4249 N Rifle ST
Recent Inspections
2026-10-27 - 2024-COMMCON-0001140
09:00 AM - 11:00 AM: 109 - Other
2026-10-22 - 2024-COMMCON-0001140
11:00 AM - 01:00 PM: 109 - Other
2026-10-13 - 2025-COMMCON-0001847
08:00 AM - 10:00 AM: 108 - Final - Commercial
2026-09-30 - 2025-COMMCON-0001847
09:00 AM - 11:00 AM: Document Review Inspection
2026-09-28 - 2025-COMMCON-0001847
11:00 AM - 12:30 PM: 108 - Final - Commercial
2026-09-28 - 2025-ELEC-0003309
07:00 AM - 01:00 PM: 300 - Slab
2026-09-22 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 109 - Other
2026-09-21 - 2025-ELEC-0003309
07:00 AM - 01:00 PM: 300 - Slab
2026-09-15 - 2024-COMMCON-0001140
10:00 AM - 11:00 AM: 109 - Other
2026-09-11 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 300 - Slab
2026-09-01 - 2024-COMMCON-0001140
08:00 AM - 10:00 AM: 109 - Other
2026-08-31 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 300 - Slab
2026-08-20 - 2024-COMMCON-0001140
07:30 AM - 08:30 AM: 109 - Other
2026-08-20 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 300 - Slab
2026-08-13 - 2024-COMMCON-0001140
08:30 AM - 09:30 AM: 109 - Other
2026-08-13 - 2025-ELEC-0003309
08:30 AM - 09:30 AM: 113 - Pre Construction Meeting
2026-08-12 - 2025-ELEC-0003309
08:30 AM - 09:30 AM: 300 - Slab
2026-08-11 - 2024-COMMCON-0001140
07:00 AM - 10:00 AM: Document Review Inspection
2026-08-11 - 2025-ELEC-0003309
08:30 AM - 09:30 AM: 300 - Slab
2026-08-06 - 2024-COMMCON-0001140
TBD: Document Review Inspection
2026-08-05 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 109 - Other
2026-08-04 - 2024-COMMCON-0001140
11:00 AM - 12:30 PM: 109 - Other
2026-08-03 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 109 - Other
2026-07-31 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 300 - Slab
2026-07-28 - 2024-COMMCON-0001140
10:00 AM - 12:00 PM: 109 - Other
2026-07-27 - 2024-COMMCON-0001140
08:00 AM - 10:00 AM: 109 - Other
2026-07-22 - 2024-COMMCON-0001140
08:00 AM - 12:00 PM: 109 - Other
2026-07-21 - 2024-COMMCON-0001140
07:00 AM - 08:00 AM: 109 - Other
2026-07-20 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 301 - Underground
2026-07-14 - 2024-COMMCON-0001140
01:00 PM - 03:00 PM: 109 - Other
2026-07-08 - 2025-ELEC-0003309
10:00 AM - 12:00 PM: 300 - Slab
2026-07-06 - 2025-PLUMB-0004823
12:30 PM - 03:00 PM: 400 - Groundwork
2026-07-01 - 2025-ELEC-0003309
08:30 AM - 09:30 AM: 301 - Underground
2026-06-30 - 2025-ELEC-0003309
12:30 PM - 02:30 PM: 301 - Underground
2026-06-24 - 2025-PLUMB-0004823
10:30 AM - 12:30 PM: 400 - Groundwork
2026-06-24 - 2024-COMMCON-0001140
10:00 AM - 12:30 PM: 109 - Other
2026-06-23 - 2025-ELEC-0003309
10:00 AM - 12:30 PM: 301 - Underground
2026-06-23 - 2025-PLUMB-0004823
10:30 AM - 12:30 PM: 400 - Groundwork
2026-06-22 - 2025-ELEC-0003309
11:00 AM - 01:00 PM: 301 - Underground
1421 S Clayton ST
Recent Inspections
2026-10-27 - 2024-RESCON-0000809
01:00 PM - 03:00 PM: 106 - Batt Insulation
2026-10-27 - 2025-ELEC-0010979
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-27 - 2025-ELEC-0005755
TBD: 305 - Final - Electrical
2026-10-26 - 2024-RESCON-0000809
01:00 PM - 03:00 PM: 109 - Other
2026-10-23 - 2025-MECH-0006183
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-10-23 - 2025-PLUMB-0005228
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-23 - 2026-MECH-0000490
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-10-20 - 2025-ROOFSIDE-0006381
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-10-19 - 2025-ROOFSIDE-0006381
11:00 AM - 01:00 PM: 201 - Final - Roof
840 S Milwaukee ST
Recent Inspections
2026-10-27 - 2025-RESCON-0003464
11:30 AM - 01:30 PM: 107 - Drywall
2026-10-23 - 2025-RESCON-0003464
09:00 AM - 11:00 AM: 107 - Drywall
2026-10-09 - 2025-RESCON-0003464
08:30 AM - 10:30 AM: 111 - Exterior Lath
2026-10-01 - 2026-ROOFSIDE-0000336
11:30 AM - 01:30 PM: 201 - Final - Roof
2026-09-30 - 2025-RESCON-0003463
01:00 PM - 03:00 PM: 108 - Final - Residential
2026-09-30 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-29 - 2025-RESCON-0003464
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-28 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-25 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-14 - 2025-RESCON-0003464
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-09-02 - 2025-RESCON-0003463
11:00 AM - 01:00 PM: 108 - Final - Residential
2026-09-02 - 2025-RESCON-0003464
11:00 AM - 01:00 PM: 105 - Exterior Sheathing
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 111 - Exterior Lath
2026-09-01 - 2025-RESCON-0003463
10:00 AM - 12:00 PM: 112 - Frame
2026-08-31 - 2026-ELEC-0000644
09:00 AM - 11:00 AM: 303 - Full Rough
2026-08-26 - 2026-ELEC-0000644
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-10 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-08-06 - 2026-BOILERAC-0000248
09:00 AM - 11:00 AM: 701 - Pressure Test
2026-08-06 - 2026-PLUMB-0001964
10:00 AM - 12:00 PM: 401 - Rough
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-07-23 - 2026-MECH-0003455
11:00 AM - 01:00 PM: 903 - Rough
2026-07-14 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 111 - Exterior Lath
2026-07-02 - 2025-RESCON-0003464
12:00 PM - 02:00 PM: 105 - Exterior Sheathing
2026-06-30 - 2025-RESCON-0003464
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
1290 S Santa Fe DR
Recent Inspections
2026-10-27 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-10-26 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-10-26 - 2025-ELEC-0001998
01:00 PM - 03:00 PM: 313 - Meter Release
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-10-23 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-10-23 - 2025-MECH-0001775
12:00 PM - 02:00 PM: 903 - Rough
2026-10-22 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-10-21 - 2026-FIRE-0005383
08:00 AM - 10:00 AM: 410 - Underground
2026-10-21 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-10-21 - 2026-MECH-0003089
11:00 AM - 01:00 PM: 903 - Rough
2026-10-20 - 2026-FIRE-0005383
08:00 AM - 10:00 AM: 410 - Underground
2026-10-20 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-10-19 - 2026-FIRE-0005383
08:00 AM - 10:00 AM: 410 - Underground
2026-10-19 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 107 - Drywall
2026-10-16 - 2025-COMMCON-0000065
TBD: 107 - Drywall
2026-10-15 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 107 - Drywall
2026-10-14 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-10-13 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
08:30 AM - 09:30 AM: 112 - Frame
2026-10-10 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-10 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-09 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-09 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-09 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-10-08 - 2025-COMMCON-0000065
08:30 AM - 09:30 AM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-10-08 - 2025-ELEC-0001998
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-10-08 - 2026-FIRE-0002411
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-10-07 - 2025-COMMCON-0000065
01:00 PM - 02:00 PM: 107 - Drywall
01:00 PM - 02:00 PM: 112 - Frame
2026-10-06 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-10-06 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-10-06 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-10-05 - 2026-FIRE-0003584
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-10-05 - 2025-COMMCON-0000065
TBD: 106 - Batt Insulation
TBD: 107 - Drywall
TBD: 112 - Frame
2026-10-05 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-10-02 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 112 - Frame
2026-10-02 - 2025-ELEC-0001998
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-10-01 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-30 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-29 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
08:30 AM - 09:30 AM: 107 - Drywall
2026-09-28 - 2026-FIRE-0005383
08:00 AM - 10:00 AM: 410 - Underground
2026-09-28 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-25 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-09-24 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 112 - Frame
2026-09-23 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-22 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-22 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-21 - 2026-FIRE-0002411
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-21 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-21 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-18 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-18 - 2025-ELEC-0001998
09:00 AM - 11:00 PM: 302 - Partial Rough
2026-09-17 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-17 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-16 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-15 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-14 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-11 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-09-10 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-09 - 2026-FIRE-0002411
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-09 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-09 - 2025-ELEC-0001998
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-08 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
2026-09-08 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-08 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-04 - 2025-COMMCON-0000065
02:00 PM - 03:00 PM: 106 - Batt Insulation
02:00 PM - 03:00 PM: 107 - Drywall
02:00 PM - 03:00 PM: 112 - Frame
2026-09-04 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-04 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
2026-09-03 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-02 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-02 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-09-01 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-01 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-01 - 2026-FIRE-0002411
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-31 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-31 - 2025-MECH-0001775
01:00 PM - 03:00 PM: 903 - Rough
2026-08-31 - 2026-FIRE-0002411
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-29 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-29 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-29 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-28 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-28 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-28 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-27 - 2026-FIRE-0002411
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2026-FIRE-0001947
08:00 AM - 10:00 AM: 411 - Rough
2026-08-27 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-27 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-26 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 106 - Batt Insulation
10:00 AM - 12:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-26 - 2025-ELEC-0001998
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-21 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-20 - 2025-COMMCON-0000065
08:30 AM - 10:30 AM: 112 - Frame
2026-08-20 - 2025-ELEC-0001998
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-20 - 2026-FIRE-0002411
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-19 - 2025-COMMCON-0000065
08:30 AM - 10:30 AM: 107 - Drywall
08:30 AM - 10:30 AM: 112 - Frame
2026-08-19 - 2025-ELEC-0001998
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-19 - 2026-FIRE-0002411
11:00 AM - 01:00 PM: 302 - Partial Rough
2026-08-18 - 2025-ELEC-0001998
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-18 - 2026-FIRE-0002411
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-17 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 112 - Frame
2026-08-17 - 2025-MECH-0001775
10:00 AM - 12:00 PM: 903 - Rough
2026-08-14 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
2026-08-14 - 2025-ELEC-0001998
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-13 - 2025-COMMCON-0000065
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2025-ELEC-0001998
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-12 - 2026-FIRE-0002411
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-12 - 2025-COMMCON-0000065
08:30 AM - 10:30 AM: 106 - Batt Insulation
08:30 AM - 10:30 AM: 109 - Other
2026-08-12 - 2025-ELEC-0001998
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-11 - 2025-COMMCON-0000065
08:30 AM - 10:30 AM: 200 - Blown Insulation
2026-08-05 - 2025-MECH-0001775
01:00 PM - 03:00 PM: 903 - Rough
2026-08-05 - 2025-COMMCON-0000065
TBD: 107 - Drywall
2026-08-04 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-04 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-08-03 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-03 - 2025-MECH-0001775
12:00 PM - 02:00 PM: 903 - Rough
2026-08-03 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-31 - 2025-COMMCON-0000065
08:30 AM - 09:30 AM: 112 - Frame
2026-07-30 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-30 - 2025-MECH-0001775
10:00 AM - 12:00 PM: 903 - Rough
2026-07-29 - 2026-FIRE-0001947
08:00 AM - 10:00 AM: 411 - Rough
2026-07-29 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-29 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-28 - 2026-FIRE-0001947
08:00 AM - 10:00 AM: 411 - Rough
2026-07-28 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-28 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-27 - 2026-FIRE-0001947
08:00 AM - 10:00 AM: 411 - Rough
2026-07-27 - 2025-COMMCON-0000065
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-24 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 106 - Batt Insulation
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-23 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-23 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-22 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-21 - 2025-COMMCON-0000065
08:30 AM - 09:30 AM: 106 - Batt Insulation
2026-07-21 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-20 - 2026-FIRE-0001947
10:00 AM - 12:00 PM: 411 - Rough
2026-07-20 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 106 - Batt Insulation
2026-07-20 - 2025-ELEC-0001998
10:00 AM - 12:00 PM: 301 - Underground
2026-07-20 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-17 - 2025-MECH-0001775
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-07-17 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-16 - 2025-COMMCON-0000065
12:00 PM - 02:00 PM: 112 - Frame
2026-07-16 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-15 - 2025-COMMCON-0000065
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-14 - 2026-FIRE-0001947
08:00 AM - 10:00 AM: 411 - Rough
2026-07-10 - 2025-COMMCON-0000065
08:30 AM - 09:30 AM: 112 - Frame
2026-07-09 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 112 - Frame
2026-07-09 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-08 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-07 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 109 - Other
2026-07-07 - 2025-ELEC-0001998
08:30 AM - 10:30 AM: 113 - Pre Construction Meeting
2026-07-07 - 2025-PLUMB-0002940
10:00 AM - 12:00 PM: 401 - Rough
2026-07-06 - 2026-ROOFSIDE-0002605
12:00 PM - 02:00 PM: 206 - Other
2026-07-06 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-07-01 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-06-29 - 2025-COMMCON-0000065
11:00 AM - 01:00 PM: 112 - Frame
2026-06-25 - 2025-PLUMB-0002940
08:00 AM - 10:00 AM: 401 - Rough
2026-06-24 - 2025-COMMCON-0000065
10:00 AM - 12:00 PM: 113 - Pre Construction Meeting
2026-06-23 - 2026-ROOFSIDE-0002605
01:00 PM - 03:00 PM: 205 - Pre Inspection Commercial Flat Roof
8107 E Belleview AVE
Recent Inspections
2026-10-27 - 2026-PLUMB-0004431
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-27 - 2026-PLUMB-0004513
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-27 - 2026-COMMCON-0000705
01:00 PM - 03:00 PM: 112 - Frame
2026-10-26 - 2026-COMMCON-0001814
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
TBD: Document Review Inspection
2026-10-26 - 2026-COMMCON-0001927
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-10-26 - 2026-COMMCON-0000740
08:30 AM - 09:30 AM: 109 - Other
2026-10-26 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 305 - Final - Electrical
2026-10-23 - 2026-COMMCON-0000740
08:30 AM - 09:30 AM: 120 - Temporary Certificate of Occupancy
2026-10-23 - 2026-ELEC-0004628
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-10-23 - 2026-PLUMB-0004513
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-22 - 2025-FIRE-0007075
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-22 - 2026-FIRE-0003743
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-22 - 2026-FIRE-0005340
08:30 AM - 11:30 AM: 411 - Rough
2026-10-22 - 2026-MECH-0002249
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-10-22 - 2026-PLUMB-0003293
08:30 AM - 11:30 AM: 401 - Rough
2026-10-22 - 2026-PLUMB-0004513
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-10-21 - 2026-FIRE-0003750
11:00 AM - 01:00 PM: 303 - Full Rough
2026-10-21 - 2026-ELEC-0004628
11:00 AM - 01:00 PM: 305 - Final - Electrical
2026-10-20 - 2025-FIRE-0005035
12:00 PM - 02:00 PM: 303 - Full Rough
2026-10-20 - 2025-FIRE-0007075
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-10-20 - 2026-BOILERAC-0000402
08:30 AM - 05:30 PM: 704 - Final - Boiler AC
2026-10-20 - 2026-FIRE-0003742
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-10-20 - 2026-FIRE-0003853
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-10-20 - 2026-FIRE-0003854
12:00 PM - 02:00 PM: 303 - Full Rough
2026-10-20 - 2025-ELEC-0006694
12:00 PM - 02:00 PM: 304 - Partial Final
2026-10-20 - 2026-ELEC-0004628
12:00 PM - 02:00 PM: 308 - Ceiling
2026-10-20 - 2026-ELEC-0004787
12:00 PM - 02:00 PM: 301 - Underground
12:00 PM - 02:00 PM: 308 - Ceiling
12:00 PM - 02:00 PM: 309 - Walls
2026-10-16 - 2026-MECH-0003177
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-10-16 - 2026-FIRE-0001353
08:30 AM - 11:30 AM: 412 - Final - Fire Suppression
2026-10-14 - 2026-ELEC-0004787
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-13 - 2026-ELEC-0004787
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-10-09 - 2025-ELEC-0013764
TBD: 305 - Final - Electrical
2026-10-09 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-09 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 303 - Full Rough
2026-10-08 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-08 - 2025-ELEC-0013764
01:00 PM - 03:00 PM: 304 - Partial Final
TBD: 305 - Final - Electrical
2026-10-08 - 2025-MECH-0003051
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-10-08 - 2026-ELEC-0004563
01:00 PM - 03:00 PM: 304 - Partial Final
2026-10-08 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 303 - Full Rough
2026-10-06 - 2026-ROOFSIDE-0002355
01:00 PM - 03:00 PM: 201 - Final - Roof
2026-09-28 - 2025-COMMCON-0001020
TBD: Document Review Inspection
2026-09-28 - 2026-FIRE-0003750
01:00 PM - 03:00 PM: 303 - Full Rough
2026-09-28 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 308 - Ceiling
2026-09-28 - 2026-MECH-0003177
01:00 PM - 03:00 PM: 903 - Rough
2026-09-24 - 2026-COMMCON-0000971
11:00 AM - 01:00 PM: 112 - Frame
2026-09-23 - 2026-ELEC-0004829
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-23 - 2026-PLUMB-0006708
08:30 AM - 11:30 AM: 401 - Rough
2026-09-18 - 2026-PLUMB-0003293
08:30 AM - 11:30 AM: 400 - Groundwork
08:30 AM - 11:30 AM: 401 - Rough
2026-09-15 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-15 - 2026-MECH-0005197
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-09-15 - 2026-PLUMB-0006708
08:30 AM - 11:30 AM: 400 - Groundwork
2026-09-11 - 2026-FIRE-0003743
08:30 AM - 11:30 AM: 411 - Rough
2026-09-11 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-11 - 2025-ELEC-0013764
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-09-10 - 2026-COMMCON-0000705
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-09-10 - 2026-ELEC-0004829
01:00 PM - 03:00 PM: 300 - Slab
2026-09-09 - 2026-BOILERAC-0000402
01:00 PM - 03:00 PM: 701 - Pressure Test
2026-09-03 - 2025-FIRE-0005035
01:00 PM - 03:00 PM: 303 - Full Rough
2026-09-03 - 2025-ELEC-0006694
TBD: 303 - Full Rough
2026-09-02 - 2025-FIRE-0007075
08:30 AM - 11:30 AM: 411 - Rough
2026-08-28 - 2026-COMMCON-0000971
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-08-28 - 2026-MECH-0003177
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-11 - 2025-COMMCON-0001020
12:00 PM - 02:00 PM: 106 - Batt Insulation
2026-08-07 - 2026-COMMCON-0000705
09:30 AM - 11:30 AM: 113 - Pre Construction Meeting
2026-08-07 - 2026-MECH-0003177
01:00 PM - 03:00 PM: 902 - Partial Rough
2026-08-06 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-31 - 2025-COMMCON-0001020
TBD: Document Review Inspection
2026-07-31 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-31 - 2025-ELEC-0013764
01:00 PM - 03:00 PM: 307 - Service Equipment
2026-07-29 - 2025-COMMCON-0001020
11:00 AM - 01:00 PM: 106 - Batt Insulation
2026-07-28 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-27 - 2025-COMMCON-0001020
09:00 AM - 11:00 AM: 106 - Batt Insulation
2026-07-25 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-25 - 2026-FIRE-0003750
01:00 PM - 03:00 PM: 303 - Full Rough
2026-07-24 - 2026-FIRE-0003750
01:00 PM - 03:00 PM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0004321
08:30 AM - 09:30 AM: 301 - Underground
2026-07-24 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-22 - 2025-COMMCON-0001020
08:00 AM - 10:00 AM: Document Review Inspection
2026-07-22 - 2025-ELEC-0006694
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-07-22 - 2025-ELEC-0013764
12:00 PM - 02:00 PM: 307 - Service Equipment
2026-07-22 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-07-21 - 2025-ELEC-0006694
TBD: 302 - Partial Rough
2026-07-21 - 2026-ELEC-0004628
TBD: 302 - Partial Rough
2026-07-17 - 2025-COMMCON-0001020
09:00 AM - 09:30 AM: 112 - Frame
2026-07-16 - 2025-COMMCON-0001020
TBD: Document Review Inspection
2026-07-16 - 2025-FIRE-0007075
10:00 AM - 12:00 PM: 411 - Rough
2026-07-15 - 2025-PLUMB-0004644
08:00 AM - 10:00 AM: 405 - Meter Release
2026-07-15 - 2026-PLUMB-0004513
08:00 AM - 10:00 AM: 403 - Pressure Test
2026-07-13 - 2026-COMMCON-0000740
11:00 AM - 01:00 PM: 112 - Frame
2026-07-10 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-07-10 - 2026-ELEC-0004628
11:00 AM - 01:00 PM: 309 - Walls
2026-07-10 - 2026-PLUMB-0004513
10:00 AM - 02:00 PM: 401 - Rough
2026-07-08 - 2026-ELEC-0004321
01:00 PM - 03:00 PM: 301 - Underground
2026-07-02 - 2026-FIRE-0001353
10:00 AM - 12:00 PM: 411 - Rough
2026-07-02 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 301 - Underground
2026-07-01 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-26 - 2025-ELEC-0006694
01:00 PM - 03:00 PM: 301 - Underground
2026-06-23 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-22 - 2025-PLUMB-0004644
08:30 AM - 11:30 AM: 401 - Rough
2026-06-22 - 2026-ELEC-0004628
01:00 PM - 03:00 PM: 301 - Underground
39 S Kalamath ST
Recent Inspections
2026-10-26 - 2025-FIRE-0003548
09:00 AM - 11:00 AM: 303 - Full Rough
2026-10-15 - 2024-GBO-0000036
08:00 AM - 10:00 AM: GBO - Pre Construction Meeting
2026-10-15 - 2025-FIRE-0003548
09:00 AM - 11:00 AM: 303 - Full Rough
2026-10-14 - 2025-FIRE-0003548
08:00 AM - 10:00 AM: 303 - Full Rough
2026-10-14 - 2024-COMMCON-0000112
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-29 - 2024-ELEC-0005760
08:30 AM - 10:30 AM: 301 - Underground
2026-09-25 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-25 - 2024-ELEC-0005760
12:00 PM - 02:30 PM: 301 - Underground
12:00 PM - 02:30 PM: 308 - Ceiling
2026-09-24 - 2025-FIRE-0003548
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-24 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 112 - Frame
2026-09-23 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 301 - Underground
10:00 AM - 12:00 PM: 308 - Ceiling
2026-09-17 - 2024-COMMCON-0000112
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-14 - 2024-COMMCON-0000112
09:30 AM - 11:00 AM: 107 - Drywall
2026-09-12 - 2024-ELEC-0005760
11:00 AM - 01:00 PM: 301 - Underground
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
2026-09-11 - 2024-ELEC-0005760
11:00 AM - 01:00 PM: 307 - Service Equipment
11:00 AM - 01:00 PM: 313 - Meter Release
11:00 AM - 01:00 PM: 301 - Underground
2026-09-10 - 2024-ELEC-0005760
08:30 AM - 09:30 AM: 301 - Underground
08:30 AM - 09:30 AM: 307 - Service Equipment
08:30 AM - 09:30 AM: 313 - Meter Release
2026-09-09 - 2024-COMMCON-0000112
01:00 PM - 02:30 PM: 107 - Drywall
2026-09-04 - 2024-COMMCON-0000112
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-09-03 - 2024-MECH-0003074
12:00 PM - 02:00 PM: 902 - Partial Rough
2026-09-02 - 2024-COMMCON-0000112
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-01 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 307 - Service Equipment
10:00 AM - 12:00 PM: 313 - Meter Release
2026-08-28 - 2025-FIRE-0003548
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-28 - 2024-ELEC-0005760
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-27 - 2025-FIRE-0003548
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-27 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-08-27 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
2026-08-27 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-26 - 2025-FIRE-0003548
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-26 - 2024-ELEC-0005760
08:30 AM - 09:30 AM: 308 - Ceiling
2026-08-21 - 2024-ELEC-0005760
01:00 PM - 03:00 PM: 308 - Ceiling
2026-08-14 - 2024-ELEC-0005760
08:00 AM - 01:00 PM: 301 - Underground
2026-08-13 - 2024-ELEC-0005760
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-08-12 - 2024-ELEC-0005760
08:00 AM - 03:00 PM: 301 - Underground
2026-08-10 - 2025-FIRE-0004263
11:00 AM - 01:00 PM: 411 - Rough
2026-08-10 - 2024-COMMCON-0000112
10:00 AM - 12:00 PM: 107 - Drywall
2026-08-10 - 2024-ELEC-0005760
01:00 PM - 03:00 PM: 301 - Underground
2026-07-23 - 2024-COMMCON-0000112
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-14 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 112 - Frame
2026-07-13 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 309 - Walls
2026-07-13 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 107 - Drywall
2026-07-08 - 2024-ELEC-0005760
11:00 AM - 01:00 PM: 309 - Walls
2026-07-02 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-07-01 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 309 - Walls
2026-06-30 - 2024-COMMCON-0000112
12:00 PM - 02:00 PM: 112 - Frame
2026-06-30 - 2025-FIRE-0004263
01:00 PM - 03:00 PM: 411 - Rough
2026-06-29 - 2025-FIRE-0004263
10:00 AM - 12:00 PM: 411 - Rough
2026-06-26 - 2025-FIRE-0004263
08:00 AM - 10:30 AM: 411 - Rough
2026-06-22 - 2024-ELEC-0005760
10:00 AM - 12:00 PM: 308 - Ceiling
2026-06-22 - 2026-PLUMB-0003687
12:00 PM - 03:00 PM: 401 - Rough
220 N Acoma ST
Recent Inspections
2026-10-27 - 2023-ELEC-0013540
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-10-27 - 2023-ELEC-0013541
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-10-27 - 2023-ELEC-0013542
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-10-27 - 2023-ELEC-0013547
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-28 - 2023-ELEC-0013540
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-28 - 2023-ELEC-0013541
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-28 - 2023-ELEC-0013547
10:00 AM - 12:00 PM: 305 - Final - Electrical
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-09-25 - 2025-ELEC-0009886
08:30 AM - 09:30 AM: 305 - Final - Electrical
1245 S York St
Recent Inspections
2026-10-27 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-10-23 - 2026-RESCON-0000746
11:30 AM - 01:30 PM: 112 - Frame
2026-10-22 - 2026-ELEC-0009616
12:00 PM - 02:00 PM: 303 - Full Rough
12:00 PM - 02:00 PM: 307 - Service Equipment
12:00 PM - 02:00 PM: 313 - Meter Release
2026-10-21 - 2026-ELEC-0009616
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-10-20 - 2026-MECH-0004332
TBD: Document Review
10:00 AM - 01:00 PM: 903 - Rough
2026-10-20 - 2026-ELEC-0009616
12:00 PM - 02:30 PM: 303 - Full Rough
12:00 PM - 02:30 PM: 307 - Service Equipment
12:00 PM - 02:30 PM: 313 - Meter Release
2026-10-16 - 2026-ELEC-0009616
08:00 AM - 10:00 AM: 303 - Full Rough
08:00 AM - 10:00 AM: 307 - Service Equipment
08:00 AM - 10:00 AM: 313 - Meter Release
2026-10-13 - 2026-ELEC-0009616
09:00 AM - 11:00 AM: 303 - Full Rough
09:00 AM - 11:00 AM: 307 - Service Equipment
09:00 AM - 11:00 AM: 313 - Meter Release
2026-10-13 - 2026-PLUMB-0005490
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-10-03 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 109 - Other
2026-10-02 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 109 - Other
2026-09-15 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-11 - 2026-RESCON-0000746
11:30 AM - 01:30 PM: 105 - Exterior Sheathing
2026-09-09 - 2026-PLUMB-0005490
08:30 AM - 11:30 AM: 403 - Pressure Test
08:30 AM - 11:30 AM: 405 - Meter Release
2026-09-08 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-09-08 - 2026-PLUMB-0005490
08:30 AM - 11:30 AM: 401 - Rough
08:30 AM - 11:30 AM: 403 - Pressure Test
2026-08-31 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-08-18 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
2026-07-17 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-16 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 113 - Pre Construction Meeting
2026-07-13 - 2026-RESCON-0000746
01:00 PM - 03:00 PM: 116 - Building Slab
2026-07-13 - 2026-PLUMB-0005566
10:15 AM - 12:15 PM: 402 - Final - Plumbing
2026-07-08 - 2026-PLUMB-0005490
08:00 AM - 10:00 AM: 400 - Groundwork
2280 S Albion ST
Recent Inspections
2026-10-26 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-10-26 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-10-26 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-10-23 - 2025-FIRE-0006225
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-10-23 - 2024-ELEC-0013842
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-10-21 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-10-21 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-20 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-10-20 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 300 - Slab
2026-10-16 - 2024-MECH-0008304
08:30 AM - 11:00 AM: 903 - Rough
2026-10-15 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-10-13 - 2024-MECH-0008306
11:00 AM - 01:00 PM: 903 - Rough
2026-10-09 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-10-08 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-10-07 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-10-06 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-10-05 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-10-01 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-30 - 2024-COMMCON-0002609
09:00 AM - 11:00 AM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
09:00 AM - 11:00 AM: 112 - Frame
2026-09-29 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-28 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-25 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-25 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-09-25 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-24 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-09-24 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
2026-09-24 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-23 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-23 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 903 - Rough
2026-09-22 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-22 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-22 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-21 - 2025-FIRE-0006225
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-21 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-21 - 2024-ELEC-0013842
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-09-18 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-17 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-16 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-09-16 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-16 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-15 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-15 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 112 - Frame
2026-09-15 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-09-15 - 2024-MECH-0008304
11:00 AM - 01:00 PM: 903 - Rough
2026-09-14 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-09-11 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-09-10 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-09 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-09 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-09-09 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-03 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-02 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-01 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-09-01 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-09-01 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-31 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-31 - 2024-MECH-0008304
08:30 AM - 11:00 AM: 903 - Rough
2026-08-28 - 2025-FIRE-0006225
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-28 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-28 - 2024-ELEC-0013842
09:00 AM - 11:00 AM: 302 - Partial Rough
2026-08-27 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-26 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-08-21 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-21 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-08-21 - 2024-PLUMB-0012646
08:30 AM - 11:30 AM: 401 - Rough
2026-08-20 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-20 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-08-20 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-20 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2025-FIRE-0006234
08:30 AM - 11:30 AM: 411 - Rough
2026-08-19 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-19 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-08-18 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-18 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-18 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 308 - Ceiling
2026-08-17 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-08-17 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 903 - Rough
2026-08-14 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-14 - 2025-FIRE-0006234
08:00 AM - 10:00 AM: 411 - Rough
2026-08-14 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-14 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-13 - 2025-FIRE-0006225
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-13 - 2024-COMMCON-0002609
08:30 AM - 09:30 AM: 107 - Drywall
08:30 AM - 09:30 AM: 109 - Other
08:30 AM - 09:30 AM: 112 - Frame
2026-08-13 - 2024-ELEC-0013842
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-08-12 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-12 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-08-12 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-11 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-08-10 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-08-10 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-07 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-07 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-06 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-08-06 - 2024-MECH-0008304
09:30 AM - 11:30 AM: 903 - Rough
2026-08-05 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-08-04 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-08-04 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 903 - Rough
2026-08-03 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-31 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-29 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-28 - 2024-COMMCON-0002609
08:30 AM - 10:30 AM: 107 - Drywall
08:30 AM - 10:30 AM: 109 - Other
08:30 AM - 10:30 AM: 112 - Frame
2026-07-27 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-27 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2025-GBO-0000004
TBD: GBO - Pre Construction Meeting
2026-07-24 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-24 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-24 - 2024-ELEC-0013842
TBD: 302 - Partial Rough
2026-07-23 - 2024-ELEC-0013842
01:00 PM - 03:00 PM: 302 - Partial Rough
2026-07-23 - 2024-MECH-0008304
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-22 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-22 - 2024-ELEC-0013842
12:30 PM - 02:30 PM: 308 - Ceiling
2026-07-21 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-07-21 - 2025-FIRE-0006234
08:00 AM - 10:00 AM: 411 - Rough
2026-07-21 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-21 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-20 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-20 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 307 - Service Equipment
2026-07-20 - 2024-MECH-0008304
09:00 AM - 11:30 AM: 903 - Rough
2026-07-17 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-17 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-16 - 2025-FIRE-0006225
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-16 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-16 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 302 - Partial Rough
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-15 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-15 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-07-15 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-14 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-14 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-14 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-07-13 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-07-13 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-07-13 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 308 - Ceiling
2026-07-10 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
2026-07-10 - 2024-ELEC-0013842
08:30 AM - 09:30 AM: 308 - Ceiling
2026-07-09 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-08 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-08 - 2024-MECH-0008304
11:00 AM - 01:00 PM: 903 - Rough
2026-07-07 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-07-06 - 2024-ELEC-0013842
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-07-01 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-07-01 - 2024-MECH-0008304
11:00 AM - 01:00 PM: 903 - Rough
2026-06-30 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-06-30 - 2024-ELEC-0013842
01:00 PM - 03:00 PM: 309 - Walls
2026-06-29 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-29 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
2026-06-29 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 305 - Final - Electrical
12:00 PM - 02:00 PM: 309 - Walls
2026-06-26 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-26 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
11:00 AM - 01:00 PM: 500 - Rough
2026-06-26 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
12:00 PM - 02:00 PM: 309 - Walls
2026-06-25 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-25 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 112 - Frame
2026-06-25 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2025-FIRE-0006234
09:00 AM - 11:30 AM: 411 - Rough
2026-06-24 - 2024-COMMCON-0002609
11:00 AM - 01:00 PM: 106 - Batt Insulation
11:00 AM - 01:00 PM: 107 - Drywall
11:00 AM - 01:00 PM: 112 - Frame
2026-06-24 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-24 - 2026-ELEC-0001446
10:00 AM - 12:00 PM: 303 - Full Rough
2026-06-23 - 2025-FIRE-0006225
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 106 - Batt Insulation
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-06-23 - 2024-ELEC-0013842
12:00 PM - 02:00 PM: 302 - Partial Rough
2026-06-23 - 2024-PLUMB-0012646
08:30 AM - 11:30 AM: 400 - Groundwork
2026-06-22 - 2025-FIRE-0006225
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2024-COMMCON-0002609
01:00 PM - 03:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
01:00 PM - 03:00 PM: 112 - Frame
2026-06-22 - 2024-ELEC-0013842
10:00 AM - 12:00 PM: 302 - Partial Rough
603 S Downing ST
Recent Inspections
2026-10-27 - 2025-RESCON-0002624
TBD: 120 - Temporary Certificate of Occupancy
2026-10-26 - 2025-RESCON-0002624
09:00 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-10-26 - 2025-RESCON-0002625
08:30 AM - 05:30 PM: 121 - Certificate of Occupancy
2026-10-19 - 2025-RESCON-0002624
TBD: Document Review
2026-10-13 - 2025-RESCON-0002625
09:00 AM - 11:00 AM: Document Review
2026-09-25 - 2025-RESCON-0002624
01:00 PM - 03:00 PM: Document Review
2026-09-24 - 2025-RESCON-0002624
09:00 AM - 11:00 AM: Document Review
2026-09-23 - 2025-RESCON-0002624
09:00 AM - 11:00 AM: Document Review
2026-09-22 - 2025-RESCON-0002625
10:30 AM - 12:30 PM: 113 - Pre Construction Meeting
2026-09-22 - 2025-RESCON-0002624
10:30 AM - 12:30 PM: 120 - Temporary Certificate of Occupancy
2026-09-21 - 2025-RESCON-0002624
11:00 AM - 01:00 PM: 108 - Final - Residential
2026-09-21 - 2025-RESCON-0002625
11:00 AM - 01:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-18 - 2025-RESCON-0002625
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
01:00 PM - 03:00 PM: Document Review
2026-09-18 - 2026-ELEC-0003621
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-18 - 2026-MECH-0001861
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-18 - 2026-PLUMB-0003611
10:00 AM - 12:30 PM: 402 - Final - Plumbing
2026-09-17 - 2025-RESCON-0002625
01:00 PM - 03:00 PM: Document Review
01:00 PM - 03:00 PM: 120 - Temporary Certificate of Occupancy
2026-09-17 - 2026-ROOFSIDE-0000996
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-09-17 - 2026-ROOFSIDE-0005479
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-09-17 - 2026-PLUMB-0000086
08:30 AM - 11:30 AM: 402 - Final - Plumbing
2026-09-16 - 2026-ELEC-0003620
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-09-16 - 2026-PLUMB-0000086
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-15 - 2025-RESCON-0002624
11:00 AM - 01:00 PM: Document Review
2026-09-15 - 2026-MECH-0002489
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-14 - 2026-ROOFSIDE-0000996
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-14 - 2026-ROOFSIDE-0005479
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-11 - 2026-ROOFSIDE-0000996
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-11 - 2026-ROOFSIDE-0005479
09:00 AM - 11:00 AM: 201 - Final - Roof
2026-09-11 - 2026-MECH-0002604
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-08-17 - 2025-RESCON-0002625
09:00 AM - 11:00 AM: 109 - Other