Property Status: Active

4249 N Rifle ST

Directions

Recent Inspections

2026-10-27 - 2024-COMMCON-0001140

09:00 AM - 11:00 AM: 109 - Other

2026-10-22 - 2024-COMMCON-0001140

11:00 AM - 01:00 PM: 109 - Other

2026-10-13 - 2025-COMMCON-0001847

08:00 AM - 10:00 AM: 108 - Final - Commercial

2026-09-30 - 2025-COMMCON-0001847

09:00 AM - 11:00 AM: Document Review Inspection

2026-09-28 - 2025-COMMCON-0001847

11:00 AM - 12:30 PM: 108 - Final - Commercial

2026-09-28 - 2025-ELEC-0003309

07:00 AM - 01:00 PM: 300 - Slab

2026-09-22 - 2024-COMMCON-0001140

01:00 PM - 03:00 PM: 109 - Other

2026-09-21 - 2025-ELEC-0003309

07:00 AM - 01:00 PM: 300 - Slab

2026-09-15 - 2024-COMMCON-0001140

10:00 AM - 11:00 AM: 109 - Other

2026-09-11 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 300 - Slab

2026-09-01 - 2024-COMMCON-0001140

08:00 AM - 10:00 AM: 109 - Other

2026-08-31 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 300 - Slab

2026-08-20 - 2024-COMMCON-0001140

07:30 AM - 08:30 AM: 109 - Other

2026-08-20 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 300 - Slab

2026-08-13 - 2024-COMMCON-0001140

08:30 AM - 09:30 AM: 109 - Other

2026-08-13 - 2025-ELEC-0003309

08:30 AM - 09:30 AM: 113 - Pre Construction Meeting

2026-08-12 - 2025-ELEC-0003309

08:30 AM - 09:30 AM: 300 - Slab

2026-08-11 - 2024-COMMCON-0001140

07:00 AM - 10:00 AM: Document Review Inspection

2026-08-11 - 2025-ELEC-0003309

08:30 AM - 09:30 AM: 300 - Slab

2026-08-06 - 2024-COMMCON-0001140

TBD: Document Review Inspection

2026-08-05 - 2024-COMMCON-0001140

01:00 PM - 03:00 PM: 109 - Other

2026-08-04 - 2024-COMMCON-0001140

11:00 AM - 12:30 PM: 109 - Other

2026-08-03 - 2024-COMMCON-0001140

01:00 PM - 03:00 PM: 109 - Other

2026-07-31 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 300 - Slab

2026-07-28 - 2024-COMMCON-0001140

10:00 AM - 12:00 PM: 109 - Other

2026-07-27 - 2024-COMMCON-0001140

08:00 AM - 10:00 AM: 109 - Other

2026-07-22 - 2024-COMMCON-0001140

08:00 AM - 12:00 PM: 109 - Other

2026-07-21 - 2024-COMMCON-0001140

07:00 AM - 08:00 AM: 109 - Other

2026-07-20 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 301 - Underground

2026-07-14 - 2024-COMMCON-0001140

01:00 PM - 03:00 PM: 109 - Other

2026-07-08 - 2025-ELEC-0003309

10:00 AM - 12:00 PM: 300 - Slab

2026-07-06 - 2025-PLUMB-0004823

12:30 PM - 03:00 PM: 400 - Groundwork

2026-07-01 - 2025-ELEC-0003309

08:30 AM - 09:30 AM: 301 - Underground

2026-06-30 - 2025-ELEC-0003309

12:30 PM - 02:30 PM: 301 - Underground

2026-06-24 - 2025-PLUMB-0004823

10:30 AM - 12:30 PM: 400 - Groundwork

2026-06-24 - 2024-COMMCON-0001140

10:00 AM - 12:30 PM: 109 - Other

2026-06-23 - 2025-ELEC-0003309

10:00 AM - 12:30 PM: 301 - Underground

2026-06-23 - 2025-PLUMB-0004823

10:30 AM - 12:30 PM: 400 - Groundwork

2026-06-22 - 2025-ELEC-0003309

11:00 AM - 01:00 PM: 301 - Underground

1421 S Clayton ST

Directions

Recent Inspections

2026-10-27 - 2024-RESCON-0000809

01:00 PM - 03:00 PM: 106 - Batt Insulation

2026-10-27 - 2025-ELEC-0010979

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-10-27 - 2025-ELEC-0005755

TBD: 305 - Final - Electrical

2026-10-26 - 2024-RESCON-0000809

01:00 PM - 03:00 PM: 109 - Other

2026-10-23 - 2025-MECH-0006183

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-23 - 2025-PLUMB-0005228

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-10-23 - 2026-MECH-0000490

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-20 - 2025-ROOFSIDE-0006381

10:00 AM - 12:00 PM: 201 - Final - Roof

2026-10-19 - 2025-ROOFSIDE-0006381

11:00 AM - 01:00 PM: 201 - Final - Roof

840 S Milwaukee ST

Directions

Recent Inspections

2026-10-27 - 2025-RESCON-0003464

11:30 AM - 01:30 PM: 107 - Drywall

2026-10-23 - 2025-RESCON-0003464

09:00 AM - 11:00 AM: 107 - Drywall

2026-10-09 - 2025-RESCON-0003464

08:30 AM - 10:30 AM: 111 - Exterior Lath

2026-10-01 - 2026-ROOFSIDE-0000336

11:30 AM - 01:30 PM: 201 - Final - Roof

2026-09-30 - 2025-RESCON-0003463

01:00 PM - 03:00 PM: 108 - Final - Residential

2026-09-30 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-29 - 2025-RESCON-0003464

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-28 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-25 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-14 - 2025-RESCON-0003464

12:00 PM - 02:00 PM: 106 - Batt Insulation

2026-09-02 - 2025-RESCON-0003463

11:00 AM - 01:00 PM: 108 - Final - Residential

2026-09-02 - 2025-RESCON-0003464

11:00 AM - 01:00 PM: 105 - Exterior Sheathing

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 111 - Exterior Lath

2026-09-01 - 2025-RESCON-0003463

10:00 AM - 12:00 PM: 112 - Frame

2026-08-31 - 2026-ELEC-0000644

09:00 AM - 11:00 AM: 303 - Full Rough

2026-08-26 - 2026-ELEC-0000644

10:00 AM - 12:00 PM: 303 - Full Rough

2026-08-10 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 111 - Exterior Lath

2026-08-06 - 2026-BOILERAC-0000248

09:00 AM - 11:00 AM: 701 - Pressure Test

2026-08-06 - 2026-PLUMB-0001964

10:00 AM - 12:00 PM: 401 - Rough

10:00 AM - 12:00 PM: 403 - Pressure Test

2026-07-23 - 2026-MECH-0003455

11:00 AM - 01:00 PM: 903 - Rough

2026-07-14 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 111 - Exterior Lath

2026-07-02 - 2025-RESCON-0003464

12:00 PM - 02:00 PM: 105 - Exterior Sheathing

2026-06-30 - 2025-RESCON-0003464

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

1290 S Santa Fe DR

Directions

Recent Inspections

2026-10-27 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-10-26 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

2026-10-26 - 2025-ELEC-0001998

01:00 PM - 03:00 PM: 313 - Meter Release

01:00 PM - 03:00 PM: 307 - Service Equipment

2026-10-23 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-10-23 - 2025-MECH-0001775

12:00 PM - 02:00 PM: 903 - Rough

2026-10-22 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-10-21 - 2026-FIRE-0005383

08:00 AM - 10:00 AM: 410 - Underground

2026-10-21 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-10-21 - 2026-MECH-0003089

11:00 AM - 01:00 PM: 903 - Rough

2026-10-20 - 2026-FIRE-0005383

08:00 AM - 10:00 AM: 410 - Underground

2026-10-20 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-10-19 - 2026-FIRE-0005383

08:00 AM - 10:00 AM: 410 - Underground

2026-10-19 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 107 - Drywall

2026-10-16 - 2025-COMMCON-0000065

TBD: 107 - Drywall

2026-10-15 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 107 - Drywall

2026-10-14 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-10-13 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

08:30 AM - 09:30 AM: 112 - Frame

2026-10-10 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-10 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-09 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-09 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

2026-10-09 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-10-08 - 2025-COMMCON-0000065

08:30 AM - 09:30 AM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-10-08 - 2025-ELEC-0001998

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-10-08 - 2026-FIRE-0002411

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-10-07 - 2025-COMMCON-0000065

01:00 PM - 02:00 PM: 107 - Drywall

01:00 PM - 02:00 PM: 112 - Frame

2026-10-06 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-10-06 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-06 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-05 - 2026-FIRE-0003584

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-05 - 2025-COMMCON-0000065

TBD: 106 - Batt Insulation

TBD: 107 - Drywall

TBD: 112 - Frame

2026-10-05 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-10-02 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 112 - Frame

2026-10-02 - 2025-ELEC-0001998

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-10-01 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-30 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-29 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

08:30 AM - 09:30 AM: 107 - Drywall

2026-09-28 - 2026-FIRE-0005383

08:00 AM - 10:00 AM: 410 - Underground

2026-09-28 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-25 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-09-24 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

10:00 AM - 12:00 PM: 112 - Frame

2026-09-23 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-22 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-22 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-22 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-21 - 2026-FIRE-0002411

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-21 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-21 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-18 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-18 - 2025-ELEC-0001998

09:00 AM - 11:00 PM: 302 - Partial Rough

2026-09-17 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-17 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-16 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

2026-09-15 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-14 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-11 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-09-10 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-09 - 2026-FIRE-0002411

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-09-09 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-09 - 2025-ELEC-0001998

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-09-08 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

2026-09-08 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-09-08 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-09-04 - 2025-COMMCON-0000065

02:00 PM - 03:00 PM: 106 - Batt Insulation

02:00 PM - 03:00 PM: 107 - Drywall

02:00 PM - 03:00 PM: 112 - Frame

2026-09-04 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-04 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-03 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

2026-09-03 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-03 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-02 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 107 - Drywall

2026-09-02 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-09-01 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-01 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-01 - 2026-FIRE-0002411

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-31 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-31 - 2025-MECH-0001775

01:00 PM - 03:00 PM: 903 - Rough

2026-08-31 - 2026-FIRE-0002411

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-29 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-29 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-29 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-28 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-28 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-28 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-27 - 2026-FIRE-0002411

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-27 - 2026-FIRE-0001947

08:00 AM - 10:00 AM: 411 - Rough

2026-08-27 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-08-27 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-26 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 106 - Batt Insulation

10:00 AM - 12:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-26 - 2025-ELEC-0001998

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-08-21 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-21 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-20 - 2025-COMMCON-0000065

08:30 AM - 10:30 AM: 112 - Frame

2026-08-20 - 2025-ELEC-0001998

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-20 - 2026-FIRE-0002411

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-19 - 2025-COMMCON-0000065

08:30 AM - 10:30 AM: 107 - Drywall

08:30 AM - 10:30 AM: 112 - Frame

2026-08-19 - 2025-ELEC-0001998

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-19 - 2026-FIRE-0002411

11:00 AM - 01:00 PM: 302 - Partial Rough

2026-08-18 - 2025-ELEC-0001998

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-18 - 2026-FIRE-0002411

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-17 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 112 - Frame

2026-08-17 - 2025-MECH-0001775

10:00 AM - 12:00 PM: 903 - Rough

2026-08-14 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

2026-08-14 - 2025-ELEC-0001998

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-08-13 - 2025-COMMCON-0000065

08:30 AM - 09:30 AM: 112 - Frame

2026-08-13 - 2025-ELEC-0001998

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-08-12 - 2026-FIRE-0002411

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-12 - 2025-COMMCON-0000065

08:30 AM - 10:30 AM: 106 - Batt Insulation

08:30 AM - 10:30 AM: 109 - Other

2026-08-12 - 2025-ELEC-0001998

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-11 - 2025-COMMCON-0000065

08:30 AM - 10:30 AM: 200 - Blown Insulation

2026-08-05 - 2025-MECH-0001775

01:00 PM - 03:00 PM: 903 - Rough

2026-08-05 - 2025-COMMCON-0000065

TBD: 107 - Drywall

2026-08-04 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-08-04 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-08-03 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-08-03 - 2025-MECH-0001775

12:00 PM - 02:00 PM: 903 - Rough

2026-08-03 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-31 - 2025-COMMCON-0000065

08:30 AM - 09:30 AM: 112 - Frame

2026-07-30 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

2026-07-30 - 2025-MECH-0001775

10:00 AM - 12:00 PM: 903 - Rough

2026-07-29 - 2026-FIRE-0001947

08:00 AM - 10:00 AM: 411 - Rough

2026-07-29 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 107 - Drywall

2026-07-29 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-28 - 2026-FIRE-0001947

08:00 AM - 10:00 AM: 411 - Rough

2026-07-28 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 107 - Drywall

2026-07-28 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-27 - 2026-FIRE-0001947

08:00 AM - 10:00 AM: 411 - Rough

2026-07-27 - 2025-COMMCON-0000065

09:00 AM - 11:00 AM: 107 - Drywall

2026-07-24 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 106 - Batt Insulation

12:00 PM - 02:00 PM: 107 - Drywall

2026-07-23 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 107 - Drywall

2026-07-23 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-22 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-21 - 2025-COMMCON-0000065

08:30 AM - 09:30 AM: 106 - Batt Insulation

2026-07-21 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-20 - 2026-FIRE-0001947

10:00 AM - 12:00 PM: 411 - Rough

2026-07-20 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 106 - Batt Insulation

2026-07-20 - 2025-ELEC-0001998

10:00 AM - 12:00 PM: 301 - Underground

2026-07-20 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-17 - 2025-MECH-0001775

12:00 PM - 02:00 PM: 902 - Partial Rough

2026-07-17 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-16 - 2025-COMMCON-0000065

12:00 PM - 02:00 PM: 112 - Frame

2026-07-16 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-15 - 2025-COMMCON-0000065

01:00 PM - 03:00 PM: 112 - Frame

2026-07-15 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-14 - 2026-FIRE-0001947

08:00 AM - 10:00 AM: 411 - Rough

2026-07-10 - 2025-COMMCON-0000065

08:30 AM - 09:30 AM: 112 - Frame

2026-07-09 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 112 - Frame

2026-07-09 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-08 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-07 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 109 - Other

2026-07-07 - 2025-ELEC-0001998

08:30 AM - 10:30 AM: 113 - Pre Construction Meeting

2026-07-07 - 2025-PLUMB-0002940

10:00 AM - 12:00 PM: 401 - Rough

2026-07-06 - 2026-ROOFSIDE-0002605

12:00 PM - 02:00 PM: 206 - Other

2026-07-06 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-07-01 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-06-29 - 2025-COMMCON-0000065

11:00 AM - 01:00 PM: 112 - Frame

2026-06-25 - 2025-PLUMB-0002940

08:00 AM - 10:00 AM: 401 - Rough

2026-06-24 - 2025-COMMCON-0000065

10:00 AM - 12:00 PM: 113 - Pre Construction Meeting

2026-06-23 - 2026-ROOFSIDE-0002605

01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof

8107 E Belleview AVE

Directions

Recent Inspections

2026-10-27 - 2026-PLUMB-0004431

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-10-27 - 2026-PLUMB-0004513

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-10-27 - 2026-COMMCON-0000705

01:00 PM - 03:00 PM: 112 - Frame

2026-10-26 - 2026-COMMCON-0001814

12:00 PM - 02:00 PM: 113 - Pre Construction Meeting

TBD: Document Review Inspection

2026-10-26 - 2026-COMMCON-0001927

12:00 PM - 02:00 PM: 113 - Pre Construction Meeting

2026-10-26 - 2026-COMMCON-0000740

08:30 AM - 09:30 AM: 109 - Other

2026-10-26 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 305 - Final - Electrical

2026-10-23 - 2026-COMMCON-0000740

08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy

2026-10-23 - 2026-ELEC-0004628

08:30 AM - 09:30 AM: 305 - Final - Electrical

2026-10-23 - 2026-PLUMB-0004513

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-10-22 - 2025-FIRE-0007075

08:30 AM - 11:30 AM: 412 - Final - Fire Suppression

2026-10-22 - 2026-FIRE-0003743

08:30 AM - 11:30 AM: 412 - Final - Fire Suppression

2026-10-22 - 2026-FIRE-0005340

08:30 AM - 11:30 AM: 411 - Rough

2026-10-22 - 2026-MECH-0002249

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-10-22 - 2026-PLUMB-0003293

08:30 AM - 11:30 AM: 401 - Rough

2026-10-22 - 2026-PLUMB-0004513

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-10-21 - 2026-FIRE-0003750

11:00 AM - 01:00 PM: 303 - Full Rough

2026-10-21 - 2026-ELEC-0004628

11:00 AM - 01:00 PM: 305 - Final - Electrical

2026-10-20 - 2025-FIRE-0005035

12:00 PM - 02:00 PM: 303 - Full Rough

2026-10-20 - 2025-FIRE-0007075

10:00 AM - 12:00 PM: 412 - Final - Fire Suppression

2026-10-20 - 2026-BOILERAC-0000402

08:30 AM - 05:30 PM: 704 - Final - Boiler AC

2026-10-20 - 2026-FIRE-0003742

10:00 AM - 12:00 PM: 412 - Final - Fire Suppression

2026-10-20 - 2026-FIRE-0003853

10:00 AM - 12:00 PM: 412 - Final - Fire Suppression

2026-10-20 - 2026-FIRE-0003854

12:00 PM - 02:00 PM: 303 - Full Rough

2026-10-20 - 2025-ELEC-0006694

12:00 PM - 02:00 PM: 304 - Partial Final

2026-10-20 - 2026-ELEC-0004628

12:00 PM - 02:00 PM: 308 - Ceiling

2026-10-20 - 2026-ELEC-0004787

12:00 PM - 02:00 PM: 301 - Underground

12:00 PM - 02:00 PM: 308 - Ceiling

12:00 PM - 02:00 PM: 309 - Walls

2026-10-16 - 2026-MECH-0003177

01:00 PM - 03:00 PM: Document Review

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-16 - 2026-FIRE-0001353

08:30 AM - 11:30 AM: 412 - Final - Fire Suppression

2026-10-14 - 2026-ELEC-0004787

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-10-13 - 2026-ELEC-0004787

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-10-09 - 2025-ELEC-0013764

TBD: 305 - Final - Electrical

2026-10-09 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 304 - Partial Final

2026-10-09 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 303 - Full Rough

2026-10-08 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 304 - Partial Final

2026-10-08 - 2025-ELEC-0013764

01:00 PM - 03:00 PM: 304 - Partial Final

TBD: 305 - Final - Electrical

2026-10-08 - 2025-MECH-0003051

01:00 PM - 03:00 PM: 904 - Final - Mechanical

2026-10-08 - 2026-ELEC-0004563

01:00 PM - 03:00 PM: 304 - Partial Final

2026-10-08 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 303 - Full Rough

2026-10-06 - 2026-ROOFSIDE-0002355

01:00 PM - 03:00 PM: 201 - Final - Roof

2026-09-28 - 2025-COMMCON-0001020

TBD: Document Review Inspection

2026-09-28 - 2026-FIRE-0003750

01:00 PM - 03:00 PM: 303 - Full Rough

2026-09-28 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 308 - Ceiling

2026-09-28 - 2026-MECH-0003177

01:00 PM - 03:00 PM: 903 - Rough

2026-09-24 - 2026-COMMCON-0000971

11:00 AM - 01:00 PM: 112 - Frame

2026-09-23 - 2026-ELEC-0004829

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-23 - 2026-PLUMB-0006708

08:30 AM - 11:30 AM: 401 - Rough

2026-09-18 - 2026-PLUMB-0003293

08:30 AM - 11:30 AM: 400 - Groundwork

08:30 AM - 11:30 AM: 401 - Rough

2026-09-15 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-15 - 2026-MECH-0005197

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-09-15 - 2026-PLUMB-0006708

08:30 AM - 11:30 AM: 400 - Groundwork

2026-09-11 - 2026-FIRE-0003743

08:30 AM - 11:30 AM: 411 - Rough

2026-09-11 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-11 - 2025-ELEC-0013764

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-09-10 - 2026-COMMCON-0000705

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-09-10 - 2026-ELEC-0004829

01:00 PM - 03:00 PM: 300 - Slab

2026-09-09 - 2026-BOILERAC-0000402

01:00 PM - 03:00 PM: 701 - Pressure Test

2026-09-03 - 2025-FIRE-0005035

01:00 PM - 03:00 PM: 303 - Full Rough

2026-09-03 - 2025-ELEC-0006694

TBD: 303 - Full Rough

2026-09-02 - 2025-FIRE-0007075

08:30 AM - 11:30 AM: 411 - Rough

2026-08-28 - 2026-COMMCON-0000971

11:00 AM - 01:00 PM: 113 - Pre Construction Meeting

2026-08-28 - 2026-MECH-0003177

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-08-11 - 2025-COMMCON-0001020

12:00 PM - 02:00 PM: 106 - Batt Insulation

2026-08-07 - 2026-COMMCON-0000705

09:30 AM - 11:30 AM: 113 - Pre Construction Meeting

2026-08-07 - 2026-MECH-0003177

01:00 PM - 03:00 PM: 902 - Partial Rough

2026-08-06 - 2025-COMMCON-0001020

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-07-31 - 2025-COMMCON-0001020

TBD: Document Review Inspection

2026-07-31 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 307 - Service Equipment

2026-07-31 - 2025-ELEC-0013764

01:00 PM - 03:00 PM: 307 - Service Equipment

2026-07-29 - 2025-COMMCON-0001020

11:00 AM - 01:00 PM: 106 - Batt Insulation

2026-07-28 - 2025-COMMCON-0001020

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-07-27 - 2025-COMMCON-0001020

09:00 AM - 11:00 AM: 106 - Batt Insulation

2026-07-25 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-25 - 2026-FIRE-0003750

01:00 PM - 03:00 PM: 303 - Full Rough

2026-07-24 - 2026-FIRE-0003750

01:00 PM - 03:00 PM: 303 - Full Rough

2026-07-24 - 2026-ELEC-0004321

08:30 AM - 09:30 AM: 301 - Underground

2026-07-24 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-22 - 2025-COMMCON-0001020

08:00 AM - 10:00 AM: Document Review Inspection

2026-07-22 - 2025-ELEC-0006694

12:00 PM - 02:00 PM: 302 - Partial Rough

12:00 PM - 02:00 PM: 307 - Service Equipment

2026-07-22 - 2025-ELEC-0013764

12:00 PM - 02:00 PM: 307 - Service Equipment

2026-07-22 - 2025-PLUMB-0004644

08:30 AM - 11:30 AM: 401 - Rough

2026-07-21 - 2025-ELEC-0006694

TBD: 302 - Partial Rough

2026-07-21 - 2026-ELEC-0004628

TBD: 302 - Partial Rough

2026-07-17 - 2025-COMMCON-0001020

09:00 AM - 09:30 AM: 112 - Frame

2026-07-16 - 2025-COMMCON-0001020

TBD: Document Review Inspection

2026-07-16 - 2025-FIRE-0007075

10:00 AM - 12:00 PM: 411 - Rough

2026-07-15 - 2025-PLUMB-0004644

08:00 AM - 10:00 AM: 405 - Meter Release

2026-07-15 - 2026-PLUMB-0004513

08:00 AM - 10:00 AM: 403 - Pressure Test

2026-07-13 - 2026-COMMCON-0000740

11:00 AM - 01:00 PM: 112 - Frame

2026-07-10 - 2025-PLUMB-0004644

08:30 AM - 11:30 AM: 401 - Rough

2026-07-10 - 2026-ELEC-0004628

11:00 AM - 01:00 PM: 309 - Walls

2026-07-10 - 2026-PLUMB-0004513

10:00 AM - 02:00 PM: 401 - Rough

2026-07-08 - 2026-ELEC-0004321

01:00 PM - 03:00 PM: 301 - Underground

2026-07-02 - 2026-FIRE-0001353

10:00 AM - 12:00 PM: 411 - Rough

2026-07-02 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 301 - Underground

2026-07-01 - 2025-PLUMB-0004644

08:30 AM - 11:30 AM: 401 - Rough

2026-06-26 - 2025-ELEC-0006694

01:00 PM - 03:00 PM: 301 - Underground

2026-06-23 - 2025-PLUMB-0004644

08:30 AM - 11:30 AM: 401 - Rough

2026-06-22 - 2025-PLUMB-0004644

08:30 AM - 11:30 AM: 401 - Rough

2026-06-22 - 2026-ELEC-0004628

01:00 PM - 03:00 PM: 301 - Underground

39 S Kalamath ST

Directions

Recent Inspections

2026-10-26 - 2025-FIRE-0003548

09:00 AM - 11:00 AM: 303 - Full Rough

2026-10-15 - 2024-GBO-0000036

08:00 AM - 10:00 AM: GBO - Pre Construction Meeting

2026-10-15 - 2025-FIRE-0003548

09:00 AM - 11:00 AM: 303 - Full Rough

2026-10-14 - 2025-FIRE-0003548

08:00 AM - 10:00 AM: 303 - Full Rough

2026-10-14 - 2024-COMMCON-0000112

11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy

2026-09-29 - 2024-ELEC-0005760

08:30 AM - 10:30 AM: 301 - Underground

2026-09-25 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-25 - 2024-ELEC-0005760

12:00 PM - 02:30 PM: 301 - Underground

12:00 PM - 02:30 PM: 308 - Ceiling

2026-09-24 - 2025-FIRE-0003548

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-09-24 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 107 - Drywall

12:00 PM - 02:00 PM: 112 - Frame

2026-09-23 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 301 - Underground

10:00 AM - 12:00 PM: 308 - Ceiling

2026-09-17 - 2024-COMMCON-0000112

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-14 - 2024-COMMCON-0000112

09:30 AM - 11:00 AM: 107 - Drywall

2026-09-12 - 2024-ELEC-0005760

11:00 AM - 01:00 PM: 301 - Underground

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

2026-09-11 - 2024-ELEC-0005760

11:00 AM - 01:00 PM: 307 - Service Equipment

11:00 AM - 01:00 PM: 313 - Meter Release

11:00 AM - 01:00 PM: 301 - Underground

2026-09-10 - 2024-ELEC-0005760

08:30 AM - 09:30 AM: 301 - Underground

08:30 AM - 09:30 AM: 307 - Service Equipment

08:30 AM - 09:30 AM: 313 - Meter Release

2026-09-09 - 2024-COMMCON-0000112

01:00 PM - 02:30 PM: 107 - Drywall

2026-09-04 - 2024-COMMCON-0000112

08:30 AM - 09:30 AM: 108 - Final - Commercial

2026-09-03 - 2024-MECH-0003074

12:00 PM - 02:00 PM: 902 - Partial Rough

2026-09-02 - 2024-COMMCON-0000112

11:00 AM - 01:00 PM: 107 - Drywall

2026-09-01 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 307 - Service Equipment

10:00 AM - 12:00 PM: 313 - Meter Release

2026-08-28 - 2025-FIRE-0003548

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-28 - 2024-ELEC-0005760

09:00 AM - 11:00 AM: 308 - Ceiling

2026-08-27 - 2025-FIRE-0003548

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-27 - 2025-FIRE-0004263

01:00 PM - 03:00 PM: 411 - Rough

2026-08-27 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 107 - Drywall

2026-08-27 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 308 - Ceiling

2026-08-26 - 2025-FIRE-0003548

08:30 AM - 05:30 PM: 302 - Partial Rough

2026-08-26 - 2024-ELEC-0005760

08:30 AM - 09:30 AM: 308 - Ceiling

2026-08-21 - 2024-ELEC-0005760

01:00 PM - 03:00 PM: 308 - Ceiling

2026-08-14 - 2024-ELEC-0005760

08:00 AM - 01:00 PM: 301 - Underground

2026-08-13 - 2024-ELEC-0005760

12:00 PM - 02:00 PM: 113 - Pre Construction Meeting

2026-08-12 - 2024-ELEC-0005760

08:00 AM - 03:00 PM: 301 - Underground

2026-08-10 - 2025-FIRE-0004263

11:00 AM - 01:00 PM: 411 - Rough

2026-08-10 - 2024-COMMCON-0000112

10:00 AM - 12:00 PM: 107 - Drywall

2026-08-10 - 2024-ELEC-0005760

01:00 PM - 03:00 PM: 301 - Underground

2026-07-23 - 2024-COMMCON-0000112

10:00 AM - 12:00 PM: 107 - Drywall

2026-07-14 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 112 - Frame

2026-07-13 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 309 - Walls

2026-07-13 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 107 - Drywall

2026-07-08 - 2024-ELEC-0005760

11:00 AM - 01:00 PM: 309 - Walls

2026-07-02 - 2025-FIRE-0004263

01:00 PM - 03:00 PM: 411 - Rough

2026-07-01 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 309 - Walls

2026-06-30 - 2024-COMMCON-0000112

12:00 PM - 02:00 PM: 112 - Frame

2026-06-30 - 2025-FIRE-0004263

01:00 PM - 03:00 PM: 411 - Rough

2026-06-29 - 2025-FIRE-0004263

10:00 AM - 12:00 PM: 411 - Rough

2026-06-26 - 2025-FIRE-0004263

08:00 AM - 10:30 AM: 411 - Rough

2026-06-22 - 2024-ELEC-0005760

10:00 AM - 12:00 PM: 308 - Ceiling

2026-06-22 - 2026-PLUMB-0003687

12:00 PM - 03:00 PM: 401 - Rough

220 N Acoma ST

Directions

Recent Inspections

2026-10-27 - 2023-ELEC-0013540

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-10-27 - 2023-ELEC-0013541

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-10-27 - 2023-ELEC-0013542

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-10-27 - 2023-ELEC-0013547

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-09-28 - 2023-ELEC-0013540

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-09-28 - 2023-ELEC-0013541

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-09-28 - 2023-ELEC-0013547

10:00 AM - 12:00 PM: 305 - Final - Electrical

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-09-25 - 2025-ELEC-0009886

08:30 AM - 09:30 AM: 305 - Final - Electrical

1245 S York St

Directions

Recent Inspections

2026-10-27 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-10-23 - 2026-RESCON-0000746

11:30 AM - 01:30 PM: 112 - Frame

2026-10-22 - 2026-ELEC-0009616

12:00 PM - 02:00 PM: 303 - Full Rough

12:00 PM - 02:00 PM: 307 - Service Equipment

12:00 PM - 02:00 PM: 313 - Meter Release

2026-10-21 - 2026-ELEC-0009616

09:00 AM - 11:00 AM: 303 - Full Rough

09:00 AM - 11:00 AM: 307 - Service Equipment

09:00 AM - 11:00 AM: 313 - Meter Release

2026-10-20 - 2026-MECH-0004332

TBD: Document Review

10:00 AM - 01:00 PM: 903 - Rough

2026-10-20 - 2026-ELEC-0009616

12:00 PM - 02:30 PM: 303 - Full Rough

12:00 PM - 02:30 PM: 307 - Service Equipment

12:00 PM - 02:30 PM: 313 - Meter Release

2026-10-16 - 2026-ELEC-0009616

08:00 AM - 10:00 AM: 303 - Full Rough

08:00 AM - 10:00 AM: 307 - Service Equipment

08:00 AM - 10:00 AM: 313 - Meter Release

2026-10-13 - 2026-ELEC-0009616

09:00 AM - 11:00 AM: 303 - Full Rough

09:00 AM - 11:00 AM: 307 - Service Equipment

09:00 AM - 11:00 AM: 313 - Meter Release

2026-10-13 - 2026-PLUMB-0005490

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-10-03 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 109 - Other

2026-10-02 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 109 - Other

2026-09-15 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-09-11 - 2026-RESCON-0000746

11:30 AM - 01:30 PM: 105 - Exterior Sheathing

2026-09-09 - 2026-PLUMB-0005490

08:30 AM - 11:30 AM: 403 - Pressure Test

08:30 AM - 11:30 AM: 405 - Meter Release

2026-09-08 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-09-08 - 2026-PLUMB-0005490

08:30 AM - 11:30 AM: 401 - Rough

08:30 AM - 11:30 AM: 403 - Pressure Test

2026-08-31 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-08-18 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 105 - Exterior Sheathing

2026-07-17 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-07-16 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 113 - Pre Construction Meeting

2026-07-13 - 2026-RESCON-0000746

01:00 PM - 03:00 PM: 116 - Building Slab

2026-07-13 - 2026-PLUMB-0005566

10:15 AM - 12:15 PM: 402 - Final - Plumbing

2026-07-08 - 2026-PLUMB-0005490

08:00 AM - 10:00 AM: 400 - Groundwork

2280 S Albion ST

Directions

Recent Inspections

2026-10-26 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-26 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-10-26 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-10-23 - 2025-FIRE-0006225

08:30 AM - 05:30 PM: 302 - Partial Rough

2026-10-23 - 2024-ELEC-0013842

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-10-21 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-10-21 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-10-20 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-10-20 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 300 - Slab

2026-10-16 - 2024-MECH-0008304

08:30 AM - 11:00 AM: 903 - Rough

2026-10-15 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-10-13 - 2024-MECH-0008306

11:00 AM - 01:00 PM: 903 - Rough

2026-10-09 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-10-08 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-10-07 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-10-06 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-10-05 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-10-01 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-30 - 2024-COMMCON-0002609

09:00 AM - 11:00 AM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

09:00 AM - 11:00 AM: 112 - Frame

2026-09-29 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-28 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-25 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-25 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-09-25 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-24 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-09-24 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 109 - Other

2026-09-24 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-23 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-23 - 2024-MECH-0008304

09:00 AM - 11:00 AM: 903 - Rough

2026-09-22 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-22 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-09-22 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-21 - 2025-FIRE-0006225

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-09-21 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-21 - 2024-ELEC-0013842

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-09-18 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-17 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-16 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-09-16 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-16 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-15 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-15 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 112 - Frame

2026-09-15 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-09-15 - 2024-MECH-0008304

11:00 AM - 01:00 PM: 903 - Rough

2026-09-14 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-09-11 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-09-10 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-09 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-09 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-09-09 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-03 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-02 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-01 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-09-01 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-09-01 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-31 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-08-31 - 2024-MECH-0008304

08:30 AM - 11:00 AM: 903 - Rough

2026-08-28 - 2025-FIRE-0006225

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-28 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-08-28 - 2024-ELEC-0013842

09:00 AM - 11:00 AM: 302 - Partial Rough

2026-08-27 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-08-26 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-08-21 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-21 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-08-21 - 2024-PLUMB-0012646

08:30 AM - 11:30 AM: 401 - Rough

2026-08-20 - 2025-FIRE-0006225

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-08-20 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-08-20 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-20 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-08-19 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-19 - 2025-FIRE-0006234

08:30 AM - 11:30 AM: 411 - Rough

2026-08-19 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-19 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-08-18 - 2025-FIRE-0006225

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-08-18 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-08-18 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 302 - Partial Rough

08:00 AM - 10:00 AM: 308 - Ceiling

2026-08-17 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-08-17 - 2024-MECH-0008304

09:00 AM - 11:00 AM: 903 - Rough

2026-08-14 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-14 - 2025-FIRE-0006234

08:00 AM - 10:00 AM: 411 - Rough

2026-08-14 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-14 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-13 - 2025-FIRE-0006225

08:30 AM - 05:30 PM: 302 - Partial Rough

2026-08-13 - 2024-COMMCON-0002609

08:30 AM - 09:30 AM: 107 - Drywall

08:30 AM - 09:30 AM: 109 - Other

08:30 AM - 09:30 AM: 112 - Frame

2026-08-13 - 2024-ELEC-0013842

08:30 AM - 09:30 AM: 302 - Partial Rough

2026-08-12 - 2025-FIRE-0006225

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-08-12 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-08-12 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-08-11 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-08-10 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-08-10 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-07 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-07 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-08-07 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-08-06 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-08-06 - 2024-MECH-0008304

09:30 AM - 11:30 AM: 903 - Rough

2026-08-05 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-08-04 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-08-04 - 2024-MECH-0008304

09:00 AM - 11:00 AM: 903 - Rough

2026-08-03 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-31 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-29 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-28 - 2024-COMMCON-0002609

08:30 AM - 10:30 AM: 107 - Drywall

08:30 AM - 10:30 AM: 109 - Other

08:30 AM - 10:30 AM: 112 - Frame

2026-07-27 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-07-27 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-24 - 2025-GBO-0000004

TBD: GBO - Pre Construction Meeting

2026-07-24 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-24 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-24 - 2024-ELEC-0013842

TBD: 302 - Partial Rough

2026-07-23 - 2024-ELEC-0013842

01:00 PM - 03:00 PM: 302 - Partial Rough

2026-07-23 - 2024-MECH-0008304

09:00 AM - 11:00 AM: 902 - Partial Rough

2026-07-22 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-07-22 - 2024-ELEC-0013842

12:30 PM - 02:30 PM: 308 - Ceiling

2026-07-21 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-07-21 - 2025-FIRE-0006234

08:00 AM - 10:00 AM: 411 - Rough

2026-07-21 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-21 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

10:00 AM - 12:00 PM: 308 - Ceiling

2026-07-20 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-07-20 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 307 - Service Equipment

2026-07-20 - 2024-MECH-0008304

09:00 AM - 11:30 AM: 903 - Rough

2026-07-17 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-17 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-16 - 2025-FIRE-0006225

08:00 AM - 10:00 AM: 302 - Partial Rough

2026-07-16 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-16 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 302 - Partial Rough

08:00 AM - 10:00 AM: 308 - Ceiling

2026-07-15 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-15 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-07-15 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

12:00 PM - 02:00 PM: 308 - Ceiling

2026-07-14 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

12:00 PM - 02:00 PM: 308 - Ceiling

2026-07-14 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-14 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-07-13 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-07-13 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-07-13 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

12:00 PM - 02:00 PM: 308 - Ceiling

2026-07-10 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

2026-07-10 - 2024-ELEC-0013842

08:30 AM - 09:30 AM: 308 - Ceiling

2026-07-09 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-07-08 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

11:00 AM - 01:00 PM: 107 - Drywall

2026-07-08 - 2024-MECH-0008304

11:00 AM - 01:00 PM: 903 - Rough

2026-07-07 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-07-06 - 2024-ELEC-0013842

08:00 AM - 10:00 AM: 305 - Final - Electrical

2026-07-01 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

2026-07-01 - 2024-MECH-0008304

11:00 AM - 01:00 PM: 903 - Rough

2026-06-30 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-06-30 - 2024-ELEC-0013842

01:00 PM - 03:00 PM: 309 - Walls

2026-06-29 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-29 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

2026-06-29 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 305 - Final - Electrical

12:00 PM - 02:00 PM: 309 - Walls

2026-06-26 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-26 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 109 - Other

11:00 AM - 01:00 PM: 112 - Frame

11:00 AM - 01:00 PM: 500 - Rough

2026-06-26 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

12:00 PM - 02:00 PM: 309 - Walls

2026-06-25 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-06-25 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 112 - Frame

2026-06-25 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-06-24 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-06-24 - 2025-FIRE-0006234

09:00 AM - 11:30 AM: 411 - Rough

2026-06-24 - 2024-COMMCON-0002609

11:00 AM - 01:00 PM: 106 - Batt Insulation

11:00 AM - 01:00 PM: 107 - Drywall

11:00 AM - 01:00 PM: 112 - Frame

2026-06-24 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-06-24 - 2026-ELEC-0001446

10:00 AM - 12:00 PM: 303 - Full Rough

2026-06-23 - 2025-FIRE-0006225

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-23 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 106 - Batt Insulation

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

2026-06-23 - 2024-ELEC-0013842

12:00 PM - 02:00 PM: 302 - Partial Rough

2026-06-23 - 2024-PLUMB-0012646

08:30 AM - 11:30 AM: 400 - Groundwork

2026-06-22 - 2025-FIRE-0006225

10:00 AM - 12:00 PM: 302 - Partial Rough

2026-06-22 - 2024-COMMCON-0002609

01:00 PM - 03:00 PM: 107 - Drywall

01:00 PM - 03:00 PM: 109 - Other

01:00 PM - 03:00 PM: 112 - Frame

2026-06-22 - 2024-ELEC-0013842

10:00 AM - 12:00 PM: 302 - Partial Rough

603 S Downing ST

Directions

Recent Inspections

2026-10-27 - 2025-RESCON-0002624

TBD: 120 - Temporary Certificate of Occupancy

2026-10-26 - 2025-RESCON-0002624

09:00 AM - 11:00 AM: 121 - Certificate of Occupancy

2026-10-26 - 2025-RESCON-0002625

08:30 AM - 05:30 PM: 121 - Certificate of Occupancy

2026-10-19 - 2025-RESCON-0002624

TBD: Document Review

2026-10-13 - 2025-RESCON-0002625

09:00 AM - 11:00 AM: Document Review

2026-09-25 - 2025-RESCON-0002624

01:00 PM - 03:00 PM: Document Review

2026-09-24 - 2025-RESCON-0002624

09:00 AM - 11:00 AM: Document Review

2026-09-23 - 2025-RESCON-0002624

09:00 AM - 11:00 AM: Document Review

2026-09-22 - 2025-RESCON-0002625

10:30 AM - 12:30 PM: 113 - Pre Construction Meeting

2026-09-22 - 2025-RESCON-0002624

10:30 AM - 12:30 PM: 120 - Temporary Certificate of Occupancy

2026-09-21 - 2025-RESCON-0002624

11:00 AM - 01:00 PM: 108 - Final - Residential

2026-09-21 - 2025-RESCON-0002625

11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy

2026-09-18 - 2025-RESCON-0002625

01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy

01:00 PM - 03:00 PM: Document Review

2026-09-18 - 2026-ELEC-0003621

10:00 AM - 12:00 PM: 305 - Final - Electrical

2026-09-18 - 2026-MECH-0001861

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-09-18 - 2026-PLUMB-0003611

10:00 AM - 12:30 PM: 402 - Final - Plumbing

2026-09-17 - 2025-RESCON-0002625

01:00 PM - 03:00 PM: Document Review

01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy

2026-09-17 - 2026-ROOFSIDE-0000996

08:30 AM - 10:30 AM: 201 - Final - Roof

2026-09-17 - 2026-ROOFSIDE-0005479

08:30 AM - 10:30 AM: 201 - Final - Roof

2026-09-17 - 2026-PLUMB-0000086

08:30 AM - 11:30 AM: 402 - Final - Plumbing

2026-09-16 - 2026-ELEC-0003620

09:00 AM - 11:00 AM: 305 - Final - Electrical

2026-09-16 - 2026-PLUMB-0000086

08:00 AM - 10:00 AM: 402 - Final - Plumbing

2026-09-15 - 2025-RESCON-0002624

11:00 AM - 01:00 PM: Document Review

2026-09-15 - 2026-MECH-0002489

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-09-14 - 2026-ROOFSIDE-0000996

09:00 AM - 11:00 AM: 201 - Final - Roof

2026-09-14 - 2026-ROOFSIDE-0005479

09:00 AM - 11:00 AM: 201 - Final - Roof

2026-09-11 - 2026-ROOFSIDE-0000996

09:00 AM - 11:00 AM: 201 - Final - Roof

2026-09-11 - 2026-ROOFSIDE-0005479

09:00 AM - 11:00 AM: 201 - Final - Roof

2026-09-11 - 2026-MECH-0002604

09:00 AM - 11:00 AM: 904 - Final - Mechanical

2026-08-17 - 2025-RESCON-0002625

09:00 AM - 11:00 AM: 109 - Other