700 14th ST
Recent Inspections
2026-10-27 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-27 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-27 - 2026-FIRE-0001173
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-27 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-15 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-15 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-15 - 2026-FIRE-0001173
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-15 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-06 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-06 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-06 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-10-06 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-30 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-30 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-30 - 2026-FIRE-0000902
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-30 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-30 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-28 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-28 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-28 - 2026-FIRE-0000902
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-28 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-28 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-26 - 2026-FIRE-0004876
TBD: 411 - Rough
2026-09-25 - 2026-COMMCON-0001821
09:00 AM - 11:00 AM: 112 - Frame
2026-09-25 - 2026-FIRE-0004876
TBD: 411 - Rough
2026-09-24 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-24 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-24 - 2026-FIRE-0000902
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-24 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0000226
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0000820
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0000902
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0001173
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-22 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-17 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-17 - 2025-FIRE-0004792
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-17 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-16 - 2025-FIRE-0004792
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-16 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-16 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-08 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-08 - 2026-FIRE-0000820
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-08 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 304 - Partial Final
2026-09-03 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-03 - 2026-FIRE-0001175
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-03 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-26 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-26 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-20 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-20 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-19 - 2025-FIRE-0004790
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-08-19 - 2025-ELEC-0005472
08:00 AM - 10:00 AM: 304 - Partial Final
2026-08-18 - 2025-FIRE-0004790
08:30 AM - 05:30 PM: 302 - Partial Rough
2026-08-10 - 2026-ELEC-0000865
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-08-10 - 2026-ELEC-0000878
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-08-10 - 2026-ELEC-0007215
09:00 AM - 11:00 AM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0000865
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0000878
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0002314
08:00 AM - 10:00 AM: 303 - Full Rough
383 S Vine ST
Recent Inspections
2026-10-27 - 2026-MECH-0006100
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-25 - 2026-MECH-0006100
09:01 AM - 11:00 AM: 901 - Pressure Test
09:01 AM - 11:00 AM: 903 - Rough
2026-09-23 - 2026-MECH-0006100
09:00 AM - 11:00 AM: 901 - Pressure Test
09:00 AM - 11:00 AM: 903 - Rough
2026-09-22 - 2026-ROOFSIDE-0000416
08:30 AM - 10:30 AM: 201 - Final - Roof
2026-09-22 - 2026-ROOFSIDE-0000417
08:30 AM - 10:30 AM: 201 - Final - Roof
1565 N Colorado BLVD
Recent Inspections
2026-10-27 - 2026-ROOFSIDE-0000821
10:30 AM - 12:30 PM: 206 - Other
2026-10-26 - 2025-ELEC-0000477
10:00 AM - 12:30 PM: 113 - Pre Construction Meeting
2026-10-22 - 2025-COMMCON-0000596
09:00 AM - 11:00 AM: 109 - Other
2026-10-20 - 2026-ROOFSIDE-0000821
09:00 AM - 11:00 AM: 206 - Other
2026-10-19 - 2026-ROOFSIDE-0000821
10:00 AM - 01:00 PM: 206 - Other
2026-10-15 - 2025-COMMCON-0000596
10:00 AM - 12:00 PM: 107 - Drywall
2026-10-09 - 2026-ROOFSIDE-0000821
08:29 AM - 10:30 AM: 205 - Pre Inspection Commercial Flat Roof
2026-09-29 - 2025-GBO-0000029
09:00 AM - 11:00 AM: GBO - Pre Construction Meeting
2026-09-24 - 2025-COMMCON-0000596
10:30 AM - 12:30 PM: 107 - Drywall
2026-09-23 - 2025-COMMCON-0000596
10:30 AM - 12:30 PM: 107 - Drywall
2026-09-22 - 2025-COMMCON-0000596
12:00 PM - 02:00 PM: 107 - Drywall
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-09-21 - 2025-COMMCON-0000596
01:00 PM - 03:00 PM: 105 - Exterior Sheathing
01:00 PM - 03:00 PM: 107 - Drywall
2026-09-04 - 2025-PLUMB-0006080
08:30 AM - 11:30 AM: 401 - Rough
2026-09-04 - 2026-ELEC-0003034
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-09-03 - 2025-PLUMB-0006080
12:30 PM - 03:00 PM: 401 - Rough
2026-09-01 - 2025-COMMCON-0000596
11:00 AM - 01:00 PM: 109 - Other
2026-07-13 - 2025-ELEC-0004658
12:00 PM - 02:00 PM: 300 - Slab
2026-07-09 - 2026-FIRE-0000424
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-07-08 - 2026-PLUMB-0000679
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-07-07 - 2026-PLUMB-0000679
10:00 AM - 12:00 PM: 404 - Water Service
10:00 AM - 12:00 PM: 403 - Pressure Test
2026-07-06 - 2026-PLUMB-0000679
10:00 AM - 12:00 PM: 404 - Water Service
2026-06-24 - 2025-ELEC-0004658
10:00 AM - 12:00 PM: 300 - Slab
409 S Lincoln ST
Recent Inspections
2026-10-27 - 2026-PLUMB-0008740
08:00 AM - 10:00 AM: 401 - Rough
2026-10-22 - 2026-MECH-0006955
09:00 AM - 11:00 AM: 903 - Rough
2026-08-14 - 2026-RESCON-0002352
11:00 AM - 01:00 PM: 113 - Pre Construction Meeting
2026-08-11 - 2026-RESCON-0002352
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
3191 Walnut ST
Recent Inspections
2026-10-26 - 2025-COMMCON-0002588
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-23 - 2025-COMMCON-0002588
01:00 PM - 03:00 PM: 108 - Final - Commercial
2026-10-14 - 2025-COMMCON-0002588
09:00 AM - 11:00 AM: 121 - Certificate of Occupancy
2026-10-02 - 2026-FIRE-0001970
11:00 AM - 02:00 PM: 412 - Final - Fire Suppression
2026-10-01 - 2025-PLUMB-0010983
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-29 - 2025-ELEC-0013362
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-28 - 2026-FIRE-0002389
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-09-28 - 2025-PLUMB-0010983
10:00 AM - 12:00 PM: 402 - Final - Plumbing
2026-09-28 - 2026-FIRE-0001970
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-09-24 - 2025-ELEC-0013362
12:00 PM - 02:30 PM: 305 - Final - Electrical
2026-09-23 - 2025-MECH-0008295
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-22 - 2026-FIRE-0001970
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-09-22 - 2025-MECH-0008295
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-08-31 - 2026-FIRE-0002389
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-31 - 2026-FIRE-0002391
12:00 PM - 02:30 PM: 303 - Full Rough
2026-08-18 - 2026-FIRE-0001970
10:30 AM - 12:30 PM: 412 - Final - Fire Suppression
2026-07-13 - 2026-BOILERAC-0000395
09:00 AM - 11:00 AM: 704 - Final - Boiler AC
2266 N Fairfax ST
Recent Inspections
2026-10-27 - 2026-PLUMB-0003537
08:30 AM - 09:30 AM: 402 - Final - Plumbing
2026-10-26 - 2025-RESCON-0002883
10:00 AM - 12:00 PM: 108 - Final - Residential
10:00 AM - 12:00 PM: 109 - Other
2026-10-26 - 2026-MECH-0004069
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2026-ROOFSIDE-0002191
10:00 AM - 12:00 PM: 201 - Final - Roof
2026-10-22 - 2026-MECH-0003603
08:30 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-22 - 2026-PLUMB-0002842
12:30 PM - 03:00 PM: 402 - Final - Plumbing
2026-10-15 - 2026-ELEC-0005187
09:00 AM - 11:00 AM: 305 - Final - Electrical
2026-10-13 - 2026-PLUMB-0002842
12:00 PM - 03:00 PM: 403 - Pressure Test
12:00 PM - 03:00 PM: 405 - Meter Release
2026-08-13 - 2026-ELEC-0005187
08:30 AM - 09:30 AM: 307 - Service Equipment
2026-08-11 - 2026-ELEC-0005187
08:30 AM - 10:30 AM: 307 - Service Equipment
2026-07-06 - 2026-MECH-0004069
01:00 PM - 03:00 PM: 903 - Rough
2026-06-30 - 2025-RESCON-0002883
10:00 AM - 12:00 PM: 107 - Drywall
10:00 AM - 12:00 PM: 111 - Exterior Lath
2026-06-22 - 2025-RESCON-0002883
10:00 AM - 12:00 PM: 200 - Blown Insulation
1225 17th ST
Recent Inspections
2026-10-27 - 2026-MECH-0001667
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-23 - 2026-COMMCON-0000241
08:30 AM - 09:30 AM: 109 - Other
2026-10-22 - 2026-ELEC-0002322
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-10-20 - 2026-COMMCON-0000508
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-20 - 2026-COMMCON-0000514
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-10-19 - 2026-MECH-0001539
09:00 AM - 10:30 AM: 903 - Rough
2026-10-16 - 2026-MECH-0001674
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-10-15 - 2026-FIRE-0002209
08:00 AM - 10:00 AM: 411 - Rough
2026-10-14 - 2026-MECH-0001539
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-10-14 - 2026-PLUMB-0002355
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-14 - 2026-PLUMB-0002359
08:00 AM - 10:30 AM: 402 - Final - Plumbing
2026-10-13 - 2025-MECH-0007093
11:00 AM - 01:00 PM: Document Review
TBD: 904 - Final - Mechanical
2026-10-08 - 2026-ELEC-0002353
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-08 - 2026-ELEC-0002355
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-10-07 - 2026-MECH-0001711
TBD: Document Review
08:30 AM - 09:30 AM: 904 - Final - Mechanical
2026-10-06 - 2025-ELEC-0012891
10:00 AM - 12:00 PM: 308 - Ceiling
2026-10-06 - 2026-COMMCON-0000499
11:00 AM - 01:00 PM: 107 - Drywall
2026-10-05 - 2026-FIRE-0001701
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-10-05 - 2026-FIRE-0002352
10:00 AM - 12:00 PM: 412 - Final - Fire Suppression
2026-10-02 - 2025-BOILERAC-0000822
11:00 AM - 01:00 PM: 704 - Final - Boiler AC
2026-10-02 - 2026-COMMCON-0000499
11:00 AM - 01:00 PM: 109 - Other
11:00 AM - 01:00 PM: 112 - Frame
2026-10-02 - 2026-PLUMB-0002412
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-02 - 2026-PLUMB-0002448
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-10-02 - 2026-PLUMB-0002450
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-09-30 - 2025-FIRE-0007399
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-30 - 2026-FIRE-0000431
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-30 - 2025-COMMCON-0002019
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-09-30 - 2025-COMMCON-0002119
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-09-30 - 2025-COMMCON-0002155
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-09-30 - 2026-COMMCON-0000499
11:00 AM - 01:00 PM: 109 - Other
2026-09-30 - 2025-FIRE-0007368
08:00 AM - 10:00 AM: 303 - Full Rough
2026-09-29 - 2025-COMMCON-0002144
11:00 AM - 01:00 PM: 112 - Frame
2026-09-29 - 2026-ELEC-0008952
08:30 AM - 09:30 AM: 305 - Final - Electrical
2026-09-28 - 2025-ELEC-0010194
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-28 - 2025-ELEC-0010918
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-28 - 2025-MECH-0006192
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-28 - 2025-MECH-0006623
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-28 - 2025-MECH-0007093
01:00 PM - 03:00 PM: 904 - Final - Mechanical
2026-09-28 - 2025-PLUMB-0008277
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-09-28 - 2025-PLUMB-0009537
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-09-28 - 2026-ELEC-0009076
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-09-28 - 2026-PLUMB-0001351
08:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-09-25 - 2025-ELEC-0010918
10:00 AM - 12:00 PM: 304 - Partial Final
2026-09-25 - 2026-COMMCON-0000499
11:00 AM - 01:00 PM: 107 - Drywall
01:00 PM - 03:00 PM: 109 - Other
2026-09-24 - 2026-ACCCON-0000127
TBD: 305 - Final - Access Control
2026-09-24 - 2026-ACCCON-0000130
TBD: 305 - Final - Access Control
2026-09-24 - 2026-COMMCON-0000084
12:30 PM - 02:30 PM: 108 - Final - Commercial
2026-09-22 - 2025-ELEC-0010194
08:30 AM - 09:30 AM: 303 - Full Rough
2026-09-22 - 2025-ELEC-0010918
08:30 AM - 09:30 AM: 303 - Full Rough
2026-09-22 - 2026-ELEC-0002322
10:00 AM - 12:00 PM: 303 - Full Rough
2026-09-18 - 2026-MECH-0001539
09:00 AM - 11:00 AM: 903 - Rough
2026-09-16 - 2026-FIRE-0002094
08:30 AM - 10:30 AM: 303 - Full Rough
2026-09-16 - 2025-ELEC-0010194
08:30 AM - 10:30 AM: 307 - Service Equipment
2026-09-16 - 2025-ELEC-0012891
08:30 AM - 10:30 AM: 308 - Ceiling
2026-09-16 - 2026-ELEC-0002322
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-09-16 - 2026-MECH-0001652
09:00 AM - 11:00 AM: 903 - Rough
2026-09-11 - 2026-FIRE-0000450
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-09-10 - 2026-COMMCON-0000505
11:00 AM - 01:00 PM: 107 - Drywall
2026-09-09 - 2026-COMMCON-0000502
09:00 AM - 11:00 AM: 109 - Other
2026-09-09 - 2026-COMMCON-0000505
11:00 AM - 01:00 PM: 109 - Other
2026-09-08 - 2025-ELEC-0010793
10:00 AM - 12:30 PM: 305 - Final - Electrical
2026-09-04 - 2025-FIRE-0007590
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-09-04 - 2025-ELEC-0012891
08:00 AM - 10:00 AM: 308 - Ceiling
2026-09-03 - 2025-MECH-0006513
09:00 AM - 11:00 AM: Document Review
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-03 - 2026-COMMCON-0000505
11:00 AM - 01:00 PM: 112 - Frame
2026-09-02 - 2025-MECH-0006513
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-09-01 - 2026-ELEC-0002353
09:00 AM - 11:00 AM: 308 - Ceiling
2026-09-01 - 2026-ELEC-0002355
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-27 - 2025-COMMCON-0002144
09:00 AM - 11:00 AM: 112 - Frame
2026-08-27 - 2026-COMMCON-0000499
09:00 AM - 11:00 AM: 112 - Frame
2026-08-27 - 2026-MECH-0001672
01:00 PM - 03:00 PM: 903 - Rough
2026-08-26 - 2026-FIRE-0003510
08:00 AM - 10:00 AM: 411 - Rough
2026-08-26 - 2025-FIRE-0007590
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-26 - 2025-ELEC-0012891
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-26 - 2026-COMMCON-0000502
09:00 AM - 11:00 AM: 107 - Drywall
2026-08-26 - 2026-ELEC-0002358
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-08-26 - 2026-ELEC-0002859
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-08-21 - 2025-FIRE-0007399
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-21 - 2025-FIRE-0007590
10:00 AM - 12:00 PM: 302 - Partial Rough
2026-08-21 - 2026-FIRE-0000756
08:00 AM - 10:00 AM: 411 - Rough
2026-08-21 - 2026-FIRE-0001683
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-21 - 2026-FIRE-0001685
10:00 AM - 12:00 PM: 303 - Full Rough
2026-08-21 - 2025-ELEC-0012891
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-21 - 2025-MECH-0006623
09:00 AM - 11:00 AM: 902 - Partial Rough
09:00 AM - 11:00 AM: 903 - Rough
2026-08-21 - 2026-COMMCON-0000499
10:00 AM - 12:00 PM: 112 - Frame
2026-08-21 - 2026-ELEC-0002353
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-21 - 2026-ELEC-0002355
10:00 AM - 12:00 PM: 308 - Ceiling
2026-08-20 - 2026-COMMCON-0000499
09:00 AM - 11:00 AM: 109 - Other
TBD: 112 - Frame
2026-08-20 - 2026-COMMCON-0000502
10:00 AM - 12:00 PM: 109 - Other
2026-08-20 - 2026-COMMCON-0000505
10:00 AM - 12:00 PM: 109 - Other
2026-08-19 - 2026-FIRE-0001703
08:00 AM - 10:00 AM: 411 - Rough
2026-08-19 - 2025-PLUMB-0008785
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-08-19 - 2026-MECH-0001539
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-08-18 - 2026-COMMCON-0000508
10:00 AM - 12:00 PM: 109 - Other
2026-08-18 - 2026-PLUMB-0002450
08:00 AM - 10:30 AM: 401 - Rough
2026-08-14 - 2026-FIRE-0001701
08:00 AM - 10:30 AM: 411 - Rough
2026-08-13 - 2026-MECH-0001667
08:30 AM - 09:30 AM: 903 - Rough
2026-08-12 - 2026-COMMCON-0000645
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-08-07 - 2026-COMMCON-0000241
10:00 AM - 12:00 PM: 109 - Other
2026-08-06 - 2026-FIRE-0001830
08:30 AM - 10:30 AM: 303 - Full Rough
2026-08-06 - 2026-FIRE-0002237
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-08-06 - 2026-COMMCON-0000241
09:00 AM - 11:00 AM: 109 - Other
2026-08-06 - 2026-ELEC-0002358
08:30 AM - 10:30 AM: 308 - Ceiling
2026-08-06 - 2026-MECH-0001674
09:00 AM - 11:00 AM: 903 - Rough
2026-08-05 - 2026-ELEC-0002358
09:00 AM - 11:00 AM: 308 - Ceiling
2026-08-05 - 2026-FIRE-0001830
09:00 AM - 11:00 AM: 303 - Full Rough
2026-08-04 - 2026-FIRE-0001830
08:00 AM - 10:30 AM: 303 - Full Rough
2026-08-04 - 2026-ELEC-0002358
08:00 AM - 10:30 AM: 308 - Ceiling
2026-08-03 - 2026-COMMCON-0000031
11:00 AM - 01:00 PM: 109 - Other
2026-08-03 - 2026-ELEC-0003867
09:00 AM - 11:00 AM: 303 - Full Rough
2026-07-28 - 2026-COMMCON-0000514
11:00 AM - 01:00 PM: 109 - Other
2026-07-28 - 2026-MECH-0001711
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-24 - 2026-FIRE-0002008
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-24 - 2026-ELEC-0002355
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-24 - 2026-ELEC-0002859
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-24 - 2026-ELEC-0003867
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-07-23 - 2026-ACCCON-0000130
TBD: 305 - Final - Access Control
2026-07-23 - 2026-COMMCON-0000084
08:30 AM - 09:30 AM: 108 - Final - Commercial
2026-07-23 - 2026-ELEC-0001613
08:30 AM - 10:30 AM: 305 - Final - Electrical
2026-07-23 - 2026-ELEC-0003867
08:30 AM - 10:30 AM: 302 - Partial Rough
2026-07-21 - 2026-MECH-0001539
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-20 - 2026-FIRE-0002352
08:00 AM - 10:00 AM: 411 - Rough
2026-07-16 - 2025-FIRE-0007368
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-16 - 2025-COMMCON-0002657
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-07-16 - 2025-ELEC-0010793
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-15 - 2026-COMMCON-0000021
08:29 AM - 10:30 AM: 108 - Final - Commercial
2026-07-15 - 2026-COMMCON-0000508
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-15 - 2026-COMMCON-0000515
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-07-13 - 2025-ELEC-0010793
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-10 - 2025-COMMCON-0002144
09:00 AM - 11:00 AM: 112 - Frame
2026-07-10 - 2025-ELEC-0010793
08:00 AM - 10:00 AM: 308 - Ceiling
2026-07-09 - 2026-COMMCON-0000505
09:00 AM - 11:00 AM: 112 - Frame
2026-07-09 - 2026-COMMCON-0000508
09:00 AM - 11:00 AM: 107 - Drywall
2026-07-08 - 2026-FIRE-0002012
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-08 - 2026-COMMCON-0000508
10:00 AM - 12:00 PM: 107 - Drywall
2026-07-08 - 2026-COMMCON-0000624
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-07-08 - 2026-ELEC-0001613
08:00 AM - 10:00 AM: 303 - Full Rough
2026-07-08 - 2026-ELEC-0002355
08:00 AM - 10:00 AM: 307 - Service Equipment
2026-07-08 - 2026-MECH-0001667
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-08 - 2026-MECH-0001672
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-07-02 - 2026-COMMCON-0000508
11:00 AM - 01:00 PM: 107 - Drywall
2026-07-02 - 2026-COMMCON-0000514
11:00 AM - 01:00 PM: 112 - Frame
2026-07-02 - 2026-COMMCON-0000624
11:00 AM - 01:00 PM: 108 - Final - Commercial
11:00 AM - 01:00 PM: 112 - Frame
2026-07-01 - 2026-FIRE-0002830
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-07-01 - 2026-ELEC-0002859
10:00 AM - 12:00 PM: 308 - Ceiling
2026-07-01 - 2026-ELEC-0003038
10:00 AM - 12:00 PM: 305 - Final - Electrical
2026-07-01 - 2026-PLUMB-0002894
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-06-30 - 2025-COMMCON-0002144
11:00 AM - 01:00 PM: 112 - Frame
2026-06-30 - 2026-COMMCON-0000502
11:00 AM - 01:00 PM: 112 - Frame
2026-06-30 - 2026-COMMCON-0000505
11:00 AM - 01:00 PM: 112 - Frame
2026-06-30 - 2026-COMMCON-0000515
11:00 AM - 01:00 PM: 108 - Final - Commercial
2026-06-30 - 2026-ELEC-0002859
08:30 AM - 09:30 AM: 302 - Partial Rough
2026-06-29 - 2026-MECH-0002027
09:00 AM - 11:00 AM: Document Review
2026-06-27 - 2026-ACCCON-0000130
TBD: 305 - Final - Access Control
2026-06-27 - 2026-COMMCON-0000508
TBD: 112 - Frame
2026-06-27 - 2025-COMMCON-0002144
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2026-ACCCON-0000081
09:30 AM - 11:00 AM: 305 - Final - Access Control
2026-06-26 - 2026-FIRE-0002094
08:00 AM - 10:00 AM: 303 - Full Rough
2026-06-26 - 2025-COMMCON-0002144
10:00 AM - 12:00 PM: 112 - Frame
2026-06-26 - 2025-MECH-0006623
09:00 AM - 11:00 AM: 902 - Partial Rough
2026-06-26 - 2026-COMMCON-0000508
10:00 AM - 12:00 PM: 107 - Drywall
TBD: 112 - Frame
2026-06-26 - 2026-ELEC-0002353
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-26 - 2026-ELEC-0002355
08:00 AM - 10:00 AM: 308 - Ceiling
2026-06-26 - 2026-MECH-0002027
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-26 - 2026-ACCCON-0000130
TBD: 305 - Final - Access Control
2026-06-25 - 2026-FIRE-0001683
08:00 AM - 10:00 AM: 302 - Partial Rough
2026-06-25 - 2026-FIRE-0001685
08:00 AM - 10:00 AM: 306 - Final - Conduit Only
2026-06-25 - 2026-FIRE-0002110
08:00 AM - 10:00 AM: 412 - Final - Fire Suppression
2026-06-25 - 2026-COMMCON-0000084
10:00 AM - 12:00 PM: 108 - Final - Commercial
2026-06-24 - 2026-FIRE-0001129
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-06-24 - 2026-FIRE-0001381
09:00 AM - 11:00 AM: 412 - Final - Fire Suppression
2026-06-24 - 2026-COMMCON-0000084
09:00 AM - 11:00 AM: 108 - Final - Commercial
2026-06-24 - 2026-COMMCON-0000502
09:00 AM - 11:00 AM: 112 - Frame
2026-06-24 - 2026-COMMCON-0000505
09:00 AM - 11:00 AM: 112 - Frame
2026-06-24 - 2026-ELEC-0001408
08:30 AM - 11:30 AM: 305 - Final - Electrical
2026-06-24 - 2026-ELEC-0002413
08:30 AM - 11:30 AM: 305 - Final - Electrical
2026-06-24 - 2026-PLUMB-0002424
09:00 AM - 11:00 AM: 402 - Final - Plumbing
2026-06-23 - 2025-ELEC-0012891
08:30 AM - 10:30 AM: 309 - Walls
2026-06-23 - 2026-COMMCON-0000031
09:00 AM - 11:00 AM: 103 - Waterproofing
2026-06-23 - 2026-COMMCON-0000508
09:00 AM - 11:00 AM: 112 - Frame
2026-06-23 - 2026-ELEC-0002413
08:00 AM - 10:00 AM: 305 - Final - Electrical
2026-06-23 - 2026-MECH-0001717
09:00 AM - 11:00 AM: 904 - Final - Mechanical
2026-06-23 - 2026-PLUMB-0000615
08:00 AM - 10:00 AM: 402 - Final - Plumbing
2026-06-22 - 2025-FIRE-0007590
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0001830
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2026-FIRE-0002237
08:00 AM - 10:00 AM: 411 - Rough
2026-06-22 - 2025-ELEC-0012891
09:00 AM - 12:00 PM: 302 - Partial Rough
2026-06-22 - 2025-PLUMB-0008942
08:00 AM - 10:00 AM: 401 - Rough
2026-06-22 - 2026-COMMCON-0000514
11:00 AM - 01:00 PM: 107 - Drywall
2026-06-22 - 2026-ELEC-0000483
09:00 AM - 12:00 PM: 305 - Final - Electrical
2026-06-22 - 2026-ELEC-0002358
09:00 AM - 12:00 PM: 308 - Ceiling
2026-06-22 - 2026-PLUMB-0000615
08:00 AM - 10:00 AM: 402 - Final - Plumbing
900 10TH ST PLAZA
Recent Inspections
2026-10-27 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-10-22 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-10-21 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-09-28 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-09-17 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-09-09 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-08-07 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-07-02 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-07-01 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
2026-06-30 - 2025-FIRE-0005175
08:30 AM - 05:30 PM: 411 - Rough
2026-06-26 - 2025-FIRE-0005175
08:00 AM - 10:30 AM: 411 - Rough
8505 E Temple DR
Recent Inspections
2026-10-26 - 2026-RESCON-0002764
12:00 PM - 02:00 PM: 113 - Pre Construction Meeting
2026-08-07 - 2026-ELEC-0007031
12:00 PM - 02:00 PM: 303 - Full Rough
TBD: 307 - Service Equipment
TBD: 313 - Meter Release
2026-08-03 - 2017-ROOFSIDE-0002984
10:30 AM - 12:30 PM: 201 - Final - Roof
2026-08-03 - 2017-ROOFSIDE-0002985
10:30 AM - 12:30 PM: 201 - Final - Roof
2026-08-03 - 2017-ROOFSIDE-0002986
10:30 AM - 12:30 PM: 201 - Final - Roof
2026-07-29 - 2026-PLUMB-0005631
09:30 AM - 12:30 PM: 402 - Final - Plumbing