4600 E Hale Pkwy
Recent Inspections
2026-10-27 - 2026-ELEC-0004012
01:00 PM - 03:00 PM: 308 - Ceiling
2026-10-26 - 2026-COMMCON-0000779
11:00 AM - 02:00 PM: 108 - Final - Commercial
2026-10-23 - 2026-COMMCON-0000779
01:00 PM - 03:00 PM: 109 - Other
2026-10-22 - 2026-COMMCON-0000779
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-10-21 - 2026-PLUMB-0003646
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-10-19 - 2026-COMMCON-0000693
11:00 AM - 01:00 PM: 112 - Frame
2026-10-19 - 2026-PLUMB-0003260
08:00 AM - 10:00 AM: 401 - Rough
2026-10-17 - 2026-ELEC-0004012
12:00 PM - 02:00 PM: 309 - Walls
2026-10-16 - 2026-ELEC-0004012
12:00 PM - 02:00 PM: 309 - Walls
2026-10-13 - 2026-FIRE-0004902
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-09 - 2026-ELEC-0003622
10:00 AM - 12:00 PM: 308 - Ceiling
2026-09-18 - 2026-ELEC-0004012
08:00 AM - 10:00 AM: Document Review
08:00 AM - 10:00 AM: 304 - Partial Final
2026-09-18 - 2026-COMMCON-0000693
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-18 - 2026-ELEC-0003622
08:30 AM - 09:30 AM: 309 - Walls
2026-09-17 - 2026-ELEC-0003622
11:00 AM - 01:00 PM: 309 - Walls
2026-09-17 - 2026-MECH-0002232
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-16 - 2026-ELEC-0004012
08:00 AM - 10:00 AM: 304 - Partial Final
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-12 - 2026-ELEC-0004012
11:00 AM - 01:00 PM: 308 - Ceiling
2026-09-11 - 2026-ELEC-0004012
11:00 AM - 01:00 PM: 308 - Ceiling
2026-09-10 - 2026-ELEC-0003622
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-09 - 2026-PLUMB-0003260
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-09-09 - 2026-PLUMB-0003646
08:00 AM - 10:30 AM: 401 - Rough
2026-09-04 - 2026-ELEC-0004012
11:00 AM - 01:00 PM: 303 - Full Rough
2026-09-03 - 2026-MECH-0002232
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-09-03 - 2026-MECH-0002505
12:00 PM - 02:00 PM: 903 - Rough
2026-08-20 - 2026-PLUMB-0003260
12:00 PM - 03:00 PM: 400 - Groundwork
2026-06-30 - 2026-ELEC-0004012
10:00 AM - 12:00 PM: 309 - Walls
180 W 10th AVE
Recent Inspections
2026-10-27 - 2024-COMMCON-0000905
10:30 AM - 12:00 PM: 108 - Final - Commercial
2026-10-27 - 2024-ELEC-0005224
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-27 - 2026-ELEC-0010307
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-19 - 2026-MECH-0003801
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-13 - 2024-COMMCON-0000905
08:30 AM - 09:30 AM: 112 - Frame
2026-10-09 - 2026-MECH-0003801
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-10-08 - 2024-COMMCON-0000905
09:29 AM - 11:00 AM: 112 - Frame
2026-10-08 - 2026-MECH-0003801
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-01 - 2026-MECH-0003801
08:30 AM - 11:00 AM: Document Review
2026-09-29 - 2024-ELEC-0005224
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-22 - 2026-MECH-0003801
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-14 - 2024-ELEC-0005224
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-11 - 2026-MECH-0003801
08:30 AM - 11:00 AM: Document Review
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-10 - 2024-COMMCON-0000905
10:00 AM - 12:00 PM: 109 - Other
10:00 AM - 12:00 PM: 112 - Frame
2026-09-10 - 2026-MECH-0003801
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-09-08 - 2024-ELEC-0005224
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-08 - 2026-COMMCON-0001208
01:00 PM - 03:00 PM: 112 - Frame
2026-09-08 - 2026-MECH-0003801
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-04 - 2024-ELEC-0005224
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-08-06 - 2025-FIRE-0001522
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-06 - 2025-FIRE-0007192
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-07-28 - 2024-COMMCON-0000905
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-07-27 - 2024-COMMCON-0000905
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-07-24 - 2024-ELEC-0005224
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-24 - 2026-COMMCON-0001208
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-07-24 - 2026-MECH-0003801
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-08 - 2024-COMMCON-0000905
TBD: Document Review Inspection
2026-07-08 - 2026-COMMCON-0001208
TBD: Document Review Inspection
2026-07-07 - 2024-ELEC-0005224
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-07 - 2025-MECH-0001182
08:30 AM - 11:00 AM: 903 - Rough
2026-06-30 - 2025-MECH-0001182
08:00 AM - 11:00 AM: 903 - Rough
2026-06-29 - 2025-MECH-0001182
08:00 AM - 11:00 AM: 903 - Rough
2026-06-22 - 2024-ELEC-0005224
08:00 AM - 10:00 AM: 305 - Final - Electrical
08:00 AM - 10:00 AM: 307 - Service Equipment
2552 E Alameda AVE
Recent Inspections
2026-10-27 - 2026-ELEC-0009617
12:00 PM - 02:30 PM: 303 - Full Rough
2026-10-22 - 2026-RESCON-0000372
09:00 AM - 11:00 AM: 112 - Frame
2026-10-21 - 2026-MECH-0003696
01:00 PM - 03:00 PM: 903 - Rough
2026-10-19 - 2026-RESCON-0000372
09:00 AM - 11:00 AM: 112 - Frame
2026-10-16 - 2026-ELEC-0009617
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-21 - 2026-PLUMB-0006765
01:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-09-11 - 2026-ELEC-0007893
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-04 - 2026-PLUMB-0006249
08:30 AM - 11:31 AM: 400 - Groundwork
08:30 AM - 11:31 AM: 401 - Rough
958 S Columbine ST
Recent Inspections
2026-10-27 - 2026-ELEC-0008920
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-30 - 2026-ELEC-0007497
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-29 - 2026-ELEC-0007497
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-08 - 2026-PLUMB-0007268
08:00 AM - 10:30 AM: 403 - Pressure Test
2026-08-17 - 2026-ELEC-0007497
11:00 AM - 01:00 PM: 301 - Underground
2026-08-15 - 2026-ELEC-0007497
TBD: 301 - Underground
TBD: 303 - Full Rough
2026-08-14 - 2026-PLUMB-0006361
08:00 AM - 10:00 AM: 403 - Pressure Test
2026-08-14 - 2026-ELEC-0007497
TBD: 301 - Underground
TBD: 303 - Full Rough
2026-08-07 - 2026-RESCON-0002274
TBD: 113 - Pre Construction Meeting
2026-08-06 - 2026-RESCON-0002274
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
8215 E BELLEVIEW AVE
Recent Inspections
2026-10-27 - 2025-PLUMB-0008889
08:30 AM - 11:30 AM: 403 - Pressure Test
08:30 AM - 11:30 AM: 405 - Meter Release
2026-10-23 - 2025-COMMCON-0001535
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-10-22 - 2025-COMMCON-0001535
11:00 AM - 01:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-10-20 - 2025-PLUMB-0008889
10:00 AM - 12:00 PM: 401 - Rough
2026-10-14 - 2025-COMMCON-0001535
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-10-13 - 2025-COMMCON-0001535
12:00 PM - 02:00 PM: 109 - Other
2026-10-02 - 2025-COMMCON-0001535
01:00 PM - 03:00 PM: 107 - Drywall
2026-10-02 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-09-17 - 2025-COMMCON-0001535
11:00 AM - 01:00 PM: 109 - Other
2026-08-27 - 2025-ELEC-0009408
07:00 AM - 01:00 PM: 300 - Slab
2026-08-26 - 2025-ELEC-0009408
07:00 AM - 01:00 PM: 300 - Slab
2026-08-20 - 2025-ELEC-0005249
12:00 PM - 02:00 PM: 301 - Underground
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-08-12 - 2025-ELEC-0009408
08:30 AM - 09:30 AM: 300 - Slab
2026-08-11 - 2025-ELEC-0009408
08:30 AM - 09:30 AM: 300 - Slab
2026-08-07 - 2026-COMMCON-0001259
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-08-06 - 2025-ELEC-0005249
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-08-01 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-07-31 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-07-30 - 2025-ELEC-0005249
08:30 AM - 09:30 AM: 301 - Underground
2026-07-28 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-07-28 - 2025-PLUMB-0005070
09:00 AM - 11:30 AM: 405 - Meter Release
2026-07-27 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-07-22 - 2025-PLUMB-0005070
08:30 AM - 11:30 AM: 401 - Rough
2026-07-21 - 2025-ELEC-0009408
TBD: 300 - Slab
2026-07-16 - 2025-COMMCON-0001535
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-07-09 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-07-02 - 2025-ELEC-0005249
01:00 PM - 03:00 PM: 301 - Underground
2026-07-02 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
2026-06-23 - 2025-ELEC-0009408
01:00 PM - 03:00 PM: 300 - Slab
7521 N Gun Club RD
Recent Inspections
2026-10-27 - 2025-COMMCON-0000976
09:00 AM - 11:00 AM: 109 - Other
09:00 AM - 11:00 AM: 112 - Frame
2026-10-26 - 2025-COMMCON-0000976
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-10-23 - 2025-COMMCON-0000976
08:00 AM - 10:00 AM: 109 - Other
08:00 AM - 10:00 AM: 112 - Frame
2026-10-22 - 2025-ELEC-0009209
10:00 AM - 12:00 PM: 308 - Ceiling
2026-10-21 - 2025-COMMCON-0000976
11:00 AM - 12:30 PM: 109 - Other
11:00 AM - 12:30 PM: 112 - Frame
2026-10-19 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-10-19 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-10-15 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 109 - Other
2026-10-13 - 2025-COMMCON-0000976
10:30 AM - 12:30 PM: 109 - Other
10:30 AM - 12:30 PM: 112 - Frame
2026-10-09 - 2025-COMMCON-0000976
11:45 AM - 12:30 PM: 109 - Other
2026-10-09 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 903 - Rough
2026-10-07 - 2025-COMMCON-0000976
10:30 AM - 12:30 PM: 112 - Frame
2026-10-02 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 308 - Ceiling
2026-09-29 - 2026-BOILERAC-0000528
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-09-25 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-09-25 - 2025-PLUMB-0006470
01:00 AM - 03:00 PM: 401 - Rough
2026-09-23 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-09-23 - 2026-ELEC-0007038
12:00 PM - 02:00 PM: 308 - Ceiling
2026-09-23 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 903 - Rough
2026-09-23 - 2026-FIRE-0002639
11:00 AM - 01:00 PM: 411 - Rough
2026-09-23 - 2025-ELEC-0009209
TBD: 308 - Ceiling
2026-09-17 - 2025-PLUMB-0006470
09:00 AM - 11:00 AM: 401 - Rough
2026-09-15 - 2025-PLUMB-0006470
11:00 AM - 02:00 PM: 401 - Rough
2026-09-14 - 2025-PLUMB-0006470
08:00 AM - 10:00 AM: 401 - Rough
2026-09-11 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-10 - 2025-ELEC-0009209
08:00 AM - 10:00 AM: 309 - Walls
2026-09-04 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 901 - Pressure Test
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-04 - 2026-BOILERAC-0000528
08:30 AM - 05:30 PM: 701 - Pressure Test
2026-09-03 - 2025-ELEC-0008285
12:30 PM - 02:30 PM: 305 - Final - Electrical
12:30 PM - 02:30 PM: 313 - Meter Release
2026-09-02 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
2026-09-01 - 2025-ELEC-0008285
12:30 PM - 02:30 PM: 303 - Full Rough
2026-08-31 - 2026-COMMCON-0000722
TBD: 109 - Other
2026-08-27 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 901 - Pressure Test
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-20 - 2026-FIRE-0000274
09:00 AM - 11:00 AM: 410 - Underground
2026-08-20 - 2025-COMMCON-0000976
09:30 AM - 11:30 AM: 106 - Batt Insulation
09:30 AM - 11:30 AM: 107 - Drywall
09:30 AM - 11:30 AM: 109 - Other
2026-08-19 - 2026-BOILERAC-0000343
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-08-19 - 2026-FIRE-0002639
11:00 AM - 01:00 PM: 411 - Rough
2026-08-18 - 2026-BOILERAC-0000343
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-08-17 - 2025-COMMCON-0000976
11:30 AM - 01:30 PM: Document Review Inspection
11:30 AM - 01:30 PM: 112 - Frame
2026-08-17 - 2025-ELEC-0009209
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-14 - 2025-PLUMB-0006470
10:00 AM - 12:00 PM: 401 - Rough
2026-08-13 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0009209
08:30 AM - 09:30 AM: 307 - Service Equipment
08:30 AM - 09:30 AM: 309 - Walls
08:30 AM - 09:30 AM: 313 - Meter Release
2026-08-13 - 2026-MECH-0002668
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-12 - 2026-FIRE-0002639
11:00 AM - 02:00 PM: 411 - Rough
2026-08-12 - 2025-PLUMB-0006470
11:00 AM - 02:00 PM: 401 - Rough
2026-08-11 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-08-10 - 2025-PLUMB-0006470
10:15 AM - 12:15 PM: 401 - Rough
2026-08-06 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-05 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 109 - Other
08:30 AM - 09:30 AM: 112 - Frame
2026-08-04 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
2026-08-04 - 2025-COMMCON-0000976
01:00 PM - 03:00 PM: 109 - Other
2026-08-03 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 112 - Frame
2026-08-03 - 2025-MECH-0004556
09:00 AM - 11:00 AM: 903 - Rough
2026-07-31 - 2025-COMMCON-0000976
08:30 AM - 10:30 AM: 112 - Frame
2026-07-30 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-29 - 2025-ELEC-0009209
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-07-28 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-17 - 2025-COMMCON-0000976
11:30 AM - 12:30 PM: 106 - Batt Insulation
11:30 AM - 12:30 PM: 107 - Drywall
11:30 AM - 12:30 PM: 112 - Frame
2026-07-17 - 2026-MECH-0002668
09:00 AM - 11:00 AM: 900 - Groundwork
2026-07-14 - 2025-ELEC-0009209
09:00 AM - 11:00 AM: 309 - Walls
2026-07-13 - 2025-COMMCON-0000976
10:00 AM - 12:30 PM: Document Review Inspection
2026-07-09 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 105 - Exterior Sheathing
08:30 AM - 09:30 AM: 112 - Frame
2026-07-07 - 2025-COMMCON-0000976
08:30 AM - 09:30 AM: 105 - Exterior Sheathing
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 112 - Frame
2026-06-25 - 2025-COMMCON-0000976
09:00 AM - 10:00 AM: 103 - Waterproofing
09:00 AM - 10:00 AM: 106 - Batt Insulation
09:00 AM - 10:00 AM: 107 - Drywall
09:00 AM - 10:00 AM: 109 - Other
09:00 AM - 10:00 AM: 112 - Frame
2026-06-23 - 2025-PLUMB-0006470
11:00 AM - 01:00 PM: 401 - Rough
3085 S ZUNI
Recent Inspections
2026-10-27 - 2026-ELEC-0000899
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-09-17 - 2025-COMMCON-0002619
10:30 AM - 12:30 PM: 107 - Drywall
2026-09-01 - 2025-COMMCON-0002619
12:30 PM - 02:30 PM: 106 - Batt Insulation
2026-08-21 - 2025-COMMCON-0002619
10:30 AM - 12:30 PM: 112 - Frame
1242 S Broadway
Recent Inspections
2026-10-27 - 2026-ELEC-0001200
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-10-06 - 2026-PLUMB-0001328
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-05 - 2026-PLUMB-0001328
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-06 - 2026-COMMCON-0000022
TBD: Document Review Inspection
2026-08-06 - 2026-MECH-0001043
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-07-28 - 2026-COMMCON-0000022
08:30 AM - 09:30 AM: 109 - Other
2026-07-15 - 2026-COMMCON-0000022
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-14 - 2026-COMMCON-0000022
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2026-COMMCON-0000022
01:00 PM - 03:00 PM: 112 - Frame
2026-07-13 - 2026-MECH-0001043
09:00 AM - 11:00 AM: 903 - Rough
2026-07-10 - 2026-COMMCON-0000022
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-09 - 2026-COMMCON-0000022
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-06 - 2026-COMMCON-0001073
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-06 - 2026-ELEC-0001200
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 308 - Ceiling
2026-06-25 - 2026-COMMCON-0000022
09:00 AM - 11:00 AM: 112 - Frame
2026-06-25 - 2026-PLUMB-0001328
08:00 AM - 10:00 AM: 401 - Rough
2026-06-24 - 2026-COMMCON-0000022
09:00 AM - 11:00 AM: 112 - Frame
2026-06-24 - 2026-PLUMB-0001328
08:00 AM - 10:00 AM: 401 - Rough
2283 S Sherman St
Recent Inspections
2026-10-26 - 2026-ELEC-0004175
12:00 PM - 02:30 PM: 301 - Underground
2026-10-20 - 2026-ROOFSIDE-0002371
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-10-15 - 2026-ELEC-0004175
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 313 - Meter Release
2026-09-24 - 2025-RESCON-0000092
08:30 AM - 10:30 AM: 105 - Exterior Sheathing
2026-07-24 - 2025-RESCON-0000092
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-23 - 2025-RESCON-0000092
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-22 - 2025-RESCON-0000092
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-16 - 2025-RESCON-0000092
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-15 - 2025-RESCON-0000092
11:00 AM - 01:00 PM: 112 - Frame
2026-07-15 - 2026-ROOFSIDE-0002371
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-14 - 2025-RESCON-0000092
12:00 PM - 02:00 PM: 112 - Frame
2026-07-13 - 2025-RESCON-0000092
09:00 AM - 11:00 AM: 112 - Frame
2026-07-10 - 2025-RESCON-0000092
01:00 PM - 03:00 PM: 112 - Frame
2026-07-09 - 2025-RESCON-0000092
09:00 AM - 11:00 AM: 112 - Frame
2026-07-08 - 2025-RESCON-0000092
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2026-PLUMB-0001072
12:00 PM - 02:00 PM: 401 - Rough
2026-06-29 - 2026-ELEC-0004174
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-27 - 2026-ELEC-0004174
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-26 - 2026-ELEC-0004174
12:00 PM - 02:00 PM: 303 - Full Rough
2281 S Sherman ST
Recent Inspections
2026-10-26 - 2026-ELEC-0004171
12:00 PM - 02:30 PM: 301 - Underground
2026-10-20 - 2026-ROOFSIDE-0002370
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-10-15 - 2026-ELEC-0004171
01:00 PM - 03:00 PM: 303 - Full Rough
01:00 PM - 03:00 PM: 313 - Meter Release
2026-10-02 - 2025-RESCON-0000090
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-10-01 - 2025-RESCON-0000090
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-09-29 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 105 - Exterior Sheathing
2026-09-26 - 2025-RESCON-0000090
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-25 - 2025-RESCON-0000090
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-18 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 109 - Other
2026-09-17 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 109 - Other
2026-07-24 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-23 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-22 - 2025-RESCON-0000090
01:00 PM - 03:00 PM: 107 - Drywall
2026-07-16 - 2025-RESCON-0000090
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-15 - 2026-ROOFSIDE-0002370
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-07-14 - 2025-RESCON-0000090
12:00 PM - 02:00 PM: 112 - Frame
2026-07-13 - 2025-RESCON-0000090
09:00 AM - 11:00 AM: 112 - Frame
2026-07-10 - 2025-RESCON-0000090
01:00 PM - 03:00 PM: 112 - Frame
2026-07-09 - 2025-RESCON-0000090
09:00 AM - 11:00 AM: 112 - Frame
2026-07-08 - 2025-RESCON-0000090
01:00 PM - 03:00 PM: 112 - Frame
2026-07-07 - 2026-PLUMB-0001068
11:00 AM - 02:00 PM: 401 - Rough
2026-07-06 - 2026-PLUMB-0001068
12:00 PM - 02:00 PM: 401 - Rough
2026-06-29 - 2026-ELEC-0004170
11:00 AM - 01:00 PM: 303 - Full Rough
2026-06-27 - 2026-ELEC-0004170
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-26 - 2026-ELEC-0004170
12:00 PM - 02:00 PM: 303 - Full Rough
2026-06-22 - 2026-MECH-0002934
01:00 PM - 03:00 PM: 903 - Rough