680 N Albion ST
Recent Inspections
2026-10-27 - 2026-MECH-0001443
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-08-18 - 2026-ELEC-0002010
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-08-18 - 2026-MECH-0001443
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-08-18 - 2026-PLUMB-0000956
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-07-11 - 2026-ELEC-0002010
TBD: 313 - Meter Release
2026-07-10 - 2026-ELEC-0002010
10:00 AM - 12:00 PM: 305 - Final - Electrical
TBD: 307 - Service Equipment
TBD: 313 - Meter Release
6407 N Tower RD
Recent Inspections
2026-10-26 - 2026-MECH-0005151
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-10-21 - 2026-COMMCON-0001548
11:00 AM - 12:30 PM: 107 - Drywall
2026-10-21 - 2026-MECH-0005151
09:00 AM - 11:00 AM: 903 - Rough
2026-10-16 - 2026-FIRE-0005622
08:00 AM - 10:30 AM: 411 - Rough
2026-10-16 - 2026-COMMCON-0001548
01:00 AM - 03:00 PM: 107 - Drywall
01:00 AM - 03:00 PM: 112 - Frame
2026-10-16 - 2026-ELEC-0003650
12:30 PM - 02:30 PM: 308 - Ceiling
2026-10-15 - 2026-PLUMB-0006934
08:00 AM - 10:30 AM: 400 - Groundwork
08:00 AM - 10:30 AM: 401 - Rough
2026-10-15 - 2026-PLUMB-0007243
08:00 AM - 10:30 AM: 400 - Groundwork
2026-10-14 - 2026-MECH-0004399
09:00 AM - 11:00 AM: 903 - Rough
2026-10-13 - 2026-COMMCON-0000781
10:30 AM - 12:30 PM: 109 - Other
2026-10-09 - 2026-FIRE-0005341
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-10-08 - 2026-COMMCON-0000717
11:00 AM - 12:00 PM: 107 - Drywall
2026-10-07 - 2026-FIRE-0002874
12:30 PM - 02:30 PM: 302 - Partial Rough
2026-10-07 - 2026-COMMCON-0000717
10:30 AM - 12:30 PM: 112 - Frame
2026-10-07 - 2026-ELEC-0003363
12:30 PM - 02:30 PM: 308 - Ceiling
2026-10-07 - 2026-MECH-0005151
09:00 AM - 11:00 AM: 903 - Rough
2026-10-06 - 2026-FIRE-0003621
08:00 AM - 10:30 AM: 411 - Rough
2026-10-02 - 2026-COMMCON-0001093
09:00 AM - 11:00 AM: 113 - Pre Construction Meeting
2026-10-02 - 2026-PLUMB-0006934
10:30 AM - 12:30 PM: Document Review
2026-10-02 - 2026-COMMCON-0001548
09:00 AM - 11:00 AM: 112 - Frame
2026-10-01 - 2026-COMMCON-0000717
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-01 - 2026-ELEC-0003363
12:30 PM - 02:30 PM: 308 - Ceiling
2026-09-29 - 2026-PLUMB-0006676
10:30 AM - 12:30 PM: 405 - Meter Release
2026-09-28 - 2026-COMMCON-0000717
11:00 AM - 12:30 PM: 107 - Drywall
2026-09-28 - 2026-MECH-0005408
09:00 AM - 11:00 AM: 903 - Rough
2026-09-28 - 2026-PLUMB-0006676
12:15 PM - 03:00 PM: 401 - Rough
2026-09-25 - 2026-COMMCON-0000717
01:00 PM - 03:00 PM: 112 - Frame
2026-09-25 - 2026-ELEC-0007423
12:30 PM - 02:30 PM: 303 - Full Rough
2026-09-25 - 2026-MECH-0005408
09:00 AM - 11:00 AM: 903 - Rough
2026-09-24 - 2026-PLUMB-0006934
08:30 AM - 10:30 AM: 400 - Groundwork
08:30 AM - 10:30 AM: 401 - Rough
2026-09-23 - 2026-ELEC-0003363
01:00 PM - 03:00 PM: 309 - Walls
2026-09-22 - 2026-PLUMB-0006676
12:30 PM - 03:00 PM: 401 - Rough
2026-09-22 - 2026-PLUMB-0006934
12:30 PM - 03:00 PM: 400 - Groundwork
08:30 AM - 09:30 AM: 401 - Rough
2026-09-21 - 2026-PLUMB-0006934
08:30 AM - 10:15 AM: 400 - Groundwork
08:30 AM - 10:15 AM: 401 - Rough
2026-09-09 - 2026-COMMCON-0001548
07:30 AM - 08:00 AM: 113 - Pre Construction Meeting
2026-09-08 - 2026-ELEC-0003363
12:30 PM - 02:30 PM: 301 - Underground
2026-09-04 - 2026-COMMCON-0000717
10:30 AM - 12:30 PM: 113 - Pre Construction Meeting
2026-09-03 - 2026-PLUMB-0006676
08:00 AM - 10:30 AM: 400 - Groundwork
2026-09-02 - 2026-COMMCON-0000781
01:00 AM - 03:00 PM: 107 - Drywall
2026-08-21 - 2026-ELEC-0003650
10:00 AM - 12:00 PM: 309 - Walls
2026-08-21 - 2026-PLUMB-0005723
10:30 AM - 12:30 PM: 401 - Rough
2026-08-18 - 2026-PLUMB-0005723
01:00 PM - 03:00 PM: 401 - Rough
2026-08-04 - 2026-COMMCON-0000781
11:00 AM - 12:30 PM: 109 - Other
2026-07-31 - 2026-ELEC-0003650
12:30 PM - 02:30 PM: 301 - Underground
2026-07-24 - 2026-PLUMB-0005723
10:00 AM - 12:00 PM: 400 - Groundwork
2026-07-02 - 2025-COMMCON-0000755
01:00 AM - 03:00 PM: 108 - Final - Commercial
2026-07-01 - 2025-COMMCON-0000755
08:30 AM - 09:30 AM: 108 - Final - Commercial
08:30 AM - 09:30 AM: 121 - Certificate of Occupancy
2026-06-24 - 2025-COMMCON-0000755
08:00 AM - 10:00 AM: 108 - Final - Commercial
08:00 AM - 10:00 AM: 121 - Certificate of Occupancy
2026-06-24 - 2025-COMMCON-0002605
08:00 AM - 10:00 AM: 108 - Final - Commercial
2026-06-24 - 2025-PLUMB-0005166
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-06-24 - 2026-COMMCON-0000069
08:00 AM - 10:00 AM: 108 - Final - Commercial
2026-06-24 - 2026-PLUMB-0003648
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-06-23 - 2025-COMMCON-0000755
01:30 PM - 03:00 PM: 108 - Final - Commercial
01:30 PM - 03:00 PM: 121 - Certificate of Occupancy
624 S Ogden ST
Recent Inspections
2026-10-26 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 112 - Frame
2026-10-22 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
09:00 AM - 11:00 AM: 112 - Frame
2026-10-21 - 2026-MECH-0006263
09:00 AM - 11:00 AM: 903 - Rough
2026-10-20 - 2026-MECH-0006263
10:00 AM - 01:00 PM: 903 - Rough
2026-10-19 - 2026-ELEC-0009706
12:00 PM - 02:00 PM: 303 - Full Rough
2026-10-16 - 2026-PLUMB-0004652
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-05 - 2026-MECH-0006263
09:00 AM - 11:00 AM: 903 - Rough
2026-10-02 - 2026-MECH-0005576
09:00 AM - 11:00 AM: 903 - Rough
2026-10-02 - 2026-PLUMB-0004652
08:30 AM - 11:30 AM: 401 - Rough
08:30 AM - 11:30 AM: 405 - Meter Release
2026-10-01 - 2026-MECH-0005576
08:30 AM - 09:30 AM: 903 - Rough
2026-10-01 - 2026-PLUMB-0004652
08:00 AM - 10:00 AM: 401 - Rough
10:00 AM - 12:00 PM: 405 - Meter Release
2026-09-30 - 2026-PLUMB-0004652
08:00 AM - 10:00 AM: 401 - Rough
2026-09-18 - 2025-RESCON-0002128
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-16 - 2026-ROOFSIDE-0005188
09:00 AM - 11:00 AM: 205 - Pre Inspection Commercial Flat Roof
2026-09-11 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 109 - Other
2026-09-03 - 2025-RESCON-0002128
01:00 PM - 03:00 PM: 109 - Other
2026-09-02 - 2026-ROOFSIDE-0005188
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
2026-08-18 - 2025-RESCON-0002128
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-08-13 - 2025-RESCON-0002128
08:30 AM - 05:30 PM: 105 - Exterior Sheathing
3739 Wynkoop St
Recent Inspections
2026-10-27 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-10-26 - 2025-MECH-0008146
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-26 - 2026-MECH-0004743
11:00 AM - 01:00 PM: Document Review
2026-10-23 - 2026-ACCCON-0000229
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-10-23 - 2026-MECH-0004743
08:30 AM - 10:30 AM: 904 - Final - Mechanical
2026-10-15 - 2026-ELEC-0005735
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-13 - 2026-PLUMB-0006051
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-08 - 2026-ELEC-0005735
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-09-11 - 2026-ELEC-0005735
10:00 AM - 12:30 PM: 301 - Underground
10:00 AM - 12:30 PM: 307 - Service Equipment
2026-09-02 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-26 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 109 - Other
2026-08-20 - 2025-ELEC-0008902
10:30 AM - 01:00 PM: 302 - Partial Rough
2026-08-20 - 2026-PLUMB-0006051
08:00 AM - 10:00 AM: 401 - Rough
2026-08-19 - 2026-COMMCON-0001233
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-08-19 - 2026-COMMCON-0001137
11:00 AM - 01:00 PM: 500 - Rough
2026-08-07 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-08-06 - 2025-MECH-0008146
11:00 AM - 01:00 PM: 903 - Rough
2026-07-16 - 2026-COMMCON-0001137
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-15 - 2026-COMMCON-0001137
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
1680 S Colorado BLVD
Recent Inspections
2026-10-26 - 2026-FIRE-0001831
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-10-26 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 301 - Underground
10:00 AM - 12:00 PM: 308 - Ceiling
2026-10-01 - 2026-FIRE-0001831
10:00 AM - 12:00 PM: 301 - Underground
2026-10-01 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 301 - Underground
2026-09-24 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-23 - 2025-COMMCON-0001782
01:00 PM - 03:00 PM: 112 - Frame
2026-09-22 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-09-17 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-17 - 2026-FIRE-0001831
TBD: 302 - Partial Rough
2026-09-15 - 2025-BOILERAC-0000981
09:00 AM - 11:00 AM: 702 - Partial Rough
2026-09-15 - 2025-MECH-0008464
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-09-11 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2026-FIRE-0001831
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-09-09 - 2025-ELEC-0012860
08:30 AM - 09:30 AM: 308 - Ceiling
2026-09-08 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-27 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-21 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-21 - 2025-PLUMB-0011276
08:30 AM - 11:30 AM: 401 - Rough
2026-08-20 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-14 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-11 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-08-10 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-08-04 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-08-03 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-29 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-22 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-21 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-17 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-15 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-07-13 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-07-08 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-08 - 2025-ELEC-0012860
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-01 - 2025-ELEC-0012860
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-01 - 2026-FIRE-0001831
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-30 - 2025-COMMCON-0001782
09:00 AM - 11:00 AM: 109 - Other
2026-06-23 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-22 - 2025-COMMCON-0001782
11:00 AM - 01:00 PM: 107 - Drywall
925 N Steele ST
Recent Inspections
2026-10-26 - 2025-RESCON-0002925
12:30 PM - 02:30 PM: 108 - Final - Residential
2026-10-22 - 2025-RESCON-0002925
12:30 PM - 02:30 PM: Document Review
10:30 AM - 12:30 PM: 109 - Other
2026-10-22 - 2026-MECH-0001095
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-21 - 2025-RESCON-0002925
10:30 AM - 12:30 PM: 108 - Final - Residential
2026-10-20 - 2026-PLUMB-0000919
12:00 PM - 03:00 PM: 402 - Final - Plumbing
2026-08-12 - 2026-MECH-0001642
08:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-08-11 - 2026-ELEC-0000218
11:00 AM - 01:00 PM: 305 - Final - Electrical
721 S York ST
Recent Inspections
2026-10-27 - 2026-ROOFSIDE-0001195
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-10-26 - 2026-ROOFSIDE-0001195
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-28 - 2026-ELEC-0003737
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-28 - 2026-ELEC-0005147
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-28 - 2026-MECH-0002542
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-17 - 2026-PLUMB-0003748
01:00 AM - 03:00 PM: 402 - Final - Plumbing
2026-09-16 - 2026-PLUMB-0003748
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-27 - 2026-ELEC-0005147
08:00 AM - 01:00 PM: 305 - Final - Electrical
2026-08-27 - 2026-ELEC-0003737
08:00 AM - 01:00 PM: 305 - Final - Electrical
620 N Pontiac ST
Recent Inspections
2026-10-27 - 2026-RESCON-0002345
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-21 - 2025-PLUMB-0006364
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-10-21 - 2026-MECH-0001174
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-08-26 - 2024-RESCON-0003700
11:00 AM - 01:00 PM: 100 - Footing
11:00 AM - 01:00 PM: 101 - Foundation Wall
11:00 AM - 01:00 PM: 102 - Foundation Perimeter Drain
11:00 AM - 01:00 PM: 103 - Waterproofing
11:00 AM - 01:00 PM: 109 - Other
4900 N Race ST
Recent Inspections
2026-10-26 - 2026-ELEC-0007611
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-21 - 2026-ELEC-0007611
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-10-20 - 2026-COMMCON-0001584
08:30 AM - 09:30 AM: 113 - Pre Construction Meeting
2026-10-14 - 2026-ELEC-0007611
10:00 AM - 12:30 PM: 302 - Partial Rough
2026-09-24 - 2026-COMMCON-0001584
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-09-17 - 2024-ELEC-0006784
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-09-16 - 2026-ACCCON-0000037
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-09-08 - 2026-ACCCON-0000037
11:00 AM - 01:00 PM: 305 - Final - Access Control
2026-08-31 - 2026-ACCCON-0000037
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-08-14 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-13 - 2025-FIRE-0003719
08:30 AM - 05:30 PM: 412 - Final - Fire Suppression
2026-08-13 - 2024-COMMCON-0000266
08:30 AM - 09:30 AM: 109 - Other
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-08-12 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 109 - Other
2026-08-06 - 2024-COMMCON-0000266
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-08-05 - 2026-ACCCON-0000037
01:00 PM - 03:00 PM: 304 - Partial Final
2026-08-03 - 2026-FIRE-0003318
08:30 AM - 05:30 PM: 303 - Full Rough
2026-07-31 - 2024-ELEC-0006784
10:00 AM - 12:00 PM: 304 - Partial Final
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-07-31 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-07-31 - 2025-ELEC-0005951
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-07-31 - 2026-ELEC-0004520
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-07-30 - 2024-ELEC-0006784
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-29 - 2024-ELEC-0006784
TBD: 304 - Partial Final
2026-07-29 - 2025-FIRE-0003466
TBD: 303 - Full Rough
2026-07-29 - 2026-FIRE-0002228
08:00 AM - 10:30 AM: 303 - Full Rough
2026-07-29 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-07-28 - 2024-ELEC-0006784
10:00 AM - 12:30 PM: 304 - Partial Final
2026-07-22 - 2025-FIRE-0003719
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-07-22 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 112 - Frame
2026-07-21 - 2024-BOILERAC-0000532
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-07-21 - 2025-FIRE-0003719
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-07-21 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 109 - Other
2026-07-21 - 2024-MECH-0004412
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-21 - 2025-MECH-0004622
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-07-21 - 2026-MECH-0002103
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-07-20 - 2024-COMMCON-0000266
01:00 PM - 03:00 PM: 112 - Frame
2026-07-20 - 2024-ELEC-0006784
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-17 - 2025-BOILERAC-0000575
11:00 AM - 01:00 PM: 704 - Final - Boiler AC
2026-07-17 - 2024-ELEC-0006784
08:00 AM - 10:00 AM: 304 - Partial Final
2026-07-17 - 2024-MECH-0004412
11:00 AM - 01:00 PM: Document Review
2026-07-14 - 2025-FIRE-0003719
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-07-02 - 2026-COMMCON-0000180
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-06-30 - 2024-ELEC-0006784
08:30 AM - 10:30 AM: 307 - Service Equipment
2026-06-24 - 2026-ELEC-0004486
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-06-23 - 2025-FIRE-0003719
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-06-22 - 2026-ELEC-0004486
08:30 AM - 10:30 AM: 305 - Final - Electrical