Property Status: Active

1001 17th ST

Directions

Recent Inspections

2026-10-26 - 2026-COMMCON-0000977

11:00 AM - 01:00 PM: 112 - Frame

2026-10-23 - 2026-COMMCON-0001268

09:00 AM - 11:00 AM: 109 - Other

2026-10-23 - 2026-ELEC-0005005

09:30 AM - 12:30 PM: 302 - Partial Rough

2026-10-23 - 2026-ELEC-0009523

09:30 AM - 12:30 PM: 302 - Partial Rough

2026-10-23 - 2026-MECH-0006217

10:30 AM - 01:00 PM: 902 - Partial Rough

2026-10-22 - 2026-FIRE-0004784

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-10-22 - 2026-ELEC-0005924

08:30 AM - 10:30 AM: 308 - Ceiling

2026-10-22 - 2026-MECH-0004124

10:30 AM - 01:00 PM: 903 - Rough

2026-10-19 - 2026-COMMCON-0000977

11:00 AM - 01:00 PM: 112 - Frame

2026-10-16 - 2026-COMMCON-0001860

09:00 AM - 11:00 AM: 113 - Pre Construction Meeting

2026-10-15 - 2026-COMMCON-0000538

09:00 AM - 11:00 AM: 108 - Final - Commercial

2026-10-14 - 2026-DEMO-0000256

10:00 AM - 01:00 PM: Electrical Final Inspection

2026-10-14 - 2026-ELEC-0005005

10:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-14 - 2026-ELEC-0009523

10:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-13 - 2026-FIRE-0004293

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-10-13 - 2026-FIRE-0004486

10:30 AM - 12:30 PM: 412 - Final - Fire Suppression

2026-10-13 - 2026-ELEC-0009523

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-10-13 - 2026-MECH-0004124

11:00 AM - 01:00 PM: 903 - Rough

2026-10-09 - 2026-COMMCON-0001849

11:00 AM - 01:00 PM: 113 - Pre Construction Meeting

2026-10-09 - 2026-FIRE-0004486

12:30 PM - 03:00 PM: 412 - Final - Fire Suppression

2026-10-08 - 2026-PLUMB-0004678

10:30 AM - 12:30 PM: 401 - Rough

2026-10-07 - 2026-MECH-0001785

11:00 AM - 01:00 PM: Document Review

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-10-07 - 2026-MECH-0002325

11:00 AM - 01:00 PM: Document Review

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-10-07 - 2026-ELEC-0002458

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-10-07 - 2026-PLUMB-0002507

08:00 AM - 10:00 AM: 402 - Final - Plumbing

2026-10-02 - 2026-DEMO-0000207

09:00 AM - 11:00 AM: Demolition Final Inspection

2026-10-02 - 2026-COMMCON-0000977

09:00 AM - 11:00 AM: 109 - Other

2026-09-30 - 2026-FIRE-0004794

08:00 AM - 10:00 AM: 411 - Rough

2026-09-29 - 2026-FIRE-0004794

08:00 AM - 10:00 AM: 411 - Rough

2026-09-28 - 2026-ELEC-0005005

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-24 - 2026-COMMCON-0000697

09:00 AM - 11:00 AM: 109 - Other

2026-09-23 - 2026-FIRE-0004293

08:00 AM - 10:00 AM: 411 - Rough

2026-09-22 - 2026-COMMCON-0000697

09:00 AM - 11:00 AM: 109 - Other

2026-09-17 - 2026-MECH-0001785

11:00 AM - 01:00 PM: 903 - Rough

2026-09-17 - 2026-MECH-0002325

11:00 AM - 01:00 PM: 903 - Rough

2026-09-17 - 2026-PLUMB-0005464

08:00 AM - 10:00 AM: 401 - Rough

2026-09-15 - 2026-FIRE-0003656

08:00 AM - 10:00 AM: 303 - Full Rough

2026-09-15 - 2026-ELEC-0003292

08:00 AM - 10:00 AM: 308 - Ceiling

2026-09-04 - 2026-COMMCON-0001268

09:00 AM - 11:00 AM: 112 - Frame

2026-09-03 - 2026-ELEC-0005924

09:00 AM - 11:00 AM: 302 - Partial Rough

TBD: 309 - Walls

2026-09-03 - 2026-PLUMB-0005464

08:00 AM - 10:00 AM: 401 - Rough

2026-08-26 - 2026-COMMCON-0000538

09:00 AM - 11:00 AM: 107 - Drywall

2026-08-26 - 2026-COMMCON-0000697

09:00 AM - 11:00 AM: 107 - Drywall

2026-08-20 - 2026-COMMCON-0000538

10:00 AM - 12:00 PM: 112 - Frame

2026-08-20 - 2026-COMMCON-0000697

10:00 AM - 12:00 PM: 112 - Frame

2026-08-19 - 2026-FIRE-0004293

10:00 AM - 12:00 PM: 411 - Rough

2026-08-19 - 2026-FIRE-0004486

10:00 AM - 12:00 PM: 411 - Rough

2026-08-18 - 2025-COMMCON-0002527

09:00 AM - 11:00 AM: 108 - Final - Commercial

2026-08-18 - 2026-COMMCON-0000223

09:00 AM - 11:00 AM: 108 - Final - Commercial

09:00 AM - 11:00 AM: 109 - Other

2026-08-18 - 2026-COMMCON-0000819

09:00 AM - 11:00 AM: 108 - Final - Commercial

2026-08-17 - 2025-COMMCON-0002527

09:00 AM - 11:00 AM: 109 - Other

2026-08-17 - 2026-COMMCON-0000819

09:00 AM - 11:00 AM: 109 - Other

2026-08-14 - 2026-FIRE-0001783

08:00 AM - 10:30 AM: 412 - Final - Fire Suppression

2026-08-14 - 2026-FIRE-0003358

08:00 AM - 10:30 AM: 412 - Final - Fire Suppression

2026-08-14 - 2025-COMMCON-0002527

10:00 AM - 12:00 PM: 108 - Final - Commercial

2026-08-14 - 2026-COMMCON-0000223

10:00 AM - 12:00 PM: 108 - Final - Commercial

2026-08-14 - 2026-MECH-0002325

09:00 AM - 11:00 AM: 902 - Partial Rough

2026-08-14 - 2026-PLUMB-0001384

08:00 AM - 10:30 AM: 402 - Final - Plumbing

2026-08-13 - 2026-ELEC-0002458

08:30 AM - 09:30 AM: 303 - Full Rough

2026-08-12 - 2026-MECH-0001785

09:00 AM - 11:00 AM: 902 - Partial Rough

2026-08-11 - 2026-FIRE-0003557

09:00 AM - 12:00 PM: 303 - Full Rough

2026-08-11 - 2026-FIRE-0003656

09:00 AM - 12:00 PM: 303 - Full Rough

2026-08-11 - 2026-ELEC-0002458

09:00 AM - 12:00 PM: 303 - Full Rough

2026-08-11 - 2026-ELEC-0003292

09:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-11 - 2026-PLUMB-0002507

10:00 AM - 12:00 PM: 401 - Rough

2026-08-03 - 2026-FIRE-0003416

09:00 AM - 11:00 AM: 303 - Full Rough

2026-07-31 - 2026-FIRE-0002289

08:00 AM - 10:00 AM: 303 - Full Rough

2026-07-31 - 2026-ELEC-0001277

TBD: 305 - Final - Electrical

2026-07-30 - 2026-FIRE-0002289

08:30 AM - 05:30 PM: 303 - Full Rough

2026-07-30 - 2026-FIRE-0003416

08:30 AM - 05:30 PM: 303 - Full Rough

2026-07-29 - 2026-FIRE-0002289

11:00 AM - 01:00 PM: 303 - Full Rough

2026-07-29 - 2026-FIRE-0003416

11:00 AM - 01:00 PM: 303 - Full Rough

2026-07-27 - 2026-FIRE-0002289

08:30 AM - 10:30 AM: 303 - Full Rough

2026-07-27 - 2026-FIRE-0003416

08:30 AM - 10:30 AM: 303 - Full Rough

2026-07-24 - 2026-ELEC-0001277

08:00 AM - 10:00 AM: 304 - Partial Final

2026-07-23 - 2026-MECH-0001110

09:00 AM - 11:00 AM: 904 - Final - Mechanical

09:00 AM - 11:00 AM: Document Review

2026-07-23 - 2026-MECH-0002853

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-07-16 - 2026-COMMCON-0000977

09:00 AM - 11:00 AM: 109 - Other

2026-07-08 - 2026-FIRE-0002289

08:00 AM - 10:00 AM: 303 - Full Rough

2026-07-08 - 2026-FIRE-0003416

08:00 AM - 10:00 AM: 303 - Full Rough

2026-07-08 - 2026-ELEC-0001277

08:00 AM - 10:00 AM: 303 - Full Rough

2026-06-29 - 2026-FIRE-0003358

08:00 AM - 10:00 AM: 411 - Rough

2026-06-26 - 2026-FIRE-0003358

08:00 AM - 10:00 AM: 411 - Rough

2026-06-23 - 2026-FIRE-0002289

08:30 AM - 05:30 PM: 303 - Full Rough

2026-06-22 - 2026-ELEC-0001277

09:00 AM - 12:00 PM: 308 - Ceiling

2121 W 28th Ave

Directions

Recent Inspections

2026-10-27 - 2026-RESCON-0000396

11:00 AM - 01:00 PM: 112 - Frame

2026-10-22 - 2026-MECH-0004509

01:00 PM - 03:00 PM: 903 - Rough

2026-10-13 - 2026-MECH-0004509

09:00 AM - 11:00 AM: 903 - Rough

2026-10-09 - 2025-ELEC-0010606

08:30 AM - 10:30 AM: 303 - Full Rough

2026-10-08 - 2025-ELEC-0010606

08:30 AM - 10:30 AM: 302 - Partial Rough

2026-09-23 - 2025-ELEC-0010606

08:30 AM - 10:30 AM: 307 - Service Equipment

2026-08-28 - 2026-RESCON-0000396

08:30 AM - 10:30 AM: 109 - Other

2026-08-03 - 2026-RESCON-0000396

09:00 AM - 11:00 AM: 105 - Exterior Sheathing

2026-07-20 - 2026-RESCON-0000396

09:00 AM - 11:00 AM: 105 - Exterior Sheathing

1490 W 38th AVE

Directions

Recent Inspections

2026-10-26 - 2022-RESCON-0003608

12:00 PM - 02:00 PM: Document Review

2026-10-23 - 2022-RESCON-0003608

10:00 AM - 12:00 PM: Document Review

2026-10-22 - 2022-RESCON-0003608

10:00 AM - 12:00 PM: Document Review

2026-10-01 - 2026-ROOFSIDE-0006007

10:00 AM - 12:00 PM: 201 - Final - Roof

2026-09-29 - 2022-RESCON-0003608

09:00 AM - 11:00 AM: Document Review

2026-09-28 - 2022-RESCON-0003608

09:00 AM - 11:00 AM: Document Review

2026-09-24 - 2022-RESCON-0003608

10:00 AM - 12:00 PM: Document Review

2026-09-18 - 2026-PLUMB-0000745

10:00 AM - 12:30 PM: 402 - Final - Plumbing

2026-09-15 - 2026-ELEC-0001409

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-09-15 - 2026-MECH-0000420

12:00 PM - 02:00 PM: 904 - Final - Mechanical

2026-06-23 - 2026-PLUMB-0005177

10:00 AM - 12:30 PM: 404 - Water Service

1460 W 38th AVE

Directions

Recent Inspections

2026-10-26 - 2022-RESCON-0003606

12:00 PM - 02:00 PM: Document Review

2026-10-22 - 2022-RESCON-0003606

10:00 AM - 12:00 PM: Document Review

2026-10-05 - 2022-RESCON-0003606

TBD: 113 - Pre Construction Meeting

2026-10-01 - 2022-RESCON-0003606

10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy

2026-10-01 - 2026-ROOFSIDE-0006005

10:00 AM - 12:00 PM: 201 - Final - Roof

2026-09-30 - 2022-RESCON-0003606

10:00 AM - 12:00 PM: 120 - Temporary Certificate of Occupancy

2026-09-29 - 2022-RESCON-0003606

09:00 AM - 11:00 AM: Document Review

2026-09-28 - 2022-RESCON-0003606

09:00 AM - 11:00 AM: Document Review

2026-09-24 - 2022-RESCON-0003606

10:00 AM - 12:00 PM: Document Review

2026-09-18 - 2026-PLUMB-0000742

10:00 AM - 12:30 PM: 402 - Final - Plumbing

2026-09-18 - 2026-ELEC-0001410

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-09-16 - 2022-RESCON-0003606

08:30 AM - 10:30 AM: 109 - Other

2026-09-15 - 2026-ELEC-0001410

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-09-15 - 2026-MECH-0000419

12:00 PM - 02:00 PM: 904 - Final - Mechanical

2026-07-17 - 2022-RESCON-0003606

10:30 AM - 12:30 PM: 109 - Other

2336 N Osceola ST

Directions

Recent Inspections

2026-10-27 - 2024-RESCON-0003598

11:00 AM - 01:00 PM: 108 - Final - Residential

11:00 AM - 01:00 PM: 121 - Certificate of Occupancy

2026-10-20 - 2024-RESCON-0003598

08:00 AM - 10:00 AM: Document Review

2026-10-08 - 2024-RESCON-0003598

TBD: Document Review

2026-10-07 - 2024-RESCON-0003598

08:00 AM - 10:00 AM: 121 - Certificate of Occupancy

2026-09-17 - 2026-ELEC-0003419

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-09-16 - 2026-ELEC-0003419

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-09-16 - 2026-MECH-0002507

10:00 AM - 12:00 PM: 904 - Final - Mechanical

2026-09-16 - 2026-MECH-0002317

TBD: 904 - Final - Mechanical

2026-09-14 - 2025-PLUMB-0009964

11:00 AM - 01:00 PM: 402 - Final - Plumbing

2026-09-08 - 2026-ELEC-0003419

01:00 PM - 03:00 PM: 305 - Final - Electrical

2256 N Hudson ST

Directions

Recent Inspections

2026-10-27 - 2026-ELEC-0009352

08:00 AM - 10:00 AM: 303 - Full Rough

08:00 AM - 10:00 AM: 313 - Meter Release

2026-10-23 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: Document Review

10:00 AM - 12:00 PM: 200 - Blown Insulation

2026-10-21 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: 106 - Batt Insulation

2026-10-14 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: 112 - Frame

2026-10-14 - 2026-ELEC-0009351

12:00 PM - 02:30 PM: 303 - Full Rough

2026-10-13 - 2026-ELEC-0009351

12:00 PM - 02:30 PM: 303 - Full Rough

2026-10-05 - 2026-ELEC-0009351

12:00 PM - 02:30 PM: 301 - Underground

2026-10-01 - 2026-PLUMB-0005885

08:30 AM - 09:30 AM: 401 - Rough

08:30 AM - 09:30 AM: 403 - Pressure Test

08:30 AM - 09:30 AM: 405 - Meter Release

2026-09-30 - 2026-PLUMB-0005885

10:00 AM - 12:00 PM: 401 - Rough

10:00 AM - 12:00 PM: 403 - Pressure Test

12:00 PM - 03:00 PM: 405 - Meter Release

2026-09-25 - 2026-MECH-0005695

11:00 AM - 01:00 PM: 903 - Rough

2026-09-24 - 2026-RESCON-0000820

TBD: Document Review

2026-09-22 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: Document Review

2026-09-21 - 2026-RESCON-0000820

10:00 AM - 01:00 PM: Document Review

2026-09-18 - 2026-MECH-0004791

01:00 PM - 03:00 PM: 903 - Rough

2026-09-17 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

2026-09-10 - 2026-RESCON-0000820

TBD: Document Review

2026-09-09 - 2026-RESCON-0000820

12:00 PM - 02:00 PM: Document Review

2026-09-08 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: Document Review

2026-09-01 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: Document Review

2026-08-31 - 2026-RESCON-0000820

12:00 PM - 02:00 PM: Document Review

2026-08-28 - 2026-RESCON-0000820

12:00 PM - 02:00 PM: Document Review

2026-08-26 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: 105 - Exterior Sheathing

2026-08-03 - 2026-RESCON-0000820

10:00 AM - 01:00 PM: 109 - Other

2026-07-27 - 2026-RESCON-0000820

10:00 AM - 12:00 PM: 109 - Other

2026-07-23 - 2026-PLUMB-0005885

10:00 AM - 12:00 PM: 400 - Groundwork

2026-07-23 - 2026-PLUMB-0005887

10:00 AM - 12:00 PM: 402 - Final - Plumbing

2026-07-20 - 2026-RESCON-0000820

10:00 AM - 01:00 PM: Document Review

2026-07-16 - 2026-RESCON-0000820

10:00 AM - 01:00 PM: 109 - Other

2026-07-10 - 2026-RESCON-0000820

10:00 AM - 01:00 PM: 113 - Pre Construction Meeting

2026-07-09 - 2026-RESCON-0000819

10:00 AM - 01:00 PM: 108 - Final - Residential

2026-07-06 - 2026-RESCON-0000819

01:00 PM - 03:00 PM: 109 - Other

2026-06-22 - 2026-RESCON-0000819

10:00 AM - 12:00 PM: 109 - Other

840 S Race ST

Directions

Recent Inspections

2026-10-27 - 2025-RESCON-0003643

11:30 AM - 01:30 PM: 111 - Exterior Lath

2026-10-27 - 2026-PLUMB-0008170

10:00 AM - 12:00 PM: 401 - Rough

2026-10-06 - 2025-RESCON-0003643

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

2026-09-25 - 2025-RESCON-0003643

01:00 PM - 03:00 PM: 109 - Other

2026-09-24 - 2026-ELEC-0008563

07:00 AM - 01:00 PM: 301 - Underground

2026-09-23 - 2026-ELEC-0008563

07:00 AM - 01:00 PM: 301 - Underground

2026-09-22 - 2025-RESCON-0003643

08:30 AM - 10:30 AM: 105 - Exterior Sheathing

08:30 AM - 10:30 AM: 109 - Other

2026-09-21 - 2026-ELEC-0008563

09:00 AM - 11:00 AM: 301 - Underground

2026-08-04 - 2025-RESCON-0003643

12:00 PM - 02:00 PM: 101 - Foundation Wall

2026-07-30 - 2025-RESCON-0003643

09:00 AM - 11:00 AM: 100 - Footing

2026-07-29 - 2025-RESCON-0003643

01:00 PM - 03:00 PM: 100 - Footing

2975 E Cedar Ave

Directions

Recent Inspections

2026-10-27 - 2025-RESCON-0002188

11:00 AM - 01:00 PM: 107 - Drywall

2026-10-26 - 2025-RESCON-0002188

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-21 - 2025-RESCON-0002188

TBD: Document Review

2026-10-13 - 2025-RESCON-0002188

01:00 AM - 03:00 PM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 200 - Blown Insulation

2026-10-08 - 2026-ELEC-0002722

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

2026-10-08 - 2026-ELEC-0002713

TBD: 307 - Service Equipment

TBD: 313 - Meter Release

2026-09-30 - 2025-RESCON-0002188

01:00 PM - 03:00 PM: 112 - Frame

2026-09-28 - 2025-RESCON-0002188

11:00 AM - 01:00 PM: 112 - Frame

2026-09-24 - 2025-RESCON-0002188

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-18 - 2026-MECH-0003647

11:00 AM - 01:00 PM: 903 - Rough

2026-09-18 - 2026-MECH-0006056

11:00 AM - 01:00 PM: 903 - Rough

2026-09-16 - 2026-ELEC-0002722

09:00 AM - 11:00 AM: 303 - Full Rough

2026-09-15 - 2025-RESCON-0002188

09:00 AM - 11:00 AM: 111 - Exterior Lath

2026-08-14 - 2026-ROOFSIDE-0003043

09:00 AM - 11:00 AM: 206 - Other

2026-08-13 - 2026-PLUMB-0002847

08:30 AM - 09:30 AM: 401 - Rough

08:30 AM - 09:30 AM: 403 - Pressure Test

08:30 AM - 09:30 AM: 405 - Meter Release

2026-07-10 - 2026-PLUMB-0005536

11:00 AM - 01:00 PM: 402 - Final - Plumbing

11:00 AM - 01:00 PM: 404 - Water Service

3710 N Zuni ST

Directions

Recent Inspections

2026-10-26 - 2025-MECH-0008433

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-23 - 2026-RESCON-0000947

07:00 AM - 08:00 AM: 108 - Final - Residential

2026-10-23 - 2026-RESCON-0000950

07:00 AM - 08:00 AM: 108 - Final - Residential

2026-10-22 - 2026-RESCON-0000947

07:00 AM - 09:00 AM: 108 - Final - Residential

2026-10-22 - 2026-RESCON-0000950

07:00 AM - 09:00 AM: 108 - Final - Residential

2026-10-21 - 2026-RESCON-0000947

11:00 AM - 01:00 PM: 108 - Final - Residential

2026-10-21 - 2026-RESCON-0000950

11:00 AM - 01:00 PM: 108 - Final - Residential

2026-10-20 - 2026-RESCON-0000947

09:00 AM - 12:00 PM: 108 - Final - Residential

2026-10-20 - 2026-RESCON-0000950

09:00 AM - 12:00 PM: 108 - Final - Residential

2026-10-19 - 2026-PLUMB-0008368

10:30 AM - 12:30 PM: 402 - Final - Plumbing

2026-10-14 - 2025-MECH-0008433

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-13 - 2025-MECH-0008433

11:00 AM - 01:00 PM: 904 - Final - Mechanical

2026-10-07 - 2025-ELEC-0013358

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-10-06 - 2025-ELEC-0013358

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-10-06 - 2025-MECH-0008433

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-09-21 - 2025-MECH-0008433

12:00 PM - 02:00 PM: 903 - Rough

2026-09-21 - 2026-ELEC-0004658

08:30 AM - 10:30 AM: 305 - Final - Electrical

2026-07-21 - 2026-RESCON-0000950

10:30 AM - 12:30 PM: 111 - Exterior Lath

2026-07-16 - 2026-RESCON-0000950

08:30 AM - 10:30 AM: 107 - Drywall

2026-06-23 - 2026-RESCON-0000947

12:30 PM - 02:30 PM: 111 - Exterior Lath

6705 E Layton AVE

Directions

Recent Inspections

2026-10-27 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-27 - 2026-FIRE-0000859

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-27 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-27 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-10-27 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-26 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-10-23 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-23 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-10-22 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-21 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-20 - 2025-MECH-0007065

08:30 AM - 09:30 AM: 903 - Rough

2026-10-19 - 2025-FIRE-0006554

10:00 AM - 12:00 PM: 411 - Rough

2026-10-19 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-15 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-14 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-10-13 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-10 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-09 - 2025-COMMCON-0000796

08:30 AM - 09:30 AM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-10-09 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-10-09 - 2025-PLUMB-0009505

11:00 AM - 03:00 PM: 404 - Water Service

2026-10-08 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-07 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-06 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-03 - 2025-COMMCON-0000796

TBD: 106 - Batt Insulation

2026-10-02 - 2025-COMMCON-0000796

TBD: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-10-02 - 2026-ELEC-0000736

01:00 PM - 03:00 PM: 307 - Service Equipment

2026-09-30 - 2025-FIRE-0006782

02:00 PM - 04:00 PM: 302 - Partial Rough

2026-09-30 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-30 - 2025-ELEC-0009877

02:00 PM - 04:00 PM: 302 - Partial Rough

2026-09-30 - 2025-MECH-0007065

01:00 AM - 03:00 PM: 903 - Rough

2026-09-29 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-09-29 - 2025-FIRE-0006782

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-29 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-29 - 2025-ELEC-0009877

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-29 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-09-28 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-28 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-28 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-28 - 2025-PLUMB-0009505

10:00 AM - 12:00 PM: 401 - Rough

2026-09-26 - 2026-ELEC-0000736

01:00 PM - 03:00 PM: 313 - Meter Release

2026-09-25 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-25 - 2025-PLUMB-0009505

01:00 PM - 03:00 PM: 402 - Final - Plumbing

2026-09-25 - 2026-ELEC-0000736

01:00 PM - 03:00 PM: 307 - Service Equipment

01:00 PM - 03:00 PM: 313 - Meter Release

2026-09-25 - 2026-PLUMB-0006812

01:00 PM - 03:00 PM: 401 - Rough

2026-09-24 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-24 - 2026-ELEC-0000736

02:00 PM - 04:00 PM: 307 - Service Equipment

2026-09-23 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-22 - 2025-COMMCON-0000796

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

10:00 AM - 12:00 PM: 106 - Batt Insulation

2026-09-22 - 2025-FIRE-0006782

02:00 AM - 04:00 PM: 302 - Partial Rough

2026-09-22 - 2025-ELEC-0009877

02:00 AM - 04:00 PM: 302 - Partial Rough

2026-09-21 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-21 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-21 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-18 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-18 - 2026-FIRE-0000859

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-18 - 2025-COMMCON-0000796

09:30 AM - 11:30 AM: 106 - Batt Insulation

09:30 AM - 11:30 AM: 107 - Drywall

09:30 AM - 11:30 AM: 112 - Frame

2026-09-18 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-17 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-17 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 902 - Partial Rough

01:00 PM - 03:00 PM: 903 - Rough

2026-09-17 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-16 - 2025-COMMCON-0000796

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-15 - 2025-COMMCON-0000796

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-14 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-11 - 2025-COMMCON-0000796

08:30 AM - 09:30 AM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-10 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-09 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-09 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-09 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-09-09 - 2026-PLUMB-0003780

08:30 AM - 11:30 AM: 401 - Rough

2026-09-09 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-08 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-08 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-08 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-05 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-04 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-03 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-03 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-03 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-03 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-09-02 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-02 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-02 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-01 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-01 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-01 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-31 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-31 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-28 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-28 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-27 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-27 - 2026-ELEC-0003951

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-27 - 2026-PLUMB-0003780

08:30 AM - 11:30 AM: 401 - Rough

2026-08-26 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-08-26 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-26 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-26 - 2025-MECH-0007065

12:00 PM - 02:00 PM: 903 - Rough

2026-08-26 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-21 - 2025-COMMCON-0000796

09:30 AM - 11:30 AM: 106 - Batt Insulation

09:30 AM - 11:30 AM: 107 - Drywall

09:30 AM - 11:30 AM: 112 - Frame

2026-08-21 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-21 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-08-21 - 2026-PLUMB-0003781

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-08-21 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-20 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-20 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-19 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-19 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-19 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-18 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-08-18 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-18 - 2026-PLUMB-0003781

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-08-18 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-17 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-17 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-14 - 2025-FIRE-0006782

TBD: 302 - Partial Rough

2026-08-14 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-14 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-08-14 - 2026-ELEC-0003951

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-14 - 2026-PLUMB-0003780

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-08-13 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 112 - Frame

2026-08-13 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-13 - 2025-FIRE-0006782

TBD: 302 - Partial Rough

2026-08-12 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-12 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-12 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-12 - 2026-PLUMB-0003780

08:30 AM - 11:30 AM: 401 - Rough

2026-08-11 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-11 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-11 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-11 - 2026-PLUMB-0003780

08:30 AM - 11:30 AM: 401 - Rough

2026-08-10 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-10 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-08-10 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-08-10 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-07 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-07 - 2026-COMMCON-0000829

TBD: 113 - Pre Construction Meeting

2026-08-07 - 2025-COMMCON-0000796

09:30 AM - 11:30 AM: 106 - Batt Insulation

09:30 AM - 11:30 AM: 107 - Drywall

09:30 AM - 11:30 AM: 112 - Frame

2026-08-07 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-06 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-06 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-08-06 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-05 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-05 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-08-04 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-04 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-08-04 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-04 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-08-04 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 903 - Rough

2026-08-03 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-08-03 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-03 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-31 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-07-31 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-30 - 2025-BOILERAC-0000818

11:00 AM - 01:00 PM: 701 - Pressure Test

2026-07-29 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-28 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-28 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-07-24 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-07-24 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-23 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-23 - 2025-COMMCON-0000796

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-23 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-07-22 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-07-22 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-07-21 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-07-21 - 2025-ELEC-0009877

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-20 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-07-20 - 2025-PLUMB-0009505

08:30 AM - 11:30 AM: 401 - Rough

2026-07-17 - 2025-COMMCON-0000796

09:00 AM - 09:30 AM: 106 - Batt Insulation

09:00 AM - 09:30 AM: 107 - Drywall

09:00 AM - 09:30 AM: 112 - Frame

2026-07-17 - 2025-PLUMB-0009505

08:00 AM - 10:00 AM: 401 - Rough

2026-07-15 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-07-14 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-07-14 - 2025-PLUMB-0009505

10:00 AM - 01:00 PM: 401 - Rough

2026-07-13 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-11 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-07-10 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-10 - 2026-ROOFSIDE-0002018

01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof

2026-07-10 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-07-10 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-07-09 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-09 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-09 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-08 - 2025-FIRE-0006554

08:30 AM - 11:30 AM: 411 - Rough

2026-07-08 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-07-08 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-08 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-07 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-07-07 - 2025-MECH-0007069

01:00 PM - 03:00 PM: 903 - Rough

2026-07-07 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-07 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-07 - 2026-FIRE-0000859

TBD: 302 - Partial Rough

2026-07-06 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-06 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-02 - 2025-COMMCON-0000796

09:00 AM - 09:30 AM: 106 - Batt Insulation

09:00 AM - 09:30 AM: 107 - Drywall

09:00 AM - 09:30 AM: 112 - Frame

2026-07-02 - 2025-MECH-0007065

01:00 PM - 03:00 PM: 903 - Rough

2026-07-01 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-01 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-30 - 2025-COMMCON-0000796

09:00 AM - 11:00 AM: 106 - Batt Insulation

09:00 AM - 11:00 AM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-06-29 - 2025-BOILERAC-0000818

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-06-26 - 2026-FIRE-0000859

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-26 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-26 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-24 - 2025-COMMCON-0000796

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-23 - 2025-FIRE-0006782

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-23 - 2026-FIRE-0000859

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-23 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-06-23 - 2025-ELEC-0009877

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-06-22 - 2025-FIRE-0006782

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-22 - 2025-COMMCON-0000796

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-06-22 - 2025-ELEC-0009877

12:00 PM - 02:00 PM: 302 - Partial Rough