7887 E Belleview Ave
Recent Inspections
2026-09-11 - 2026-COMMCON-0000301
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-09 - 2026-COMMCON-0000301
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-04 - 2026-FIRE-0002598
01:00 PM - 03:00 PM: 411 - Rough
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-09-03 - 2026-FIRE-0002598
01:00 PM - 03:00 PM: 411 - Rough
2026-09-02 - 2026-COMMCON-0000301
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-09-01 - 2026-PLUMB-0001329
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-07-22 - 2026-ELEC-0001420
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-21 - 2026-ACCCON-0000035
TBD: 305 - Final - Access Control
2026-07-20 - 2026-COMMCON-0000271
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-07-17 - 2026-ACCCON-0000152
TBD: 305 - Final - Access Control
2026-07-16 - 2026-PLUMB-0001230
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-07-13 - 2026-FIRE-0001959
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-07-10 - 2026-ELEC-0001299
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-07-09 - 2026-MECH-0000898
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-08 - 2026-ACCCON-0000035
TBD: 305 - Final - Access Control
7521 N Gun Club RD
Recent Inspections
2026-09-11 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-10 - 2025-ELEC-0009209
08:00 AM - 10:00 AM: 309 - Walls
2026-09-04 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 901 - Pressure Test
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-04 - 2026-BOILERAC-0000528
08:30 AM - 05:30 PM: 701 - Pressure Test
2026-09-03 - 2025-ELEC-0008285
12:30 PM - 02:30 PM: 305 - Final - Electrical
12:30 PM - 02:30 PM: 313 - Meter Release
2026-09-02 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
2026-09-01 - 2025-ELEC-0008285
12:30 PM - 02:30 PM: 303 - Full Rough
2026-08-31 - 2026-COMMCON-0000722
TBD: 109 - Other
2026-08-27 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 901 - Pressure Test
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-20 - 2026-FIRE-0000274
09:00 AM - 11:00 AM: 410 - Underground
2026-08-20 - 2025-COMMCON-0000976
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 109 - Other
2026-08-19 - 2026-BOILERAC-0000343
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-08-19 - 2026-FIRE-0002639
11:00 AM - 01:00 PM: 411 - Rough
2026-08-18 - 2026-BOILERAC-0000343
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-08-17 - 2025-COMMCON-0000976
11:30 AM - 01:30 PM: Document Review Inspection
11:30 AM - 01:30 PM: 112 - Frame
2026-08-17 - 2025-ELEC-0009209
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-14 - 2025-PLUMB-0006470
10:00 AM - 12:00 PM: 401 - Rough
2026-08-13 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0009209
08:30 AM - 09:30 AM: 307 - Service Equipment
08:30 AM - 09:30 AM: 309 - Walls
08:30 AM - 09:30 AM: 313 - Meter Release
2026-08-13 - 2026-MECH-0002668
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-12 - 2026-FIRE-0002639
11:00 AM - 02:00 PM: 411 - Rough
2026-08-12 - 2025-PLUMB-0006470
11:00 AM - 02:00 PM: 401 - Rough
2026-08-11 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-08-10 - 2025-PLUMB-0006470
10:15 AM - 12:15 PM: 401 - Rough
2026-08-06 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 109 - Other
08:30 AM - 09:30 AM: 112 - Frame
2026-08-04 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
2026-08-04 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 109 - Other
2026-08-03 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 112 - Frame
2026-08-03 - 2025-MECH-0004556
09:00 AM - 11:00 AM: 903 - Rough
2026-07-31 - 2025-COMMCON-0000976
08:30 AM - 10:30 AM: 112 - Frame
2026-07-30 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-29 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-07-28 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-17 - 2025-COMMCON-0000976
11:30 AM - 12:30 PM: 106 - Batt Insulation
11:30 AM - 12:30 PM: 107 - Drywall
11:30 AM - 12:30 PM: 112 - Frame
2026-07-17 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 900 - Groundwork
2026-07-14 - 2025-ELEC-0009209
09:00 AM - 11:00 AM: 309 - Walls
2026-07-13 - 2025-COMMCON-0000976
10:00 AM - 12:30 PM: Document Review Inspection
2026-07-09 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 105 - Exterior Sheathing
08:30 AM - 09:30 AM: 112 - Frame
2026-07-07 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 105 - Exterior Sheathing
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-06-25 - 2025-COMMCON-0000976
09:00 AM - 10:00 AM: 103 - Waterproofing
09:00 AM - 10:00 AM: 106 - Batt Insulation
09:00 AM - 10:00 AM: 107 - Drywall
09:00 AM - 10:00 AM: 109 - Other
09:00 AM - 10:00 AM: 112 - Frame
2026-06-23 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
1354 S Lafayette ST
Recent Inspections
2026-09-11 - 2026-RESCON-0000037
11:30 AM - 01:30 PM: 106 - Batt Insulation
2026-09-10 - 2026-RESCON-0000037
12:00 PM - 02:00 PM: 112 - Frame
2026-09-09 - 2026-ELEC-0007836
TBD: Document Review
2026-09-03 - 2026-RESCON-0000037
01:00 PM - 02:30 PM: 112 - Frame
2026-09-02 - 2026-RESCON-0000037
01:00 PM - 02:30 PM: 112 - Frame
2026-09-01 - 2026-ELEC-0007836
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-01 - 2026-PLUMB-0005506
08:00 AM - 10:00 AM: 403 - Pressure Test
2026-08-31 - 2026-ELEC-0007836
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-27 - 2026-RESCON-0000037
09:00 AM - 11:00 AM: 109 - Other
2026-08-26 - 2026-RESCON-0000037
09:00 AM - 11:00 AM: 109 - Other
2026-08-26 - 2026-ELEC-0007836
09:00 AM - 11:00 AM: 303 - Full Rough
2026-08-26 - 2026-PLUMB-0005506
10:00 AM - 12:00 PM: 401 - Rough
2026-07-24 - 2026-MECH-0004432
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
11:00 AM - 01:00 PM: 903 - Rough
2026-07-15 - 2026-RESCON-0000037
09:00 AM - 11:00 AM: 116 - Building Slab
2026-07-13 - 2026-RESCON-0000037
12:30 PM - 02:30 PM: 116 - Building Slab
2026-07-10 - 2026-RESCON-0000037
11:30 AM - 01:30 PM: 116 - Building Slab
2026-07-09 - 2026-RESCON-0000037
09:00 AM - 11:00 AM: 102 - Foundation Perimeter Drain
09:00 AM - 11:00 AM: 116 - Building Slab
2026-07-09 - 2026-PLUMB-0005506
08:30 AM - 11:30 AM: 400 - Groundwork
4944 N Lowell BLVD
Recent Inspections
2026-09-11 - 2026-FIRE-0004612
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-09-10 - 2026-FIRE-0004612
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-08-20 - 2026-FIRE-0004612
12:30 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-08-20 - 2026-PLUMB-0006706
12:30 PM - 03:00 PM: 402 - Final - Plumbing
2026-08-18 - 2026-FIRE-0004612
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-18 - 2026-PLUMB-0006706
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-17 - 2026-FIRE-0004612
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-08-17 - 2026-PLUMB-0006706
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-08-07 - 2026-ROOFSIDE-0000326
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-07-28 - 2026-PLUMB-0005993
10:00 AM - 12:30 PM: 402 - Final - Plumbing
2026-07-24 - 2022-ELEC-0015421
08:30 AM - 10:30 AM: 307 - Service Equipment
08:30 AM - 10:30 AM: 313 - Meter Release
2026-07-14 - 2022-COMMCON-0002744
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-10 - 2023-BOILERAC-0000412
08:30 AM - 11:00 AM: 703 - Rough
2026-07-10 - 2023-MECH-0004440
08:30 AM - 11:00 AM: 903 - Rough
2026-06-29 - 2022-COMMCON-0002744
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-06-25 - 2022-ELEC-0015421
08:30 AM - 10:30 AM: 301 - Underground
2026-06-24 - 2022-COMMCON-0002744
09:00 AM - 11:00 AM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2980 S Pancratia St
Recent Inspections
2026-09-11 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-11 - 2025-MECH-0005016
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-09-10 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-10 - 2025-COMMCON-0001272
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-09-10 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-09 - 2025-COMMCON-0001272
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-09-08 - 2025-COMMCON-0001272
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-05 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-05 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-04 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-04 - 2025-COMMCON-0001272
02:00 PM - 03:00 PM: 106 - Batt Insulation
02:00 PM - 03:00 PM: 107 - Drywall
2026-09-04 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-03 - 2025-COMMCON-0001272
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-09-03 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-03 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-02 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-02 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-02 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-01 - 2025-COMMCON-0001272
11:00 AM - 01:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-01 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-31 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-29 - 2025-COMMCON-0001272
TBD: 106 - Batt Insulation
TBD: 107 - Drywall
TBD: 112 - Frame
2026-08-29 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-28 - 2025-COMMCON-0001272
TBD: 106 - Batt Insulation
TBD: 107 - Drywall
TBD: 112 - Frame
2026-08-28 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-27 - 2025-COMMCON-0001272
11:00 AM - 01:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-08-27 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-27 - 2025-MECH-0005016
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-08-26 - 2025-COMMCON-0001272
08:30 AM - 12:30 PM: 106 - Batt Insulation
08:30 AM - 12:30 PM: 107 - Drywall
08:30 AM - 12:30 PM: 112 - Frame
2026-08-21 - 2025-ELEC-0008891
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0000673
11:00 AM - 03:00 PM: 411 - Rough
2026-08-21 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0004044
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-21 - 2025-COMMCON-0001272
12:30 PM - 02:30 PM: 107 - Drywall
12:30 PM - 02:30 PM: 112 - Frame
2026-08-20 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-08-20 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-20 - 2025-COMMCON-0001272
12:30 PM - 02:30 PM: 107 - Drywall
12:30 PM - 02:30 PM: 112 - Frame
2026-08-19 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-08-19 - 2025-COMMCON-0001272
12:30 PM - 02:30 PM: 107 - Drywall
12:30 PM - 02:30 PM: 112 - Frame
2026-08-19 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-19 - 2025-MECH-0005016
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-08-18 - 2026-FIRE-0000673
11:00 AM - 03:00 PM: 411 - Rough
2026-08-18 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 106 - Batt Insulation
10:30 AM - 12:30 PM: 107 - Drywall
10:30 AM - 12:30 PM: 112 - Frame
2026-08-17 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-14 - 2025-COMMCON-0001272
11:00 AM - 01:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 112 - Frame
2026-08-13 - 2025-COMMCON-0001272
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-08-12 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 107 - Drywall
10:30 AM - 12:30 PM: 112 - Frame
2026-08-11 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-08-11 - 2025-COMMCON-0001272
08:30 AM - 10:30 AM: 106 - Batt Insulation
08:30 AM - 10:30 AM: 107 - Drywall
2026-08-10 - 2026-FIRE-0002530
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-10 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 106 - Batt Insulation
10:30 AM - 12:30 PM: 107 - Drywall
10:30 AM - 12:30 PM: 112 - Frame
2026-08-10 - 2025-ELEC-0008891
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-07 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-07 - 2025-COMMCON-0001272
08:30 AM - 10:30 AM: 107 - Drywall
08:30 AM - 10:30 AM: 112 - Frame
2026-08-07 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-06 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-06 - 2025-COMMCON-0001272
12:30 PM - 02:30 PM: 106 - Batt Insulation
12:30 PM - 02:30 PM: 107 - Drywall
12:30 PM - 02:30 PM: 112 - Frame
2026-08-06 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-05 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-05 - 2025-COMMCON-0001272
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-08-05 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-04 - 2025-COMMCON-0001272
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-31 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-30 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-30 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-07-30 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-29 - 2026-COMMCON-0001415
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-29 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 112 - Frame
2026-07-28 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-28 - 2025-COMMCON-0001272
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-28 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-27 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-27 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 106 - Batt Insulation
2026-07-27 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-27 - 2026-FIRE-0004044
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-24 - 2026-FIRE-0002530
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2025-COMMCON-0001272
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-07-24 - 2025-ELEC-0008891
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-23 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-23 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-23 - 2026-FIRE-0004044
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-22 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-07-22 - 2026-FIRE-0004044
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-21 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-21 - 2025-COMMCON-0001272
01:00 PM - 02:00 PM: 106 - Batt Insulation
2026-07-21 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-20 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-20 - 2026-FIRE-0000673
01:00 PM - 03:00 PM: 411 - Rough
2026-07-20 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-20 - 2025-COMMCON-0001272
08:30 AM - 09:30 AM: 107 - Drywall
2026-07-17 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-17 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-17 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-07-17 - 2025-COMMCON-0001272
TBD: 106 - Batt Insulation
TBD: 107 - Drywall
2026-07-16 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-16 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-16 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-07-16 - 2025-COMMCON-0001272
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-15 - 2026-FIRE-0002530
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-15 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2025-ELEC-0008891
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-07-15 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-07-14 - 2025-COMMCON-0001272
12:00 PM - 02:00 PM: 112 - Frame
2026-07-14 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-14 - 2026-FIRE-0002530
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-13 - 2026-FIRE-0000673
08:00 AM - 10:00 AM: 411 - Rough
2026-07-13 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-13 - 2025-COMMCON-0001272
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-11 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-11 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-10 - 2025-ELEC-0008891
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-07-10 - 2026-FIRE-0002530
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-10 - 2026-ROOFSIDE-0002747
08:30 AM - 05:30 PM: 205 - Pre Inspection Commercial Flat Roof
2026-07-09 - 2025-ELEC-0008891
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-09 - 2026-FIRE-0002530
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-08 - 2025-ELEC-0008891
12:00 PM - 02:00 PM: 303 - Full Rough
2026-07-08 - 2025-MECH-0005016
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-07-08 - 2026-FIRE-0002530
TBD: 302 - Partial Rough
2026-07-07 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-07-07 - 2025-COMMCON-0001272
12:00 PM - 02:30 PM: 112 - Frame
2026-07-06 - 2026-FIRE-0000673
10:00 AM - 12:00 PM: 411 - Rough
2026-07-06 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 107 - Drywall
2026-07-02 - 2026-FIRE-0002015
10:00 AM - 12:00 PM: 411 - Rough
2026-07-02 - 2026-ROOFSIDE-0002747
12:30 PM - 02:30 PM: 206 - Other
2026-07-02 - 2025-MECH-0005016
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-07-01 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 107 - Drywall
2026-06-30 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 107 - Drywall
2026-06-29 - 2025-BOILERAC-0000609
11:00 AM - 01:00 PM: 703 - Rough
2026-06-26 - 2025-BOILERAC-0000609
01:00 PM - 03:00 PM: 703 - Rough
2026-06-26 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 107 - Drywall
10:30 AM - 12:30 PM: 112 - Frame
2026-06-25 - 2025-ELEC-0008891
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-06-24 - 2026-FIRE-0000673
11:00 AM - 03:00 PM: 411 - Rough
2026-06-24 - 2025-MECH-0005016
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-06-23 - 2025-COMMCON-0001272
10:30 AM - 12:30 PM: 106 - Batt Insulation
2026-06-22 - 2025-MECH-0005016
01:00 PM - 03:00 PM: 902 - Partial Rough
624 S Ogden ST
Recent Inspections
2026-09-11 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 109 - Other
2026-09-03 - 2025-RESCON-0002128
01:00 PM - 03:00 PM: 109 - Other
2026-09-02 - 2026-ROOFSIDE-0005188
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-08-18 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-08-13 - 2025-RESCON-0002128
08:30 AM - 05:30 PM: 105 - Exterior Sheathing
3739 Wynkoop St
Recent Inspections
2026-09-11 - 2026-ELEC-0005735
10:00 AM - 12:30 PM: 301 - Underground
10:00 AM - 12:30 PM: 307 - Service Equipment
2026-09-02 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-26 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 109 - Other
2026-08-20 - 2025-ELEC-0008902
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-20 - 2026-PLUMB-0006051
08:00 AM - 10:00 AM: 401 - Rough
2026-08-19 - 2026-COMMCON-0001233
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-08-19 - 2026-COMMCON-0001137
11:00 AM - 01:00 PM: 500 - Rough
2026-08-07 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-06 - 2025-MECH-0008146
11:00 AM - 01:00 PM: 903 - Rough
2026-07-16 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-15 - 2026-COMMCON-0001137
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
21496 E 53rd PL
Recent Inspections
2026-09-11 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-10 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-02 - 2026-RESCON-0002227
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-08-28 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-20 - 2026-RESCON-0002227
TBD: 113 - Pre Construction Meeting
2026-08-19 - 2026-RESCON-0002227
TBD: 113 - Pre Construction Meeting
2026-08-17 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-14 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-10 - 2026-RESCON-0000310
01:00 PM - 03:00 PM: 109 - Other
2026-07-28 - 2026-PLUMB-0004138
10:30 AM - 12:30 PM: 401 - Rough
2026-07-10 - 2026-RESCON-0000310
11:00 AM - 01:00 PM: 109 - Other
2026-07-08 - 2026-PLUMB-0004138
08:00 AM - 10:30 AM: 401 - Rough
2026-06-24 - 2026-PLUMB-0004138
12:30 PM - 03:00 PM: 401 - Rough
2026-06-22 - 2026-RESCON-0000310
02:00 PM - 03:00 PM: 109 - Other
1680 S Colorado BLVD
Recent Inspections
2026-09-11 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2026-FIRE-0001831
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-09-09 - 2025-ELEC-0012860
08:30 AM - 09:30 AM: 308 - Ceiling
2026-09-08 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-27 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-21 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-21 - 2025-PLUMB-0011276
08:30 AM - 11:30 AM: 401 - Rough
2026-08-20 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-14 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-11 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-08-10 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-08-04 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-08-03 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-29 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-22 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-21 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-17 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-15 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-07-13 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-07-08 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-08 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-01 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-01 - 2026-FIRE-0001831
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-30 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-06-23 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-22 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall