901 N Navajo ST
Recent Inspections
2026-10-27 - 2024-PLUMB-0011686
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-26 - 2024-BOILERAC-0000925
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-10-26 - 2025-ACCCON-0000459
09:30 AM - 11:00 AM: 304 - Partial Final
2026-10-26 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-26 - 2024-MECH-0008125
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-23 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-22 - 2024-ELEC-0010905
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-21 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-10-21 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-10-20 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-20 - 2025-FIRE-0002211
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-20 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-20 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-19 - 2024-BOILERAC-0000842
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-10-19 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-19 - 2025-FIRE-0002211
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-19 - 2024-MECH-0007566
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-19 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-10-16 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-15 - 2025-FIRE-0002005
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-15 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-13 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-10-09 - 2025-FIRE-0002005
08:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-08 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
09:00 AM - 11:00 AM: 411 - Rough
2026-10-08 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-08 - 2024-COMMCON-0002203
09:29 AM - 11:00 AM: 112 - Frame
2026-10-08 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-10-07 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-10-07 - 2025-FIRE-0002211
11:00 AM - 01:00 PM: 411 - Rough
2026-10-07 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-06 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-05 - 2025-FIRE-0002211
08:00 AM - 10:00 AM: 411 - Rough
2026-10-05 - 2024-COMMCON-0002203
08:30 AM - 09:30 AM: 112 - Frame
TBD: 109 - Other
2026-10-02 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-01 - 2026-FIRE-0002638
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-10-01 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-10-01 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-30 - 2026-COMMCON-0001061
09:30 AM - 11:00 AM: Document Review Inspection
09:30 AM - 11:00 AM: 108 - Final - Commercial
2026-09-30 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: 112 - Frame
2026-09-29 - 2026-COMMCON-0001055
TBD: Document Review Inspection
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-09-29 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2026-FIRE-0002638
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-29 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-29 - 2024-ELEC-0011445
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-28 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-25 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-24 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2026-FIRE-0002638
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-24 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-24 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 304 - Partial Final
2026-09-24 - 2024-ELEC-0011445
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-23 - 2025-FIRE-0002005
11:00 AM - 01:00 PM: 411 - Rough
2026-09-23 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-23 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-23 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-23 - 2024-PLUMB-0012380
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-09-22 - 2025-FIRE-0003659
02:00 PM - 04:00 PM: 302 - Partial Rough
2026-09-22 - 2024-ELEC-0010905
02:00 PM - 04:00 PM: 304 - Partial Final
2026-09-21 - 2024-BOILERAC-0000925
10:00 AM - 12:00 PM: 703 - Rough
2026-09-17 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-17 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-17 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2025-FIRE-0003659
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2026-FIRE-0002097
12:00 PM - 02:30 PM: 302 - Partial Rough
2026-09-16 - 2024-ELEC-0010905
12:00 PM - 02:30 PM: 302 - Partial Rough
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-09-14 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-03 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 303 - Full Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-02 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-02 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-02 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-09-02 - 2026-MECH-0002839
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-09-01 - 2024-COMMCON-0002203
09:00 AM - 11:00 AM: 112 - Frame
2026-09-01 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-01 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-01 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-08-31 - 2024-BOILERAC-0000842
12:00 PM - 02:00 PM: 703 - Rough
2026-08-31 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-31 - 2026-FIRE-0002097
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-31 - 2024-COMMCON-0002203
12:00 PM - 02:00 PM: 112 - Frame
2026-08-31 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-28 - 2025-ELEC-0006256
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-28 - 2026-ELEC-0000207
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-28 - 2026-ELEC-0005440
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-27 - 2026-ELEC-0000207
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-08-27 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-26 - 2025-FIRE-0002005
08:00 AM - 10:30 AM: 411 - Rough
2026-08-26 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-26 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-26 - 2025-COMMCON-0002567
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-08-26 - 2026-COMMCON-0000642
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-08-26 - 2026-ELEC-0000207
12:00 PM - 02:00 PM: 305 - Final - Electrical
2026-08-21 - 2025-COMMCON-0002638
09:30 AM - 11:00 AM: Document Review Inspection
09:30 AM - 11:00 AM: 108 - Final - Commercial
2026-08-21 - 2026-MECH-0002839
10:00 AM - 12:00 PM: 903 - Rough
2026-08-19 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-18 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-15 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-14 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-14 - 2024-PLUMB-0012380
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-08-14 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-11 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 304 - Partial Final
2026-08-10 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-08-07 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2026-FIRE-0002097
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-07 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-08-06 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-08-06 - 2025-COMMCON-0001532
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0001810
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0001843
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2025-COMMCON-0002570
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-06 - 2026-COMMCON-0000981
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-08-05 - 2024-COMMCON-0002203
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001532
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001810
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0001843
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-COMMCON-0002570
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2026-COMMCON-0000981
09:30 AM - 11:00 AM: Document Review Inspection
2026-08-05 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-05 - 2026-FIRE-0002097
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-05 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-04 - 2025-COMMCON-0001532
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0001810
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0001843
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-COMMCON-0002570
10:00 AM - 12:00 PM: Document Review Inspection
2026-08-04 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-04 - 2026-FIRE-0002097
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-04 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-03 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-03 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-08-03 - 2024-PLUMB-0012380
11:00 AM - 01:00 PM: 402 - Final - Plumbing
2026-07-31 - 2025-FIRE-0003659
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-31 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 112 - Frame
2026-07-31 - 2024-ELEC-0010905
11:00 AM - 01:00 PM: 304 - Partial Final
2026-07-31 - 2024-PLUMB-0012380
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-07-30 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-30 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-30 - 2024-MECH-0008123
10:00 AM - 12:00 PM: 903 - Rough
2026-07-29 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-29 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-29 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-29 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-29 - 2024-PLUMB-0012380
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-28 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-28 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-28 - 2024-PLUMB-0012380
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-27 - 2025-FIRE-0003659
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-27 - 2026-FIRE-0002097
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-27 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
2026-07-27 - 2024-ELEC-0010905
12:00 PM - 01:00 PM: 302 - Partial Rough
2026-07-24 - 2025-FIRE-0003659
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-24 - 2024-ELEC-0010905
08:00 AM - 10:00 AM: 304 - Partial Final
2026-07-23 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-23 - 2024-COMMCON-0001716
09:00 AM - 11:00 AM: 112 - Frame
2026-07-23 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-22 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-22 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-21 - 2025-FIRE-0002005
09:00 AM - 11:00 AM: 411 - Rough
2026-07-21 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-21 - 2025-ELEC-0013395
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-20 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-20 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-20 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 112 - Frame
2026-07-20 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-17 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-17 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-07-17 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-16 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-16 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
2026-07-16 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-15 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-15 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-14 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-14 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-07-14 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-07-13 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-13 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-13 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-10 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-10 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-10 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-09 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-09 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-09 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 304 - Partial Final
2026-07-08 - 2026-FIRE-0002638
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-08 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-08 - 2025-ELEC-0006256
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-08 - 2025-ELEC-0012467
09:00 AM - 11:00 AM: 307 - Service Equipment
2026-07-07 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-07 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-07 - 2024-MECH-0008123
08:30 AM - 11:00 AM: 903 - Rough
2026-07-06 - 2025-FIRE-0003659
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-06 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-07-06 - 2024-ELEC-0010905
09:00 AM - 11:00 AM: 304 - Partial Final
2026-07-06 - 2024-MECH-0008123
12:00 PM - 02:00 PM: 903 - Rough
2026-07-02 - 2025-FIRE-0003659
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-02 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 107 - Drywall
2026-07-02 - 2024-ELEC-0010905
08:30 AM - 09:30 AM: 304 - Partial Final
2026-07-01 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-01 - 2024-COMMCON-0001716
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-01 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-07-01 - 2024-MECH-0008123
09:00 AM - 11:00 AM: 903 - Rough
2026-07-01 - 2025-ELEC-0006256
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-30 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-30 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-30 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 304 - Partial Final
2026-06-29 - 2025-FIRE-0003659
TBD: 302 - Partial Rough
2026-06-29 - 2026-FIRE-0002097
TBD: 302 - Partial Rough
2026-06-29 - 2024-ELEC-0010905
TBD: 302 - Partial Rough
2026-06-29 - 2025-ELEC-0013395
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-29 - 2025-ELEC-0012467
TBD: 307 - Service Equipment
2026-06-26 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-26 - 2024-MECH-0008123
12:00 PM - 02:00 PM: 903 - Rough
2026-06-26 - 2025-ELEC-0006256
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-06-26 - 2025-ELEC-0012467
12:00 PM - 02:30 PM: 307 - Service Equipment
2026-06-25 - 2025-ELEC-0012467
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-06-24 - 2024-COMMCON-0001716
08:30 AM - 09:30 AM: 112 - Frame
08:30 AM - 09:30 AM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-06-24 - 2025-ELEC-0012467
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-06-23 - 2025-FIRE-0003659
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2026-FIRE-0002097
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-COMMCON-0001716
09:30 AM - 11:00 AM: 106 - Batt Insulation
09:30 AM - 11:00 AM: 107 - Drywall
09:30 AM - 11:00 AM: 112 - Frame
2026-06-23 - 2024-ELEC-0010905
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-22 - 2025-FIRE-0002211
08:00 AM - 11:00 AM: 411 - Rough
2026-06-22 - 2025-FIRE-0003659
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0002097
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2024-COMMCON-0001716
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-06-22 - 2024-ELEC-0010905
10:00 AM - 12:00 PM: 302 - Partial Rough
4567 E 9th AVE
Recent Inspections
2026-10-27 - 2022-COMMCON-0002433
11:00 AM - 01:00 PM: 112 - Frame
2026-10-23 - 2026-ELEC-0007672
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-10-13 - 2026-FIRE-0004254
11:00 AM - 01:00 PM: 411 - Rough
2026-10-06 - 2026-ELEC-0004831
10:00 AM - 12:00 PM: 308 - Ceiling
2026-10-01 - 2026-ELEC-0003945
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-09-30 - 2026-ELEC-0003945
11:00 AM - 01:00 PM: 305 - Final - Electrical
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-09-29 - 2026-ELEC-0003945
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-28 - 2026-ELEC-0004831
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-26 - 2026-ELEC-0004831
08:30 AM - 09:30 AM: 309 - Walls
2026-09-25 - 2026-ELEC-0004831
08:30 AM - 09:30 AM: 309 - Walls
2026-09-24 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-09-24 - 2026-ELEC-0007672
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-23 - 2026-ELEC-0007672
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-22 - 2025-BOILERAC-0000616
TBD: Document Review
08:30 AM - 05:30 PM: 704 - Final - Boiler AC
2026-09-22 - 2025-MECH-0005110
TBD: Document Review
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-09-21 - 2025-BOILERAC-0000616
08:00 AM - 11:00 AM: Document Review
2026-09-21 - 2025-MECH-0005110
08:00 AM - 11:00 AM: Document Review
2026-09-21 - 2026-MECH-0001099
08:00 AM - 11:00 AM: Document Review
2026-09-21 - 2025-FIRE-0006947
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-09-18 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-09-17 - 2025-BOILERAC-0000616
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2026-09-17 - 2025-MECH-0005110
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-17 - 2026-MECH-0001099
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-16 - 2026-BOILERAC-0000466
10:00 AM - 12:00 PM: Document Review
10:00 AM - 12:00 PM: 704 - Final - Boiler AC
2026-09-16 - 2025-COMMCON-0001659
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-09-16 - 2026-ELEC-0005778
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-10 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-09-09 - 2026-FIRE-0001093
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-09 - 2026-FIRE-0001471
12:00 PM - 03:00 PM: 412 - Final - Fire Suppression
2026-09-09 - 2025-ELEC-0010517
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-04 - 2025-ELEC-0010517
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-02 - 2025-COMMCON-0001659
08:30 AM - 09:30 AM: 109 - Other
2026-09-02 - 2025-ELEC-0010517
11:00 AM - 01:00 PM: 308 - Ceiling
2026-08-28 - 2025-ELEC-0010517
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-27 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 112 - Frame
2026-08-10 - 2025-COMMCON-0002754
11:00 AM - 01:00 PM: 108 - Final - Commercial
11:00 AM - 01:00 PM: 109 - Other
2026-08-05 - 2026-FIRE-0002816
11:30 AM - 01:30 PM: 303 - Full Rough
2026-08-04 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 109 - Other
2026-08-03 - 2026-ACCCON-0000128
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-08-03 - 2025-COMMCON-0002754
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-07-31 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 109 - Other
2026-07-31 - 2025-ELEC-0010517
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 308 - Ceiling
2026-07-29 - 2025-MECH-0005110
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-07-23 - 2025-ELEC-0010517
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-07-21 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 109 - Other
2026-07-16 - 2025-COMMCON-0001659
01:00 PM - 03:00 PM: 112 - Frame
2026-07-16 - 2025-ELEC-0010517
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-14 - 2025-ELEC-0010517
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-07-10 - 2026-MECH-0001099
11:00 AM - 02:00 PM: 903 - Rough
2026-07-07 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-06 - 2025-COMMCON-0001659
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-01 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 112 - Frame
2026-07-01 - 2026-MECH-0001099
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-06-30 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 112 - Frame
2026-06-29 - 2025-ELEC-0010517
12:00 PM - 02:30 PM: 309 - Walls
2026-06-23 - 2025-COMMCON-0001659
11:00 AM - 01:00 PM: 108 - Final - Commercial
4250 N Raleigh St
Recent Inspections
2026-10-27 - 2026-PLUMB-0008704
10:30 AM - 12:30 PM: 401 - Rough
2026-10-14 - 2026-RESCON-0000580
09:00 AM - 11:00 AM: 105 - Exterior Sheathing
2026-07-16 - 2026-ELEC-0006282
08:30 AM - 10:30 AM: 305 - Final - Electrical
08:30 AM - 10:30 AM: 307 - Service Equipment
08:30 AM - 10:30 AM: 311 - Temporary Service
08:30 AM - 10:30 AM: 313 - Meter Release
7401 E Martin Luther King Jr BLVD
Recent Inspections
2026-10-26 - 2026-FIRE-0003881
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-23 - 2026-COMMCON-0000912
09:30 AM - 11:30 AM: 108 - Final - Commercial
2026-10-22 - 2026-ELEC-0005264
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-02 - 2026-COMMCON-0000912
09:30 AM - 11:30 AM: 108 - Final - Commercial
2026-10-01 - 2026-FIRE-0004175
08:30 AM - 10:30 AM: 412 - Final - Fire Suppression
2026-09-30 - 2026-MECH-0002899
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-29 - 2026-MECH-0002899
11:00 AM - 01:00 PM: Document Review
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-29 - 2026-BOILERAC-0000371
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-09-29 - 2026-ELEC-0008938
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-25 - 2026-ELEC-0005264
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-09-22 - 2026-FIRE-0004175
08:30 AM - 10:30 AM: 411 - Rough
2026-09-22 - 2026-ELEC-0005264
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-17 - 2026-MECH-0002899
11:00 AM - 01:00 PM: 903 - Rough
2026-09-15 - 2026-MECH-0002899
11:00 AM - 01:00 PM: 903 - Rough
2026-09-04 - 2026-COMMCON-0000912
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-21 - 2026-COMMCON-0000912
08:30 AM - 09:30 AM: 109 - Other
2026-08-21 - 2026-ELEC-0005264
08:00 AM - 10:00 AM: 303 - Full Rough
2026-08-18 - 2026-COMMCON-0001182
09:30 AM - 11:30 AM: 108 - Final - Commercial
TBD: 109 - Other
2026-08-18 - 2026-MECH-0002899
11:00 AM - 01:00 PM: 903 - Rough
2026-08-14 - 2026-MECH-0002899
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-08-13 - 2026-ELEC-0005264
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-07-29 - 2025-FIRE-0003209
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-24 - 2026-COMMCON-0000338
11:30 AM - 01:30 PM: Document Review Inspection
11:30 AM - 01:30 PM: 108 - Final - Commercial
11:30 AM - 01:30 PM: 120 - Temporary Certificate of Occupancy
2026-07-21 - 2026-BOILERAC-0000159
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-07-21 - 2026-COMMCON-0001182
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-07-21 - 2026-ELEC-0001769
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-07-17 - 2026-COMMCON-0001182
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-07-13 - 2026-ELEC-0001769
12:00 PM - 02:30 PM: 301 - Underground
2026-07-08 - 2026-ROOFSIDE-0002593
12:00 PM - 02:00 PM: 201 - Final - Roof
2026-07-07 - 2026-ROOFSIDE-0002593
09:30 AM - 11:30 AM: 201 - Final - Roof
2026-07-06 - 2026-ELEC-0005763
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-07-06 - 2026-FIRE-0003392
08:30 AM - 10:30 AM: 303 - Full Rough
2026-07-01 - 2026-COMMCON-0000338
10:00 AM - 12:00 PM: Document Review Inspection
2026-06-24 - 2026-COMMCON-0000338
09:30 AM - 11:30 AM: 103 - Waterproofing
2026-06-23 - 2026-COMMCON-0000338
09:30 AM - 11:30 AM: Document Review Inspection
725 S Jason ST
Recent Inspections
2026-10-27 - 2026-COMMCON-0000230
12:00 PM - 02:00 PM: 109 - Other
2026-10-27 - 2026-MECH-0007042
12:00 PM - 02:00 PM: 904 - Final - Mechanical
2026-10-26 - 2026-COMMCON-0000230
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-10-26 - 2026-COMMCON-0001822
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-10-23 - 2026-FIRE-0005606
08:00 AM - 10:30 AM: 412 - Final - Fire Suppression
2026-10-23 - 2026-ELEC-0009334
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-ELEC-0010056
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-MECH-0006506
10:00 AM - 12:00 PM: 904 - Final - Mechanical
2026-10-23 - 2026-PLUMB-0003431
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-23 - 2026-ELEC-0008506
TBD: 305 - Final - Electrical
2026-10-16 - 2026-COMMCON-0001822
TBD: 107 - Drywall
2026-10-15 - 2026-FIRE-0005606
08:00 AM - 10:00 AM: 411 - Rough
2026-10-15 - 2026-COMMCON-0001822
09:00 AM - 11:00 PM: 112 - Frame
2026-10-14 - 2026-FIRE-0005392
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-14 - 2026-FIRE-0005606
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-10-14 - 2026-ELEC-0009334
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-14 - 2026-MECH-0006506
10:00 AM - 12:00 PM: 903 - Rough
2026-10-07 - 2026-PLUMB-0003431
10:00 AM - 12:00 PM: 401 - Rough
2026-10-06 - 2026-PLUMB-0003431
08:00 AM - 10:00 AM: 401 - Rough
2026-09-14 - 2026-ELEC-0008506
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-11 - 2026-ELEC-0008506
12:00 PM - 02:00 PM: 303 - Full Rough
2026-08-21 - 2026-PLUMB-0003431
08:00 AM - 10:00 AM: 400 - Groundwork
2026-08-19 - 2026-PLUMB-0003431
08:00 AM - 10:00 AM: 400 - Groundwork
2026-08-18 - 2026-PLUMB-0003431
10:00 AM - 12:00 PM: 400 - Groundwork
2026-08-13 - 2026-COMMCON-0000230
08:30 AM - 09:30 AM: 112 - Frame
2026-08-10 - 2026-COMMCON-0000230
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
3250 E 2nd AVE
Recent Inspections
2026-10-27 - 2026-BOILERAC-0000499
12:00 PM - 02:00 PM: 703 - Rough
2026-10-27 - 2026-COMMCON-0000899
01:00 PM - 03:00 PM: 107 - Drywall
2026-10-26 - 2026-FIRE-0004253
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-26 - 2026-FIRE-0004662
09:00 AM - 11:00 AM: 411 - Rough
2026-10-26 - 2026-COMMCON-0000899
01:00 PM - 03:00 PM: 112 - Frame
2026-10-23 - 2025-ELEC-0014022
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-10-23 - 2026-MECH-0004355
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-10-22 - 2026-BOILERAC-0000424
10:00 AM - 12:00 PM: 703 - Rough
2026-10-22 - 2026-DEMO-0000287
01:00 PM - 03:00 PM: Demolition Final Inspection
2026-10-22 - 2026-FIRE-0002315
08:00 AM - 10:00 AM: 411 - Rough
2026-10-22 - 2026-ELEC-0005366
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-22 - 2026-MECH-0003437
10:00 AM - 12:00 PM: 903 - Rough
2026-10-22 - 2026-PLUMB-0004854
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-20 - 2026-COMMCON-0000899
01:00 PM - 03:00 PM: 107 - Drywall
2026-10-16 - 2026-FIRE-0001077
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-10-14 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 109 - Other
2026-10-13 - 2026-FIRE-0001378
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-13 - 2026-FIRE-0001490
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-13 - 2025-ELEC-0014022
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-10-13 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 109 - Other
2026-10-13 - 2025-COMMCON-0002690
01:00 PM - 03:00 PM: 112 - Frame
2026-10-09 - 2026-FIRE-0001378
09:00 AM - 11:00 AM: 303 - Full Rough
2026-10-09 - 2026-FIRE-0001490
09:00 AM - 11:00 AM: 303 - Full Rough
2026-10-08 - 2026-ELEC-0005366
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 308 - Ceiling
2026-10-08 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 109 - Other
2026-10-08 - 2026-MECH-0004355
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-10-07 - 2026-FIRE-0004544
10:00 AM - 12:00 PM: 303 - Full Rough
2026-10-07 - 2026-ELEC-0005366
10:00 AM - 12:00 PM: 303 - Full Rough
10:00 AM - 12:00 PM: 308 - Ceiling
2026-10-07 - 2026-MECH-0004355
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-10-05 - 2025-ELEC-0014021
08:00 AM - 10:00 AM: 308 - Ceiling
2026-10-02 - 2026-FIRE-0004152
10:00 AM - 12:00 PM: 411 - Rough
2026-10-02 - 2026-COMMCON-0000899
10:00 AM - 12:00 PM: 107 - Drywall
2026-09-30 - 2026-COMMCON-0000899
01:00 PM - 03:00 PM: 109 - Other
2026-09-28 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-24 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-23 - 2026-FIRE-0004544
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-22 - 2026-FIRE-0001490
09:00 AM - 11:00 AM: 303 - Full Rough
2026-09-22 - 2025-COMMCON-0002758
12:00 PM - 02:30 PM: 109 - Other
12:00 PM - 02:30 PM: 112 - Frame
2026-09-22 - 2025-ELEC-0014022
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-18 - 2026-FIRE-0004544
08:00 AM - 10:30 AM: 302 - Partial Rough
2026-09-18 - 2025-COMMCON-0002758
12:00 PM - 02:00 PM: 112 - Frame
2026-09-18 - 2026-ELEC-0005366
08:00 AM - 10:30 AM: 308 - Ceiling
2026-09-18 - 2026-COMMCON-0000969
08:30 AM - 09:30 AM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-15 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-15 - 2026-ELEC-0008426
08:30 AM - 09:30 AM: 307 - Service Equipment
TBD: 305 - Final - Electrical
2026-09-14 - 2026-FIRE-0001378
09:00 AM - 11:00 AM: 303 - Full Rough
2026-09-14 - 2026-FIRE-0001490
09:00 AM - 11:00 AM: 303 - Full Rough
2026-09-14 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 112 - Frame
2026-09-14 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-09-14 - 2025-ELEC-0014021
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-14 - 2025-ELEC-0014022
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-10 - 2026-FIRE-0004253
08:00 AM - 10:00 AM: 411 - Rough
2026-09-10 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-09-08 - 2026-MECH-0000160
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-09-08 - 2026-MECH-0000709
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-09-04 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-09-03 - 2026-MECH-0000709
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-09-01 - 2026-FIRE-0004253
11:00 AM - 01:00 PM: 411 - Rough
2026-09-01 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 112 - Frame
2026-09-01 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-08-31 - 2026-FIRE-0001050
09:00 AM - 11:00 AM: 411 - Rough
2026-08-31 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 109 - Other
2026-08-28 - 2026-COMMCON-0000899
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-28 - 2026-MECH-0000709
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-08-27 - 2023-COMMCON-0002542
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-27 - 2026-FIRE-0001378
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2026-FIRE-0003115
09:00 AM - 11:00 AM: 411 - Rough
2026-08-27 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 109 - Other
2026-08-27 - 2025-ELEC-0014021
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2026-MECH-0000709
10:00 AM - 12:00 PM: 902 - Partial Rough
2026-08-26 - 2026-FIRE-0002315
08:00 AM - 10:00 AM: 411 - Rough
2026-08-20 - 2026-COMMCON-0001557
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-19 - 2026-COMMCON-0001557
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-19 - 2026-PLUMB-0006756
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-08-15 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 112 - Frame
2026-08-15 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2025-COMMCON-0002074
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-08-14 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-13 - 2026-BOILERAC-0000424
08:30 AM - 05:30 PM: 701 - Pressure Test
2026-08-13 - 2026-FIRE-0001077
08:30 AM - 05:30 PM: 411 - Rough
2026-08-13 - 2025-COMMCON-0002074
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-08-13 - 2026-MECH-0003437
08:30 AM - 09:30 AM: 902 - Partial Rough
2026-08-12 - 2026-FIRE-0001077
10:00 AM - 12:00 PM: 411 - Rough
2026-08-12 - 2025-COMMCON-0002074
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-08-11 - 2026-FIRE-0001077
08:00 AM - 10:00 AM: 411 - Rough
2026-08-11 - 2026-ELEC-0005366
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2026-DEMO-0000283
01:00 PM - 03:00 PM: 113 - PreConstruction Meeting
01:00 PM - 03:00 PM: Demolition Final Inspection
2026-08-06 - 2026-FIRE-0001077
10:00 AM - 12:00 PM: 411 - Rough
2026-08-06 - 2026-FIRE-0001490
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-06 - 2025-ELEC-0014022
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-05 - 2025-ELEC-0014022
10:30 AM - 12:30 PM: 302 - Partial Rough
2026-08-05 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-05 - 2026-MECH-0000160
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-08-04 - 2025-COMMCON-0002074
01:00 PM - 03:00 PM: 109 - Other
2026-07-30 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-29 - 2026-FIRE-0001490
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-07-29 - 2025-COMMCON-0002074
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-07-28 - 2025-PLUMB-0008521
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-07-28 - 2026-ELEC-0005366
09:00 AM - 10:00 AM: 309 - Walls
2026-07-28 - 2026-PLUMB-0005965
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-07-22 - 2026-PLUMB-0004854
10:00 AM - 12:00 PM: 401 - Rough
2026-07-21 - 2026-PLUMB-0004854
11:00 AM - 01:00 PM: 401 - Rough
2026-07-20 - 2025-COMMCON-0002757
01:00 PM - 03:00 PM: 112 - Frame
2026-07-20 - 2025-COMMCON-0002758
01:00 PM - 03:00 PM: 112 - Frame
2026-07-17 - 2025-ELEC-0014021
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-15 - 2026-COMMCON-0000969
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-15 - 2025-COMMCON-0002074
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-07-15 - 2026-COMMCON-0000127
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-07-14 - 2025-COMMCON-0002074
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-07-14 - 2025-ELEC-0014022
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-14 - 2026-COMMCON-0000127
09:00 AM - 11:00 AM: 120 - Temporary Certificate of Occupancy
2026-07-13 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-10 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-10 - 2026-ACCCON-0000168
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-10 - 2025-PLUMB-0008521
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-07-09 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-09 - 2026-ACCCON-0000168
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-09 - 2025-ELEC-0014021
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-08 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-08 - 2026-ACCCON-0000168
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-07 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-07 - 2026-ACCCON-0000168
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-07 - 2026-COMMCON-0000582
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-07-06 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-06 - 2026-ACCCON-0000168
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-07-02 - 2025-COMMCON-0002074
01:00 PM - 03:00 PM: 109 - Other
2026-07-01 - 2025-ELEC-0010519
TBD: 305 - Final - Electrical
2026-06-30 - 2025-FIRE-0007327
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-06-30 - 2026-FIRE-0000215
11:00 AM - 01:00 PM: 412 - Final - Fire Suppression
2026-06-26 - 2025-PLUMB-0008521
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-06-25 - 2026-ACCCON-0000069
12:00 PM - 02:00 PM: 305 - Final - Access Control
2026-06-24 - 2026-ACCCON-0000069
01:00 PM - 03:00 PM: 305 - Final - Access Control
2026-06-24 - 2026-FIRE-0000795
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-06-24 - 2026-COMMCON-0000127
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-06-24 - 2026-COMMCON-0000546
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-06-24 - 2026-COMMCON-0000871
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-06-22 - 2026-FIRE-0000795
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-06-22 - 2026-ELEC-0000688
10:00 AM - 12:00 PM: 305 - Final - Electrical
7835 E Belleview AVE
Recent Inspections
2026-10-26 - 2026-COMMCON-0001783
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-10-16 - 2026-COMMCON-0001783
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-10-14 - 2024-BOILERAC-0000933
01:00 PM - 03:00 PM: 704 - Final - Boiler AC
2026-10-08 - 2024-MECH-0008188
01:00 PM - 03:00 PM: 904 - Final - Mechanical
01:00 PM - 03:00 PM: Document Review
2026-10-08 - 2025-ELEC-0007327
02:00 PM - 04:00 PM: 305 - Final - Electrical
2026-10-06 - 2025-ELEC-0007327
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-10-02 - 2024-PLUMB-0012468
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-09-21 - 2026-COMMCON-0001783
12:00 PM - 02:00 PM: 109 - Other
2026-09-18 - 2026-COMMCON-0001783
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-09-16 - 2026-COMMCON-0001783
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-09-15 - 2024-BOILERAC-0000933
01:00 PM - 03:00 PM: 703 - Rough
2026-09-15 - 2024-MECH-0008188
01:00 PM - 03:00 PM: 903 - Rough
2026-09-11 - 2026-FIRE-0000624
01:00 PM - 03:00 PM: 303 - Full Rough
2026-09-11 - 2025-ELEC-0007327
01:00 PM - 03:00 PM: 308 - Ceiling
2026-09-03 - 2026-FIRE-0000624
12:00 PM - 02:00 PM: 303 - Full Rough
2026-09-02 - 2026-FIRE-0000624
08:30 AM - 05:30 PM: 303 - Full Rough
2026-08-03 - 2025-ELEC-0007327
01:00 PM - 03:00 PM: 301 - Underground
2026-07-30 - 2025-ROOFSIDE-0010371
12:00 PM - 02:00 PM: 201 - Final - Roof
2026-07-16 - 2024-BOILERAC-0000933
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-07-02 - 2026-ELEC-0000013
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-01 - 2025-ELEC-0007327
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-01 - 2026-ELEC-0000013
01:00 PM - 03:00 PM: 307 - Service Equipment
4661 S Wolff ST
Recent Inspections
2026-10-27 - 2026-ELEC-0009291
01:00 PM - 03:00 PM: 305 - Final - Electrical
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-10-23 - 2026-ELEC-0009291
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-10-23 - 2026-MECH-0006439
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-08-17 - 2026-MECH-0004862
01:00 PM - 03:00 PM: 904 - Final - Mechanical
3040 E 43rd AVE
Recent Inspections
2026-10-27 - 2025-MECH-0008466
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-27 - 2026-MECH-0001803
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-26 - 2026-MECH-0001803
01:00 PM - 03:00 PM: Document Review
TBD: 904 - Final - Mechanical
2026-10-23 - 2025-ELEC-0009046
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-23 - 2025-MECH-0008466
08:30 AM - 10:30 AM: 904 - Final - Mechanical
2026-10-23 - 2026-ELEC-0003651
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-23 - 2026-MECH-0001803
08:30 AM - 10:30 AM: 904 - Final - Mechanical
2026-10-23 - 2026-PLUMB-0002551
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-10-22 - 2025-ELEC-0009046
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-22 - 2026-ELEC-0003651
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-22 - 2026-PLUMB-0002551
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-10-21 - 2026-FIRE-0004107
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-10-20 - 2026-ELEC-0003651
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-10-16 - 2026-FIRE-0004108
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-16 - 2026-ELEC-0003651
11:00 AM - 01:00 PM: 308 - Ceiling
2026-10-09 - 2026-ELEC-0003651
12:00 PM - 02:30 PM: 308 - Ceiling
2026-09-29 - 2026-ELEC-0003651
08:30 AM - 09:30 AM: 308 - Ceiling
2026-09-28 - 2025-PLUMB-0011280
08:00 AM - 10:00 AM: 401 - Rough
10:00 AM - 12:00 PM: 405 - Meter Release
2026-09-21 - 2025-MECH-0008466
01:00 PM - 03:00 PM: 903 - Rough
2026-09-10 - 2026-COMMCON-0000550
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-09-09 - 2025-ELEC-0009046
08:30 AM - 10:30 AM: 307 - Service Equipment
08:30 AM - 10:30 AM: 313 - Meter Release
2026-09-09 - 2026-LOG-0004268
08:30 AM - 10:30 AM: 307 - Service Equipment
2026-09-08 - 2025-ELEC-0009046
12:00 PM - 02:30 PM: 307 - Service Equipment
12:00 PM - 02:30 PM: 313 - Meter Release
2026-09-04 - 2025-PLUMB-0011280
08:00 AM - 10:00 AM: 401 - Rough
2026-08-18 - 2026-ROOFSIDE-0003005
11:00 AM - 01:00 PM: 201 - Final - Roof
2026-08-18 - 2025-COMMCON-0001513
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-14 - 2025-MECH-0008466
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-08-13 - 2025-ELEC-0009046
08:30 AM - 09:30 AM: 308 - Ceiling
2026-07-20 - 2025-COMMCON-0001513
01:00 PM - 03:00 PM: 112 - Frame
2026-07-20 - 2025-PLUMB-0011280
08:00 AM - 10:00 AM: 401 - Rough
2026-07-10 - 2025-ELEC-0009046
08:30 AM - 09:30 AM: 309 - Walls
2026-07-07 - 2026-ROOFSIDE-0003005
12:30 PM - 02:30 PM: 201 - Final - Roof
2026-06-27 - 2026-ROOFSIDE-0003005
11:00 AM - 01:00 PM: 206 - Other
2026-06-26 - 2026-ROOFSIDE-0003005
11:00 AM - 01:00 PM: 206 - Other
2026-06-23 - 2026-ROOFSIDE-0003005
09:00 AM - 11:00 AM: 205 - Pre Inspection Commercial Flat Roof
1900 Lawrence ST
Recent Inspections
2026-10-27 - 2026-FIRE-0005059
10:00 AM - 12:00 PM: 411 - Rough
2026-10-26 - 2026-BOILERAC-0000572
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-10-26 - 2026-COMMCON-0001085
11:00 AM - 01:00 PM: 121 - Certificate of Occupancy
2026-10-26 - 2026-MECH-0005179
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-10-23 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-10-23 - 2026-FIRE-0004719
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-10-23 - 2026-MECH-0003393
10:30 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-23 - 2026-MECH-0003394
10:30 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-23 - 2026-MECH-0006584
10:30 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-23 - 2026-PLUMB-0004766
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-10-22 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-10-21 - 2026-COMMCON-0001154
11:00 AM - 01:00 PM: 112 - Frame
2026-10-20 - 2026-MECH-0003834
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-10-19 - 2026-COMMCON-0001523
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-19 - 2026-ELEC-0005602
08:00 AM - 10:00 AM: 308 - Ceiling
2026-10-19 - 2026-MECH-0001799
09:00 AM - 10:30 AM: 904 - Final - Mechanical
2026-10-16 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 109 - Other
2026-10-15 - 2026-FIRE-0004460
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-15 - 2026-COMMCON-0000373
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-10-15 - 2026-ELEC-0006080
08:00 AM - 10:00 AM: 308 - Ceiling
2026-10-13 - 2026-FIRE-0001942
TBD: 303 - Full Rough
2026-10-13 - 2026-FIRE-0004458
08:00 AM - 11:00 AM: 411 - Rough
2026-10-13 - 2026-FIRE-0004956
TBD: 303 - Full Rough
2026-10-09 - 2026-FIRE-0001942
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-09 - 2026-FIRE-0003333
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-09 - 2026-FIRE-0004956
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-07 - 2026-ACCCON-0000189
09:00 AM - 11:00 AM: 305 - Final - Access Control
2026-10-06 - 2026-FIRE-0001358
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-10-06 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-06 - 2026-COMMCON-0001523
01:00 PM - 03:00 PM: 112 - Frame
2026-10-06 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-06 - 2026-MECH-0005179
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-10-05 - 2026-MECH-0001799
08:30 AM - 11:00 AM: Document Review
2026-10-05 - 2026-ELEC-0007231
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-10-05 - 2026-PLUMB-0006699
11:00 AM - 02:00 PM: 401 - Rough
2026-10-02 - 2025-ELEC-0014014
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-02 - 2026-ELEC-0005007
10:00 AM - 12:00 PM: 304 - Partial Final
2026-10-02 - 2026-MECH-0001800
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-10-01 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-01 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-01 - 2026-ELEC-0007824
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-01 - 2026-ELEC-0008950
08:00 AM - 10:00 AM: 304 - Partial Final
2026-10-01 - 2026-MECH-0004085
09:00 AM - 11:00 AM: 903 - Rough
2026-09-29 - 2026-COMMCON-0001154
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-29 - 2026-ELEC-0007824
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-09-29 - 2026-ELEC-0008950
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-09-28 - 2026-COMMCON-0000373
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-25 - 2026-BOILERAC-0000232
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2026-09-25 - 2026-FIRE-0002456
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-09-25 - 2026-ELEC-0007824
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-09-25 - 2026-ELEC-0008950
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-09-24 - 2026-COMMCON-0001298
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-24 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-23 - 2026-COMMCON-0001154
09:00 AM - 11:00 AM: 112 - Frame
2026-09-22 - 2026-COMMCON-0001154
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-09-22 - 2026-COMMCON-0001298
11:00 AM - 01:00 PM: 112 - Frame
2026-09-22 - 2026-ELEC-0005602
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-21 - 2026-FIRE-0004458
08:30 AM - 05:30 PM: 411 - Rough
2026-09-21 - 2026-ELEC-0006080
09:00 AM - 11:00 AM: 308 - Ceiling
2026-09-21 - 2026-MECH-0001800
TBD: 901 - Pressure Test
2026-09-21 - 2026-MECH-0003394
TBD: 903 - Rough
2026-09-18 - 2026-BOILERAC-0000451
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-09-18 - 2026-ELEC-0005602
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-18 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 903 - Rough
2026-09-17 - 2026-BOILERAC-0000479
11:00 AM - 01:00 PM: 701 - Pressure Test
2026-09-17 - 2026-FIRE-0004460
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-17 - 2026-ELEC-0006080
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-17 - 2026-MECH-0001800
11:00 AM - 01:00 PM: 904 - Final - Mechanical
2026-09-17 - 2026-MECH-0004085
11:00 AM - 01:00 PM: 902 - Partial Rough
2026-09-17 - 2026-PLUMB-0002535
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-09-16 - 2026-ELEC-0001795
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-15 - 2026-COMMCON-0001523
11:00 AM - 01:00 PM: 112 - Frame
2026-09-15 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 903 - Rough
2026-09-15 - 2026-PLUMB-0006699
10:00 AM - 12:00 PM: 401 - Rough
2026-09-14 - 2026-ELEC-0001795
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-14 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 903 - Rough
2026-09-11 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-10 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 109 - Other
2026-09-10 - 2026-ELEC-0007824
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-09-10 - 2025-ELEC-0014014
11:00 AM - 01:00 PM: 307 - Service Equipment
2026-09-09 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 109 - Other
2026-09-09 - 2026-ELEC-0007824
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-09-09 - 2026-MECH-0004085
08:30 AM - 11:00 AM: 902 - Partial Rough
2026-09-08 - 2025-COMMCON-0002755
09:00 AM - 11:00 AM: 109 - Other
2026-09-04 - 2026-PLUMB-0005227
10:00 AM - 12:00 PM: 401 - Rough
2026-08-26 - 2026-FIRE-0003333
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-26 - 2025-ELEC-0014014
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-26 - 2026-ELEC-0005007
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-21 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 903 - Rough
2026-08-20 - 2026-FIRE-0003333
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-20 - 2025-ELEC-0014014
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-20 - 2026-ELEC-0005007
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-14 - 2026-FIRE-0003333
08:00 AM - 10:30 AM: 302 - Partial Rough
2026-08-14 - 2025-ELEC-0014014
08:00 AM - 10:30 AM: 307 - Service Equipment
08:00 AM - 10:30 AM: 308 - Ceiling
2026-08-14 - 2026-ELEC-0005007
08:00 AM - 10:30 AM: 307 - Service Equipment
08:00 AM - 10:30 AM: 308 - Ceiling
2026-08-11 - 2026-FIRE-0003333
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-11 - 2025-ELEC-0014014
09:00 AM - 12:00 PM: 308 - Ceiling
09:00 AM - 12:00 PM: 309 - Walls
2026-08-11 - 2026-ELEC-0005007
09:00 AM - 12:00 PM: 308 - Ceiling
09:00 AM - 12:00 PM: 309 - Walls
2026-08-10 - 2026-FIRE-0003333
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-10 - 2025-ELEC-0014014
11:00 AM - 01:00 PM: 308 - Ceiling
11:00 AM - 01:00 PM: 309 - Walls
2026-08-10 - 2026-ELEC-0005007
11:00 AM - 01:00 PM: 308 - Ceiling
11:00 AM - 01:00 PM: 309 - Walls
2026-08-10 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-07 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0002755
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-05 - 2026-MECH-0001800
09:00 AM - 11:00 AM: 903 - Rough
2026-08-04 - 2026-COMMCON-0001298
09:00 AM - 11:00 AM: 112 - Frame
2026-08-04 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-03 - 2026-ELEC-0001795
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-03 - 2026-ELEC-0006080
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-03 - 2026-FIRE-0002318
09:00 AM - 11:00 AM: 303 - Full Rough
2026-07-31 - 2026-ELEC-0001795
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-31 - 2026-COMMCON-0000373
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-31 - 2026-FIRE-0002318
10:00 AM - 12:00 PM: 303 - Full Rough
2026-07-30 - 2025-COMMCON-0002755
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-30 - 2026-ELEC-0001795
08:30 AM - 09:30 AM: 308 - Ceiling
2026-07-28 - 2026-FIRE-0002318
09:00 AM - 11:00 AM: 303 - Full Rough
2026-07-28 - 2026-COMMCON-0000373
11:00 AM - 01:00 PM: 112 - Frame
2026-07-28 - 2026-ELEC-0001795
09:00 AM - 11:00 AM: 308 - Ceiling
2026-07-28 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-24 - 2026-FIRE-0003333
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-24 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-23 - 2026-MECH-0001799
11:00 AM - 01:00 PM: 901 - Pressure Test
2026-07-22 - 2026-FIRE-0003333
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-22 - 2025-ELEC-0014014
08:30 AM - 10:30 AM: 308 - Ceiling
2026-07-22 - 2026-ELEC-0005007
08:30 AM - 10:30 AM: 308 - Ceiling
2026-07-16 - 2026-BOILERAC-0000174
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-07-16 - 2026-MECH-0001349
09:00 AM - 11:00 AM: 903 - Rough
2026-07-15 - 2026-FIRE-0003333
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-15 - 2025-ELEC-0014014
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-15 - 2026-ELEC-0005007
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-14 - 2026-FIRE-0002456
12:00 PM - 02:00 PM: 411 - Rough
2026-07-14 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-14 - 2026-PLUMB-0002535
12:00 PM - 02:00 PM: 401 - Rough
2026-07-13 - 2026-FIRE-0001358
11:00 AM - 02:00 PM: 411 - Rough
2026-07-13 - 2025-COMMCON-0002755
09:00 AM - 11:00 AM: 112 - Frame
2026-07-13 - 2026-PLUMB-0002535
11:00 AM - 02:00 PM: 401 - Rough
2026-07-09 - 2026-FIRE-0003333
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-09 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-09 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-07 - 2026-MECH-0001799
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-02 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-02 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-30 - 2025-COMMCON-0002755
12:00 PM - 02:00 PM: 112 - Frame
2026-06-29 - 2025-COMMCON-0002755
12:00 PM - 02:00 PM: 112 - Frame
2026-06-26 - 2026-FIRE-0001358
10:00 AM - 12:00 PM: 411 - Rough
2026-06-26 - 2026-FIRE-0003333
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-26 - 2025-COMMCON-0002755
12:00 PM - 02:00 PM: 112 - Frame
2026-06-26 - 2025-ELEC-0014014
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-26 - 2026-ELEC-0005007
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-22 - 2025-COMMCON-0002755
09:00 AM - 11:00 AM: 112 - Frame