1805 W 34th AVE
Recent Inspections
2026-10-26 - 2025-RESCON-0003852
12:00 PM - 02:00 PM: Document Review
2026-10-08 - 2025-RESCON-0003852
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-10-07 - 2025-RESCON-0003852
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-09-29 - 2025-RESCON-0003851
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 108 - Final - Residential
2026-09-24 - 2025-RESCON-0003851
TBD: Document Review
08:30 AM - 05:30 PM: 108 - Final - Residential
2026-08-21 - 2025-RESCON-0003851
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-07-02 - 2026-DEMO-0000247
10:30 AM - 12:30 PM: Demolition Final Inspection
9100 Pena Blvd
Recent Inspections
2026-10-27 - 2025-COMMCON-0000211
01:00 AM - 03:00 PM: Document Review Inspection
01:00 AM - 03:00 PM: 109 - Other
2026-10-27 - 2025-DEMO-0000666
01:00 AM - 03:00 PM: Demolition Final Inspection
2026-10-27 - 2026-FIRE-0003847
12:30 PM - 02:30 PM: 303 - Full Rough
2026-10-20 - 2025-DEMO-0000667
08:30 AM - 05:30 PM: Electrical Final Inspection
2026-10-20 - 2026-FIRE-0000329
09:00 AM - 11:00 AM: 411 - Rough
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-15 - 2025-DEMO-0000672
08:30 AM - 05:30 PM: Demolition Final Inspection
2026-10-14 - 2025-DEMO-0000671
08:30 AM - 05:30 PM: Demolition Final Inspection
2026-10-14 - 2025-DEMO-0000672
08:30 AM - 05:30 PM: Demolition Final Inspection
2026-10-13 - 2026-FIRE-0005589
12:30 PM - 02:30 PM: 303 - Full Rough
2026-10-13 - 2025-DEMO-0000671
01:00 PM - 03:00 PM: Demolition Final Inspection
2026-10-13 - 2025-DEMO-0000672
01:00 PM - 03:00 PM: Demolition Final Inspection
2026-09-24 - 2025-COMMCON-0001657
10:00 AM - 12:30 PM: 108 - Final - Commercial
2026-09-24 - 2026-COMMCON-0000216
10:00 AM - 12:30 PM: 108 - Final - Commercial
2026-09-23 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: 109 - Other
2026-09-23 - 2025-ELEC-0005813
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-23 - 2026-COMMCON-0000216
01:00 PM - 03:00 PM: 109 - Other
2026-09-22 - 2026-FIRE-0001018
01:00 PM - 03:00 PM: 411 - Rough
2026-09-17 - 2026-ELEC-0007442
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-17 - 2026-MECH-0001018
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-17 - 2026-MECH-0004390
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-16 - 2026-COMMCON-0000216
01:00 PM - 03:00 PM: Document Review Inspection
2026-09-16 - 2026-ELEC-0001703
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-16 - 2026-PLUMB-0001319
11:00 AM - 02:00 PM: 402 - Final - Plumbing
2026-09-16 - 2026-FIRE-0002579
TBD: 303 - Full Rough
2026-09-15 - 2025-COMMCON-0002371
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-15 - 2026-COMMCON-0000185
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-15 - 2026-COMMCON-0000689
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-15 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-11 - 2026-COMMCON-0000216
TBD: Document Review Inspection
2026-09-11 - 2026-FIRE-0002963
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-11 - 2026-FIRE-0003078
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-11 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-11 - 2025-ELEC-0012355
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-11 - 2025-MECH-0006342
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-10 - 2025-MECH-0006342
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-10 - 2025-MECH-0007596
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-09 - 2025-BOILERAC-0000732
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2026-09-09 - 2026-ELEC-0007442
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-09 - 2026-MECH-0001018
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-09 - 2026-PLUMB-0001319
12:00 PM - 02:00 PM: 401 - Rough
2026-09-08 - 2025-FIRE-0006787
11:00 AM - 01:00 PM: 411 - Rough
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-09-08 - 2025-FIRE-0007165
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-09-04 - 2026-FIRE-0002398
01:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-04 - 2026-FIRE-0002399
12:30 PM - 02:30 PM: 303 - Full Rough
2026-09-04 - 2025-COMMCON-0001189
10:30 AM - 12:30 PM: 107 - Drywall
2026-09-04 - 2025-ELEC-0009324
12:30 PM - 02:30 PM: 305 - Final - Electrical
2026-09-04 - 2025-ELEC-0012355
12:30 PM - 02:30 PM: 305 - Final - Electrical
2026-09-04 - 2025-PLUMB-0008504
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-03 - 2026-FIRE-0001932
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-09-03 - 2026-ELEC-0003143
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-02 - 2026-FIRE-0001018
11:00 AM - 01:00 PM: 411 - Rough
2026-09-02 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-02 - 2025-ELEC-0012355
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-02 - 2025-MECH-0007596
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-01 - 2026-FIRE-0000447
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-01 - 2026-FIRE-0001204
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-01 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-01 - 2025-ELEC-0012355
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-01 - 2026-ELEC-0007442
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-31 - 2025-COMMCON-0001657
01:30 PM - 03:00 PM: 109 - Other
2026-08-27 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-26 - 2025-FIRE-0007542
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-26 - 2025-ELEC-0001077
10:00 AM - 12:00 PM: 304 - Partial Final
2026-08-26 - 2026-COMMCON-0000216
01:00 PM - 03:00 PM: 112 - Frame
2026-08-21 - 2025-COMMCON-0001657
08:30 AM - 09:30 AM: 109 - Other
2026-08-19 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-19 - 2026-COMMCON-0000185
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-19 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-18 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-18 - 2026-COMMCON-0000185
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-18 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: Document Review Inspection
2026-08-17 - 2025-COMMCON-0001657
TBD: Document Review Inspection
2026-08-17 - 2026-COMMCON-0000185
TBD: Document Review Inspection
2026-08-17 - 2026-COMMCON-0000712
TBD: Document Review Inspection
2026-08-14 - 2025-PLUMB-0008504
12:00 PM - 02:00 PM: 401 - Rough
2026-08-14 - 2026-COMMCON-0000216
08:30 AM - 09:30 AM: 112 - Frame
2026-08-14 - 2026-PLUMB-0001319
12:00 PM - 02:00 PM: 401 - Rough
2026-08-13 - 2025-BOILERAC-0000732
08:30 AM - 05:30 PM: 703 - Rough
2026-08-13 - 2025-PLUMB-0008504
08:30 AM - 09:30 AM: 401 - Rough
2026-08-12 - 2026-FIRE-0001018
11:00 AM - 02:00 PM: 411 - Rough
2026-08-12 - 2026-COMMCON-0000216
01:00 PM - 03:00 PM: 112 - Frame
2026-08-11 - 2026-PLUMB-0001319
11:00 AM - 02:00 PM: 401 - Rough
2026-08-07 - 2026-ELEC-0001703
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-06 - 2026-ACCCON-0000074
01:00 PM - 03:00 PM: 304 - Partial Final
2026-08-05 - 2026-ACCCON-0000074
09:00 AM - 12:00 PM: 304 - Partial Final
2026-08-05 - 2026-FIRE-0001018
11:00 AM - 01:00 PM: 411 - Rough
2026-08-04 - 2026-MECH-0001018
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-24 - 2025-COMMCON-0001657
01:00 PM - 03:00 PM: Document Review Inspection
2026-07-24 - 2026-COMMCON-0000185
01:00 PM - 03:00 PM: Document Review Inspection
2026-07-24 - 2026-COMMCON-0000712
01:00 PM - 03:00 PM: Document Review Inspection
2026-07-24 - 2026-FIRE-0002963
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-07-24 - 2026-FIRE-0002964
10:00 AM - 12:00 PM: 306 - Final - Conduit Only
2026-07-24 - 2026-FIRE-0003078
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2026-FIRE-0003079
10:00 AM - 12:00 PM: 306 - Final - Conduit Only
2026-07-22 - 2026-FIRE-0001018
09:00 AM - 11:00 AM: 411 - Rough
2026-07-17 - 2025-ELEC-0009324
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-07-17 - 2025-ELEC-0012355
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-07-16 - 2025-ELEC-0009324
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-16 - 2025-ELEC-0012355
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-15 - 2026-ACCCON-0000074
09:00 AM - 12:00 PM: 304 - Partial Final
2026-07-14 - 2025-DEMO-0000666
09:00 AM - 11:00 AM: Demolition Final Inspection
2026-07-14 - 2026-ACCCON-0000074
09:00 AM - 11:00 AM: 304 - Partial Final
2026-07-09 - 2026-ACCCON-0000074
01:00 AM - 03:00 PM: 304 - Partial Final
2026-07-08 - 2025-PLUMB-0008504
09:00 AM - 11:00 AM: 405 - Meter Release
2026-07-07 - 2025-BOILERAC-0000732
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-07-06 - 2025-BOILERAC-0000732
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-07-02 - 2025-FIRE-0007165
10:00 AM - 12:00 PM: 411 - Rough
2026-06-25 - 2026-ACCCON-0000074
10:30 AM - 12:30 PM: 304 - Partial Final
2026-06-25 - 2025-PLUMB-0008504
12:00 PM - 02:00 PM: 405 - Meter Release
2026-06-24 - 2026-FIRE-0002964
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-24 - 2025-PLUMB-0008504
11:00 AM - 02:00 PM: 401 - Rough
2026-06-24 - 2026-COMMCON-0000216
01:00 PM - 03:00 PM: 112 - Frame
2026-06-19 - 2026-ACCCON-0000074
08:30 AM - 05:30 PM: 304 - Partial Final
100 N Detroit ST
Recent Inspections
2026-10-26 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-19 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-10-15 - 2025-BOILERAC-0001018
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-10-15 - 2025-PLUMB-0011743
08:30 AM - 09:30 AM: 401 - Rough
2026-10-14 - 2025-COMMCON-0002723
09:00 AM - 11:00 AM: 107 - Drywall
2026-10-06 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-06 - 2025-PLUMB-0011743
08:00 AM - 10:00 AM: 401 - Rough
2026-10-05 - 2026-ELEC-0000284
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-02 - 2025-COMMCON-0002723
12:00 PM - 02:00 PM: 112 - Frame
2026-09-29 - 2025-MECH-0008716
12:00 PM - 02:00 PM: 903 - Rough
2026-09-29 - 2025-BOILERAC-0001018
TBD: 702 - Partial Rough
2026-09-04 - 2025-BOILERAC-0001018
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-09-04 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-09-04 - 2025-PLUMB-0011743
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-03 - 2026-FIRE-0004117
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-03 - 2025-COMMCON-0002723
10:00 AM - 12:00 PM: 112 - Frame
2026-09-03 - 2026-ELEC-0000284
09:00 AM - 11:00 AM: 308 - Ceiling
2026-09-01 - 2026-FIRE-0003724
11:00 AM - 01:00 PM: 411 - Rough
2026-08-31 - 2025-BOILERAC-0001018
09:00 AM - 11:00 AM: 703 - Rough
2026-08-31 - 2026-FIRE-0004117
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-08-31 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-08-31 - 2026-ELEC-0000284
12:00 PM - 02:30 PM: 308 - Ceiling
2026-08-28 - 2026-ELEC-0000284
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-27 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 109 - Other
2026-08-12 - 2026-FIRE-0003724
08:00 AM - 10:00 AM: 411 - Rough
2026-08-10 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-08-07 - 2025-MECH-0008716
01:00 PM - 03:00 PM: 903 - Rough
2026-08-05 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-08-05 - 2026-ELEC-0000284
09:30 AM - 11:30 PM: 308 - Ceiling
2026-08-04 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-08-04 - 2026-ELEC-0000284
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-25 - 2025-COMMCON-0002723
01:00 PM - 03:00 PM: 112 - Frame
2026-07-24 - 2025-BOILERAC-0001018
08:00 AM - 11:00 AM: 702 - Partial Rough
2026-07-24 - 2025-COMMCON-0002723
01:00 PM - 03:00 PM: 112 - Frame
2026-07-23 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-07-22 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-07-21 - 2026-ELEC-0000284
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-20 - 2025-COMMCON-0002723
09:00 AM - 11:00 AM: 112 - Frame
2026-07-17 - 2026-FIRE-0003724
09:00 AM - 11:00 AM: 411 - Rough
2026-06-30 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 112 - Frame
2026-06-24 - 2025-COMMCON-0002723
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-23 - 2025-COMMCON-0002723
01:00 PM - 03:00 PM: 107 - Drywall
1685 N Newport ST
Recent Inspections
2026-10-26 - 2026-ELEC-0001308
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-23 - 2026-RESCON-0000409
08:30 AM - 05:30 PM: 107 - Drywall
2026-09-18 - 2026-RESCON-0000409
10:00 AM - 12:00 PM: 112 - Frame
2026-09-16 - 2026-RESCON-0000409
08:30 AM - 05:30 PM: 112 - Frame
2026-09-10 - 2026-PLUMB-0007253
10:00 AM - 12:00 PM: 401 - Rough
2026-09-04 - 2026-PLUMB-0007253
10:00 AM - 12:00 PM: 401 - Rough
2026-08-26 - 2026-ELEC-0001308
08:30 AM - 10:30 AM: 303 - Full Rough
2026-07-30 - 2026-RESCON-0000409
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
11150 E Dartmouth AVE
Recent Inspections
2026-10-27 - 2026-FIRE-0003423
08:30 AM - 11:30 AM: 411 - Rough
2026-10-27 - 2026-FIRE-0003424
08:30 AM - 11:30 AM: 411 - Rough
2026-10-26 - 2025-COMMCON-0002294
11:00 AM - 01:00 PM: 103 - Waterproofing
2026-10-26 - 2025-ELEC-0011876
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-10-22 - 2026-FIRE-0004091
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-22 - 2025-ELEC-0011876
10:00 AM - 12:00 PM: 302 - Partial Rough
TBD: 309 - Walls
2026-10-08 - 2025-COMMCON-0002294
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
2026-10-06 - 2025-COMMCON-0002294
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-09-28 - 2026-PLUMB-0000024
10:00 AM - 12:00 PM: 401 - Rough
2026-09-10 - 2025-COMMCON-0002294
10:00 AM - 12:00 PM: 112 - Frame
2026-08-12 - 2026-PLUMB-0000024
08:30 AM - 11:30 AM: 401 - Rough
507 S Clarkson ST
Recent Inspections
2026-10-27 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 112 - Frame
2026-10-26 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 112 - Frame
2026-10-22 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 112 - Frame
2026-10-21 - 2026-ELEC-0001174
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-16 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 112 - Frame
2026-10-16 - 2026-ROOFSIDE-0005440
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-10-16 - 2026-ROOFSIDE-0006421
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-10-15 - 2026-ELEC-0001174
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-15 - 2026-MECH-0006759
09:00 AM - 11:00 AM: 903 - Rough
2026-10-14 - 2026-ROOFSIDE-0005440
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-10-13 - 2026-ROOFSIDE-0005440
01:00 AM - 03:00 PM: 201 - Final - Roof
2026-09-24 - 2026-PLUMB-0004935
01:00 PM - 03:00 PM: 401 - Rough
01:00 PM - 03:00 PM: 403 - Pressure Test
2026-09-11 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-08-06 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 116 - Building Slab
2026-07-24 - 2026-PLUMB-0004935
11:00 AM - 01:00 PM: 400 - Groundwork
11:00 AM - 01:00 PM: 403 - Pressure Test
2026-07-13 - 2026-RESCON-0000484
08:30 AM - 10:30 AM: 100 - Footing
08:30 AM - 10:30 AM: 101 - Foundation Wall
2026-06-22 - 2026-RESCON-0000484
09:00 AM - 11:00 AM: 101 - Foundation Wall
3594 N Grape ST
Recent Inspections
2026-10-27 - 2026-ELEC-0010023
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-10-23 - 2026-ELEC-0010020
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-10-23 - 2026-ELEC-0010023
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-07-28 - 2024-RESCON-0002855
10:00 AM - 01:00 PM: 107 - Drywall
2026-07-28 - 2024-RESCON-0002856
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-21 - 2026-ELEC-0005036
11:00 AM - 01:00 PM: 301 - Underground
2026-07-21 - 2026-ELEC-0005044
11:00 AM - 01:00 PM: 301 - Underground
2026-07-16 - 2024-RESCON-0002855
TBD: Document Review
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-16 - 2024-RESCON-0002856
TBD: Document Review
10:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-08 - 2024-RESCON-0002855
TBD: Document Review
08:30 AM - 05:30 PM: 112 - Frame
2026-07-08 - 2024-RESCON-0002856
TBD: Document Review
08:30 AM - 05:30 PM: 112 - Frame
2026-07-06 - 2024-RESCON-0002855
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2024-RESCON-0002856
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-06-29 - 2026-MECH-0003858
01:00 PM - 03:00 PM: 903 - Rough
2026-06-29 - 2026-MECH-0003859
01:00 PM - 03:00 PM: 903 - Rough
2026-06-24 - 2026-ELEC-0005036
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-24 - 2026-ELEC-0005044
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-23 - 2024-RESCON-0002855
08:30 AM - 05:30 PM: 111 - Exterior Lath
2026-06-23 - 2024-RESCON-0002856
08:30 AM - 05:30 PM: 111 - Exterior Lath
2026-06-22 - 2025-PLUMB-0010025
10:00 AM - 12:00 PM: 401 - Rough
2026-06-22 - 2025-PLUMB-0010026
10:00 AM - 12:00 PM: 401 - Rough
1066 N Fillmore ST
Recent Inspections
2026-10-26 - 2025-RESCON-0001960
12:30 PM - 02:30 PM: 108 - Final - Residential
2026-10-22 - 2025-RESCON-0001960
10:30 AM - 12:30 PM: Document Review
2026-10-02 - 2025-RESCON-0001960
12:30 PM - 02:30 PM: Document Review
12:30 PM - 02:30 PM: 108 - Final - Residential
2026-10-02 - 2026-PLUMB-0002613
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-01 - 2026-RESCON-0001707
10:30 AM - 12:30 PM: 108 - Final - Residential
2026-09-29 - 2026-ELEC-0005834
08:00 AM - 10:30 AM: 305 - Final - Electrical
2026-09-23 - 2026-ELEC-0005834
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-09-16 - 2026-ELEC-0005834
10:00 AM - 12:00 PM: 305 - Final - Electrical
TBD: 313 - Meter Release
2026-09-09 - 2026-RESCON-0001707
01:00 PM - 03:00 PM: 108 - Final - Residential
2026-09-08 - 2026-ELEC-0005834
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-20 - 2026-RESCON-0001707
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-19 - 2026-RESCON-0001707
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-18 - 2026-RESCON-0001707
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2026-RESCON-0001707
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-07-30 - 2026-RESCON-0001707
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-07-06 - 2026-RESCON-0001707
10:30 AM - 12:30 PM: 112 - Frame
2026-07-02 - 2026-ELEC-0005834
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-26 - 2026-ELEC-0005317
08:30 AM - 10:30 AM: 303 - Full Rough
2026-06-24 - 2026-ELEC-0005317
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-23 - 2026-ELEC-0005317
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-22 - 2026-ELEC-0005317
08:30 AM - 09:30 AM: 303 - Full Rough