC-0013964
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-02-20 - 2025-FIRE-0005620
12:30 PM - 02:30 PM: 411 - Rough
2026-02-20 - 2025-ELEC-0006646
08:00 AM - 10:00 AM: 308 - Ceiling
2026-02-20 - 2025-ELEC-0011205
08:00 AM - 10:00 AM: 308 - Ceiling
2026-02-20 - 2025-ELEC-0013964
08:00 AM - 10:00 AM: 308 - Ceiling
2026-02-20 - 2026-ELEC-0000407
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-19 - 2025-FIRE-0006377
09:00 AM - 11:00 AM: 303 - Full Rough
2026-02-19 - 2025-COMMCON-0001925
01:00 PM - 03:00 PM: 112 - Frame
2026-02-19 - 2025-PLUMB-0011032
08:00 AM - 10:00 AM: 401 - Rough
2026-02-17 - 2026-FIRE-0000306
09:00 AM - 11:00 AM: 303 - Full Rough
2026-02-17 - 2025-COMMCON-0002737
01:00 PM - 03:00 PM: 112 - Frame
2026-02-17 - 2025-ELEC-0012134
09:00 AM - 11:00 AM: 303 - Full Rough
2026-02-17 - 2025-ELEC-0013996
09:00 AM - 11:00 AM: 308 - Ceiling
2026-02-17 - 2025-PLUMB-0008467
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-02-17 - 2025-PLUMB-0011032
08:00 AM - 10:00 AM: 401 - Rough
2026-02-13 - 2025-COMMCON-0001269
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-02-13 - 2025-ELEC-0010392
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 308 - Ceiling
08:00 AM - 10:00 AM: 309 - Walls
2026-02-12 - 2025-COMMCON-0002025
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-02-11 - 2025-COMMCON-0002025
12:00 PM - 02:00 PM: 108 - Final - Commercial
2026-02-11 - 2025-ELEC-0011507
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-02-10 - 2026-ELEC-0000407
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-02-06 - 2025-COMMCON-0002737
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-02-06 - 2025-ELEC-0011539
08:00 AM - 10:00 AM: 301 - Underground
08:00 AM - 10:00 AM: 309 - Walls
2026-02-06 - 2025-ELEC-0013996
08:00 AM - 10:00 AM: 301 - Underground
08:00 AM - 10:00 AM: 309 - Walls
2026-02-05 - 2025-COMMCON-0001925
11:00 AM - 01:00 PM: 112 - Frame
2026-02-05 - 2025-ELEC-0012134
08:00 AM - 10:00 AM: 301 - Underground
2026-02-05 - 2025-PLUMB-0011032
08:00 AM - 10:00 AM: 400 - Groundwork